• 제목/요약/키워드: Fire Protection Design

검색결과 329건 처리시간 0.022초

소방설비 작동신뢰성 기반 건축용도별 화재리스크 분석에 관한 연구 (A Study on the Analysis of Fire Risk for each Building Usage Based on the Reliability of Operation of Fire Protection System)

  • 진승현;김혜원;서동구;권영진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.113-114
    • /
    • 2020
  • In the design and maintenance of buildings, identifying the degree of damage in the event of a fire is an important factor in fire prevention and fire safety design. In order to predict fire damage, safety measures should be established by predicting the nature of evacuation according to fire, smoke and in-house characteristics, and the effects of the operation of fire safety facilities should also be considered, but in Korea, the risk analysis due to the operation of fire safety facilities is insufficient. Accordingly, this study uses fire statistics and sprinkler inspection data to analyze the degree of fire damage caused by the operation of sprinkler facilities in a probabilistic manner.

  • PDF

A Study on Fire Spread between Office Room and Atrium in the Atrium Building

  • Lee, Su-Kyung;Kim, Jong-Hoon;Ko, Han-Mog
    • 한국화재소방학회:학술대회논문집
    • /
    • 한국화재소방학회 1997년도 International Symposium on Fire Science and Technology
    • /
    • pp.345-352
    • /
    • 1997
  • We could analyse the fire behavior using the developed software for fire safety assessment in a large space such as atrium. But Korean building law hasn't admitted the result of fire risk assessment in atrium. In the legislation fire resistant wall or shutter must be required between atrium and office rooms, That has obstructed development of building design and fire protection technique in Korea. From this point of view, we made scenarios of fire spread between atrium and office rooms, and then computed fire spread and fire phenomena using FASTLite and Breakl. In this study, we can decide that fire compartmentalization between atrium and office rooms doesn't require in Atrium building if the material and fire protection system were reliable. Consequently, Korean Fire Protection Regulations have to consider in direction of increasing freedom of building.

  • PDF

Performance-based Fire Protection Design of Domestic Super High-rise Buildings - Evaluation by ASET and RSET -

  • Roh, Hyeong-Ki
    • 한국방재학회 논문집
    • /
    • 제11권2호
    • /
    • pp.9-13
    • /
    • 2011
  • 초고층 빌딩 건설 시 요구되는 성능위주 소방설계는 인명 안전을 확보할 수 있는 능동적인 대책으로서 화재 위험성을 평가하고, 공학적 분석 결과를 토대로 하여 방재시스템을 구축하는 것으로 관련 법규 및 기준을 적용하여 수행하는 기존의 설계 방식보다 인명 안전의 확보에 있어서 매우 효율적이고 타당하다고 보여진다. 본 연구는 피난 요구 시간인 RSET과 피난이 가능한 시간인 ASET에 의한Time-line Analysis을 적용하였으며 또한 ASET과 RSET을 비교, 분석하기 위하여 화재 및 피난 시뮬레이션을 수행하였다. 연구 결과, 스프링클러설비가ASET을 증가시켰으며, 화재감지 및 경보시간의 단축이 RSET을 효과적으로 감소시켜 주고 있다. 단축된 시간은 인명의 안전을 확보하는데 많은 영향을 미치는 것으로 확인되었다. 또한 소화설비, 화재 감지 및 경보설비가 정상적으로 작동되도록 유지 관리되는 것도 중요한 것으로 파악되었다. 화재의 성상을 데이터 베이스화하고 피난 대응 프로그램 등이 구축되면 성능위주 설계에 유용한 자료로 이용될 수 있다.

소방 설계·감리업의 문제점 및 개선방향에 관한 연구 (Problems and Improvement Directions of Fire Protection Designing and Supervising Jobs)

  • 차종호
    • 한국산학기술학회논문지
    • /
    • 제16권12호
    • /
    • pp.8745-8752
    • /
    • 2015
  • 본 현재 우리나라에서 많은 사고가 일어나 많은 국민이 건강, 재산 상 피해를 입고 있다. 이러한 사고 중에는 사람이 항상 상주하는 건물에서 일어나는 화재에 의해 일어나는 피해가 적지 않은 비중을 차지하고 있으며 국내 소방 설계 감리 산업의 비중이 타 공종에 비해 많이 경시되고 있어 부적절한 설계와 더불어 부실 시공에 대한 감리가 제대로 이루어지지 않아 건물 완공 이후 화재 시에 소방설비가 제 역할을 하지 못해 큰 피해를 주는 경우가 적지 않은 상황이다. 이러한 폐해를 방지하기 위해 현재 소방시설업에 재직 중인 소방기술자 190인을 대상으로 전반적인 소방분야에 대한 문제점 및 개선안에 대하여 조사하였다. 조사결과 설계업에서는 기술자 등록 및 인력배치기준개선, 영업범위개선, 건축허가 동의요구, 시설계구비서류 개선, 소방시설 설계자의 업무책임과 권한범위를 개선하여야 하고 감리업에서는 등록기준개선, 영업범위개선, 감리 종류, 방법, 대상 및 기준개선, 보조감리원 추가 배치기준개선, 업무내용 및 범위개선, PQ제도와 공영감리제 도입 검토, 부실 감리 방지를 위한 제도개선을 하여 이러한 소방 설계 감리의 확고한 입지와 기반을 마련하여 타 공종과도 동등한 위치로써 국민의 재산과 안전을 추구하고자 함이다.

