• 제목/요약/키워드: Finishing work

검색결과 283건 처리시간 0.026초

조기출퇴근제 실시에 따른 부부의 생활시간에 관한 연구 (The Effects of new Work Schedule on the Allocation of Time by Married Couple)

  • 홍향숙
    • 대한가정학회지
    • /
    • 제32권2호
    • /
    • pp.49-60
    • /
    • 1994
  • Recently there has been new work schedule developed in some companies which means starting the work at 7 and finishing at 4 This article studied on the effects of new work schedule on the time allocation by married couples. It was compared with the time spent by married couples in group of old work schedule. And it studied whether the change of work schedule affects the time allocation and satisfaction of couples. This survey was conducted from November to December 1993 One hundred and twenty none couples were considered to be valid sample for this study. The findings of this study are as follows: 1. Couples with new work schedule did perceive changes in the time allocation. 2. The total time for transportation and market work of husbands was decreased and leisure time showed a increase when there is new work schedule. 3. Husbands with new work schedule perceived that they spent more time in the household work leisure sharing with their children and sharing with spouses than husbands with old work schedule. 4. Couples with new work schedule showed higher marital satisfaction and family life satisfaction than couples with old work schedule.

  • PDF

絹織物 Wash and Wear 加工硏究 (Studies on Silk Textile Wash and Wear Finishing)

  • 최병희;이양후
    • 한국잠사곤충학회지
    • /
    • 제23권1호
    • /
    • pp.47-55
    • /
    • 1981
  • 絹織物加工을 實需要者의 利用度를 增加시키기 爲해 多年間 여러 사람에 의하여 硏究되어 왔으나 天然織維이기 때문에 加工方式으로 性質을 變化시키기는 어려워서 滿足스러운 精度로 이루어지지 못하고 있는 實情에 있다. 絹織物加工은 勿論 그 缺點을 補强하는 同時에 商品的價値도 向上시키는데 目的이 있는데 때로는 有名商標가 品質以上으로 販賣를 左右하는 例도 많다. 特히 絹制品은 歡迎을 받지 못하고 있는 實情에 있다. 이러한 問題點을 解決하기 爲해 筆者는 多年間 硏究를 持績하여 왔든바 一般絹織物의 浸潤後 乾燥時間보다 半減된 時間에 乾燥되는 所謂 Wash and Wear絹加工方法의 開發을 하기에 이르렀다. 그리고 그 加工費用이 極히 經濟性인 탓으로 아무런 부담감 없이 加工處理할 수 있는 特徵을 갖이고 있었다. 1. 繭絲는 吐絲營繭曲線이 S字型으로 되어 있어 浸潤時에는 原狀復舊의 性質이 있어 屈曲狀態를 이룩하게 되어 本加工絹織物이 Wash and Wear이기는 하나 가벼운 다림질이 必要하였다. 2. 이러한 加工은 絹絲蛋白質의 變性을 加工過程에서 1% D.I.S.溶液에 3時間 處理하여 變性誘發시킴으로서 可能하였다. 3. 加工絹의 防皺度, 剛乾度를 洗濯回數를 反復하면서 調査하여 본 結果 未處理絹보다 惡化되지 않았다. 4. 未加工絹도 水洗, 乾燥를 反復하게되면 스스로 變性되는 事實을 알았다. 5. 處理絹과 未處理絹의 强力伸度面의 差異가 없었다.

  • PDF

고속 가공을 이용한 금형의 효율적 생산 제 1 부: 이송 위상차와 런아웃이 가공면에 미치는 영향 (High Speed Machining Considering Efficient Manual Finishing Part I: Phase Shift and Runout Affecting Surface Integrity)

  • 김민태;제성욱;이해성;주종남
    • 한국정밀공학회지
    • /
    • 제23권12호
    • /
    • pp.30-37
    • /
    • 2006
  • In this work, the surface integrity smoothened with a ball end mill was investigated. Because surface integrity mainly affects the manual finishing process, $RV_{AM}$(Remaining Volume After Machining) was introduced, and it gives the relation between machining process and finishing process. Runout and phase shift which adversely affect surface integrity were considered in the generation of surface topography. Cutting points in ball end milling were identified with positional vectors and a set of vectors which have the minimum height in unit area was selected for the generation of surface and $RV_{AM}$. $RV_{AM}$ variation according to runout and phase shift was calculated and experimentally verified in proposed HSM conditions for mold machining. From the simulations and the experiments, a desirable High Speed Machining condition was suggested.

최근 서울시 중형 OFFICE 건물의 실내재료의 사용경향에 관한 연구 (A Study on the Using Trends of Interior Materials in Current Medium Size Office Building in Seoul)

  • 김은중
    • 한국실내디자인학회논문집
    • /
    • 제23호
    • /
    • pp.19-25
    • /
    • 2000
  • This study aims by analysing the interior design elements trends of current medium size office buildings in Seoul. The analysing objects are ceiling, floor, wall, and illumination plan of current office buildings. Analysing tools are finishing material and color of each part. Analysing areas are lobby area, deskwork area, conference area, welfare area, public area(rest room, corridor, stair). The interior design elements of lobby shows a lots of different features then the other areas in ceiling, floor, and wall design. Such difference appears at finishing material especially, and the coloring is more splendorous then the other areas. Desk work area and conference area have similar characteristics in finishing materiors and colors, and they usually follow the needs of function. Walfare area shows more splendorous feature then deskwork and conference area, and designed by various materials and colors. Public area also shows very active design concept then past times.

