• Title/Summary/Keyword: Finishing work

Search Result 283, Processing Time 0.025 seconds

A Study on the Application Method of Photovoltaic in Building (PV의 건축물 적용기법에 관한 연구)

  • Lee, E.J.;Kim, H.S.
    • Journal of the Korean Solar Energy Society
    • /
    • v.22 no.2
    • /
    • pp.1-10
    • /
    • 2002
  • This study is a study on the building integrated method of Photovoltaic. It was analyzed into a basic installation condition and an integrated form in this study. And it was confirmed through the 3D simulation & drawing work of an integrated situation to the real domestic building. The Photovoltaic installation of the country to an optimal efficiency for the year must be installed to the due south with an angle of thirty degrees. And also a module spacing must be more than doubled from the bottom to the top of module to prevent from efficiency falling by a shadow of photovoltaic module in a roof setting of flat roof. If Photovoltaic module is an adequate material that is a basic requirement as a building's finishing material, it's not only an efficiency of alternation with an existing finishing material but also a building's design element.

DESIGN MANAGEMENT FOR CONSTRUCTABILITY REVIEW OF HIGH QUALITY EXPOSED CONCRETE

  • Doo Won Hwang;Young woong Song;Yoon ki Choi;Dong Woo Shin;Jae Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1154-1157
    • /
    • 2005
  • This report is to do design management for constructability review of high quality exposed concrete, which is used increasingly in recent. To secure systematic management at design phase, we reviewed each definition and work at each design phase, we define high quality exposed concrete, a part of architectural concrete, as "an exposed concrete which has well ordered joint & is in pursuit of smooth surface." We reviewed requirements and influential factor to obtain High quality finishing surface and compared construction process of high quality exposed concrete with that of other finishing method. Management method at each design phase for constructability review to meet additional works and requirements is presented.

  • PDF

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

The Improvement Plan of Design Process by Case Study of Steel Structural Work (철골공사 현장조사를 통한 설계프로세스 개선방안)

  • 방성원;오승준;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.121-126
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying tine and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

  • PDF

A Heuristic Approach to the Shift-scheduling Considering the Balance of Work-load in Nuclear Power Plants (호텔 요리사의 인간공학적 작업 위험성 평가)

  • Kim, Dae-Ho;Yun, Young-Su;Lee, Yong-Hee
    • Journal of the Ergonomics Society of Korea
    • /
    • v.25 no.4
    • /
    • pp.1-7
    • /
    • 2006
  • The purpose of this study is to develop an efficient algorithm for the management of the shift schedule in nuclear power plants in consideration with the ergonomic criteria and the regulatory codes. The ergonomic criteria considered are the work hours, overtime-work frequency and working time, start and finishing time of works, allocation of rest times and duty-offs, rotating of shifts, etc. to comply with the regulations such as the Labor Standard Act, the ILO Convention No. 171, 178, "the detailed content of a periodic safety review," enforcement regulations 19-2 of the Atomic Energy Act. The developed algorithm for the shift schedule program adopts a heuristic method to minimize the difference the workload for shift workers in nuclear power plants.

The Improvement Plan of Design Process by Case Study of Steel Structural Work (현장조사를 통한 철골공사 설계프로세스 개선방안)

  • Bang, Sung-Won;Kim, Jin-Ho;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.111-118
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

CHARACTERISTICS OF ACCIDENTS IN CONSTRUCTION PROJECT IN KOREA

  • Kyeong-Seok Chae;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.603-608
    • /
    • 2011
  • According to the labor related data from Korea Occupational Safety & Health Agency, accident victims of construction industry are increasing 6% annually since 2006. The major reason why the rate of accidents increases in Korea is that lots of labor working with another trades works simultaneously in various type of works. This study analyzes the current accident status in view of the type of building, type of works, and project size for the latest 3 years (2007~2009). As a result, 'single family & semi-detached houses' has the largest number of accidents among buildings. In addition, 'finishing work' shows the highest number in terms of work type. For the size, accidents occurred much for 'less than 300 million'. The results of this study can be used to focus on managing the highly hazardous area where the construction accidents mostly occur; therefore, it is anticipated to contribute to improve efficiency of safety management.

  • PDF

A Study on Residual stress at Cutting work (절삭가공시 잔류응력에 관한 연구)

  • 주호윤
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.6 no.3
    • /
    • pp.111-117
    • /
    • 1997
  • The sudden-stop apparatus is made to measure the residual stress of the infinitesimal area at the turning work surface by using the X-ray stress apparatus. This study is trued to make the cutting work the instantaneous stopping state in the normal working state. The behaviour of work material near the tool is estimated. The estimation method is that the distribution of residual stress can be also measured. The object is to clarify and control the mechanism to leave the adequate stress of the finishing surface. It's beginning is due to observe the occurrence state of the residual stress at the cutting work. The result obtained by this study is as follows. The chips are not separated from the work materials at all the cutting experiments of built-up edges or the shearing areas etc. which can be precisely observed by using the sudden-stop apparatus. The strain of movable system which can be seen at the part of working layer means the size of strain. This experiment proves that the working strain should be lessened to make the size of strain control the residual stress happened at the cutting surface.

  • PDF

Nexus based Quality Inspection Support Model for Defect Prevention of Architectural Finishing Works (하자예방정보 넥서스 기반 건축마감공사 품질점검 지원 모델)

  • Lee, Hye-Rin;Cho, Dong-Hyun;Park, Sang-Hun;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.59-67
    • /
    • 2017
  • At the completion of the construction, various finishing processes are concentrated. This imposes a burden on the on-site manager and imposes on experience based quality control, thereby causing deviations in the quality of construction depending on supervisor or worker's individual competence. In addition, the information related to quality control is frequently scattered in various types of documents such as specifications and drawings, and checkpoints are frequently omitted. It is necessary to provide a tool that can effectively provide the practitioner before or during the inspection work by systematically storing the information related to the defect prevention and linking them in a mutually referential state. This paper proposes an quality inspection support model that can systematically store necessary information on activity or room basis for the quality check of the apartment house finishing work. Establish a defect prevention information base and a information nexus by linking specifications, design standards, checklists, regulations, defect cases, and drawings to the finishing process and the rooms. Based on this, information registration and search interface are presented. It can contribute to securing a certain level of construction quality or more by suggesting a frame that can be utilized by linking various defects prevention information with the focus on closing activity and room.

Evaluation of Bisphenol A-Epichlorohydrin Exposure Workers in Apartment Building Construction: Pilot Study (아파트 건축 작업장에서 사용되는 에피클로로하이드린-비스페놀A의 노출 평가: 파일럿 연구)

  • Shin, Wonho;Moon, Chan-Seok
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.26 no.4
    • /
    • pp.396-403
    • /
    • 2016
  • Objectives: The study is to evaluate biological monitoring and risk assessment for epichlorohydrin-bisphenol A resin exposed from waterproofing or finishing work in the apartment building construction. Methods: Subjected workers were working on spray-painting and waterproofing work for 8 hours per day every 20 days. The urine samples were collected at the end of 20 days working period. For urinary bisphenol A as metabolite from epichlorohydrin-bisphenol A exposure, urine samples were analyzed with liquid chromatography mass-mass spectrometry(HPLC-MS/MS). Results: Geometric means of urinary bisphenol A(BPA) with no hydrolysis and with enzymic hydrolysis(BPA-EH) in the workers were $1.10{\mu}g/L$ and $2.90{\mu}g/L$. BPA-EH was 4 times higher than that of control group. The factors for working period and ages did not affect the variation of BPA and BPA-EH. The levels for BPA and BPA-EH were not higher than 95th percentile for exposure on human-life environment. Conclusions: The BPA and BPA-EH were therefore effective biological markers for epichlorohydrin-bisphenol A exposure workers, but not seem to hazardous exposure level. Waterproofing work in construction workshop is required to measuring work environment and health care management for the workers.