A simplified analysis of catenary action in steel beams in fire and implications on fire resistant design

  • Wang, Y.C.;Yin, Y.Z.
    • Steel and Composite Structures
    • /
    • 제6권5호
    • /
    • pp.367-386
    • /
    • 2006
  • This paper describes the results of a numerical investigation of the large deflection behaviour of steel beams under fire conditions, taking into consideration the effect of catenary action provided by the surrounding structures. The main focus is on the development, validation and application of a simplified calculation method that may be adopted in design calculations. Because no experimental result is available for validation of the simplified calculation method, the finite element program ABAQUS has been used to simulate the large deflection behaviour of a number of steel beams so as to provide alternative results for validation of the proposed method. Utilising catenary action has the potential of eliminating fire protection to all steel beams without causing structural failure in fire. However, practical application of catenary action will be restricted by concerns over large beam deflection causing integrity failure of the fire resistant compartment and additional cost of strengthening the connections and the surrounding structures to resist the catenary forces in the steel beams. This paper will provide a discussion on practical implications of utilising catenary action in steel beams as a means of eliminating fire protection. A number of examples will then be provided to illustrate the type of steel framed structure that could benefit the most from exploiting catenary action in fire resistant design.

화재수신기 Network과 통신Network 접속시 데이터 전송에 관한 연구 (A Study of Connection Data transmission to the Firereciver Network and Telecommunication Network)

  • 백동현;류근호;신승철
    • 한국화재소방학회:학술대회논문집
    • /
    • 한국화재소방학회 2012년도 춘계학술발표회 초록집
    • /
    • pp.393-396
    • /
    • 2012
  • 신호처리원과 그 방식은 네트웍 구성시 매우 중요하다. 따라서 대단위단지에서 많이 적용되고 있는 자동화재탐지설비의 화재수신기 네트웍과 통신네트웍에 접속시와 수신기에서 발생하는 통신 데이터를 일반 통신네트윅에 접속하여 발생하는 데이터전송시 문제점에 대하여 고찰한 것이다. 경보설비의 구성에서 중계기와 수신기간의 통신 형태를 측정하여 보편화된 통신방식을 사용하였다는 것을 알 수 있었으며 수신기에서 통신네트윅간의 연결은 수신기의 Ethernet 통신모듈을 통한 프로토콜 형태를 확인하였다.

  • PDF

유비쿼터스 시스템을 이용한 소방설비 (Fire Protection equipment for Ubiquitous System)

  • 김남오;민완기;김병철;신석두;강원찬
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 학술대회 논문집 전문대학교육위원
    • /
    • pp.139-144
    • /
    • 2005
  • In this paper, We are going to propose the fire protection system with using CAN(Controller Area Network). The larger, higher and deeper buildings are, the more dangerous people are when fire happens. We should be aware of the problems of prior fire protection system. Therefore, we construct embedded system based on CAN communication that is capable of N:N communication, and build independent fire protection system. If the fire is occurred on the building, the problem is that how fast we can detect the fire and put off it by using available system, this is major factor that reduces damage of our wealth, therefore in this studies We would like to design more stable system than current system. this system that is based on CAN communication which is available N:N communication constructs and is designed to compensate for each fault so that our aim is to reduce the line of system and cost of installation and to suppose future type fire protection system. We are simulated by NIST FDS(Fire Dynamics Simulator) to prove the efficiency of this system.

  • PDF

분당선 한강 하저터널의 방재시스템 (Preventing disaster system of the subaqueous tunnel under the Han river in the Bundang railway)

  • 김용일;황낙연;윤영훈;지홍근;장성욱;김동현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.308-327
    • /
    • 2004
  • As use of tunnels and subways increase there also are accidents proportionate to it. Daegu Subway Station fire, Hongjimoon tunnel fire led people to be conscious of disaster protection and as a result, there is a trend to adopt standards for fire protection. Accordingly, this thesis is focused on investigating various fire and water protection related issues for subaqueous tunnel under Ran river. The thesis developed evacuation and disaster prevention plan as fire level increases and have identified the suitability of disaster prevention through evacuation and fire simulation, countermeasure of a water leakage during construction and operation considering the subaqueous tunnel. And we selected EPB shield TBM equipment considering the ground condition and effect of boring hole, and accomplished reasonable water protection design through setting goals using event-tree method, as well as examining model test of boring hole and flooding in heavy rain. Also included structured total system consist of water leakage sensing system, water protection gate, pumping system and fire protection system to respond systematically in emergency.

  • PDF