  • PDF

BIM 기반 물량 산출의 정확성 검증 - 마감공사 공종을 중심으로 (A Verification of the Accuracy in BIM-Based Quantity Taking-Off - Focusing on Finishing Work)

  • 김지현;윤수원
    • 한국BIM학회 논문집
    • /
    • 제3권2호
    • /
    • pp.1-9
    • /
    • 2013
  • Currently, various studies and applications related BIM based quantity take-off have been attempted, because of the accuracy of cost estimating and reliability by using the BIM model information in automatical calculation. Finishing works that have a large number of various types and materials need the higher accuracy and reliability on the BIM-based quantity take-off. Therefore, this study compared and analyzed 2D and 3D based quantity through Test-bed and determine the cause of the quantity difference. This verified the accuracy and efficiency in the BIM-based quantity take-off for finishing works. Also this study has been proposed opinions for calculating the exact BIM-based quantity take-off.

DEVELOPMENT OF MATERIAL TRACKING SYSTEM USING WIRELESS TECHNOLOGY IN HIGH-RISE BUILDING

  • Jae-Goo Han;Min-Woo Lee;Soon-Wook Kwon;Moon-Young Cho
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1017-1021
    • /
    • 2005
  • There is a need for effective tracking and control of material loading and delivery time especially during the finishing-work phases to eliminate the need for lay-down space on the site. Hence, it is essential to monitor the relevant information regarding material procurement in construction sites, and it is also the key factor for successful site control and the adoption of the Just-in-Time concept for high-rise building construction. The purpose of this study is to test RFID's readability in order to develop a finishing material monitoring system through the application of RFID technology.

  • PDF

건설공사의 안전관리정보시스템 개발;터널공사 중심으로 (Safety Management Information System in Construction Work;Focus on Tunnel Work)

  • 박종근;백신원
    • 한국안전학회지
    • /
    • 제23권4호
    • /
    • pp.72-78
    • /
    • 2008
  • In any form of construction work, it is essential that accidents be prevented at every stage from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instruction for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we presents a model that assesses risk quantitatively by analyzing risk factors involved in stage of construction such as foundation work, erection work, structural work, equipment work, finishing work and etc work. The model performs assessment based on examples of accidents and by investing actual conditions during construction. In addition, we presents in this paper a safety management system was developed to assess risk during construction and to effectively train laborers.

심리적 의식과 물리적 요소의 상관성 분석을 통한 가로경관 개선사업 평가에 관한 연구 - 부산시 광복로를 대상으로 - (A Study on the Evaluation for the Improvement of Streetscape through Relationship Analysis between Psychological Consciousness and Physical Elements - Focused on the Gwangbok Street, Busan -)

  • 양재혁;이강희
    • KIEAE Journal
    • /
    • 제9권6호
    • /
    • pp.37-44
    • /
    • 2009
  • This study conducted an evaluation of the streetscape improvement project of the Gwangbok Street through analysis of correlations between psychological consciousness and physical elements in the street by comparing selected pictures of streetscape before and after the project. This work has conducted an analysis of Psychological characteristics by semantic differential method and an analysis of physical elements which influence psychological characteristics by regression analysis. According to the results of psychological analysis, the senses of interest, orderliness, esthetic and preference were highly improved in A district and the senses of openess, stability, orderliness were highly improved in B district. The results of analyzing physical elements influencing the improvement of these psychological consciousness in A district elucidated ; 1) the works of improving signboard and elevation of the building affected the whole these psychological consciousness, 2) the work of planting trees, making plant rests in the street improved the senses of orderliness, esthetic, 3) the work of changing finishing materials in the street enhanced the senses of esthetic, preference, 4) the work of adjusting the width between the road and the pavement, the work of improving traffic enhanced the senses of interest, preference. In the meantime in B district, the works of improving signboard and elevation of the building and those of planting trees, making plant rests in the street improved the senses of openess and orderliness. Also the work of improving traffic enhanced the senses of openess, stability and the work of expanding the pavement, that of changing finishing materials in the street improved the senses of openess, stability, orderliness.

건설공사의 안전관리정보시스템 개발 - 아파트공사 중심으로 - (Safety Management Information System in Construction Work - Focus on Apartment Work -)

  • 박종근
    • 한국안전학회지
    • /
    • 제24권6호
    • /
    • pp.124-131
    • /
    • 2009
  • In any form of construction work, it is essential that accidents be prevented at every stage, from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instructions for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we present a model that assesses risk quantitatively by analyzing the risk factors involved in each stage of construction, such as foundation work, temporary work, structural work, equipment work, and finishing work. The model performs assessment based on examples of accidents and by investigating actual conditions during construction. In addition, we present in this paper a safety management system developed to assess risk during construction and to effectively train laborers.

업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스 (A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase)

  • 한지호;남동희;박상헌;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF