• Title/Summary/Keyword: Finishing Work Duration

Search Result 8, Processing Time 0.024 seconds

Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment (공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kim, Min Ju;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.68-69
    • /
    • 2015
  • Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.

  • PDF

The Conceptual Framework of Concurrent Construction Method for EIFS in Apartment (공동주택용 외단열 적층시공 공법 개념모델 개발)

  • Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.413-423
    • /
    • 2015
  • Exterior Insulation and Finishing System(EIFS) is recognized as a promising alternative for energy reduction as energy reduction ratio of apartment is to be increased from 40% to 60% in 2017. However, EIFS is not actively applied to apartment because additional construction costs and duration are required for the current existing construction method of EIFS. Therefore, this study proposes a conceptual framework for concurrent construction method of EIFS which can reduce construction costs and duration by working sequentially from frame work to exterior insulation finishing work, and then verify the method's feasibility by analyzing a case study. It has been proven from the analysis that concurrent construction method of EIFS reduces 6.7% of construction duration and 13% of construction costs compared with the conventional exiting method. The proposed method is expected to contribute to invigorated application of EIFS to apartment.

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

Studies on Silk Textile Wash and Wear Finishing (絹織物 Wash and Wear 加工硏究)

  • Choe, Byong-Hee;Lee, Yang-Hoo
    • Journal of Sericultural and Entomological Science
    • /
    • v.23 no.1
    • /
    • pp.47-55
    • /
    • 1981
  • Silk textile finishing has been studied for many years by many workers in order to meet more utilities for various endusers. Such studies, however, could not be successful because any natural fibers are hardly change their natures by artificial treating methods. Textile finishing is of course to improve the mechandise qualities and the poor natures of silk so that it may be available as the best textile fiber in the world. Sometimes, famous trade marked textile plays more power than its quality in the silk market, nevertheless, this should be over line of research activities. Meantime, the silk demand has been also transferred from ladies stocking to other clothes since nylon or other synthetic fibers were developed. That is why, the extension of silk demand should be developed by various research works. Specially, silk is known as difficult textile to handle it during washing or ironing process which happened to depress down the silk usage for house wives. In order to solve such problems, the reporter has been worked for many years and now, he believes that he has developed a proper finishing method to coversuch problems. The developed finishing method may be said to eligible with economical aspect and shorten the dry duration after water washing in half against normal silk textile without harming the specific silk nature. As all of us know, silk fiber starts to denature since it was spinned by silkworm and the fiber is formed as overlapped "S" type curves during its concooning process. After it is made as raw silk or sericin silk, it shows as straight line form, but it changes in to waved form in case refining or degumming process in order return to its original spinned form. Such nature is continued during its textile form and ends with hard ironing nature than other textile fibers. Mean while, the silk fiber keeps to continue its denaturing and this is iniciated by repeat of washing and drying which takes many years to reach its final stage, The reporter has found the iniciating denature of silk by his finishing process, with out heat, decreasing the swollen nature which ended with shortening the drying duration after wash. Each washing was carried out by soaking the previously weighed sample in cold water for one hour, then pressed the sample for ten minutes to eliminate its free water component before weighing with same condition. According to this, the treated silk showed much denaturing after the finishing, but the standard silk progressed the denaturing by and by with the repeat of washing and drying, finally reached the same swollen degree of treated silk, Such treating result explains that the treated silk happened to be stebilized nature by the treating immediately. On the other that the treated silk happened to be stebilized nature by the treating immediately. On the other hand, standard silk may reach to such condition by the time of worn out clothes after repeat of washing and drying for many years while the clothes will be no more useful. The decreased swelling nature has brought about the drying period in half against standard silk after all. Not only the tests of tenacity and elongation but also crease resistance recovery, stiffness and shrinkage tests were carried out after each washing and drying which he has found better result on the treated silk textile against the standard silk. The most important thing was to keep the textile feeling of silk by such finishing work before improve any poor nature of silk. The general silk has a nature to absorb smoke or dirt from its surrounding air and reaches to dirty color shade upon such exposure, but the treated one has improved such nature because of its artificial denaturing, another word, it keeps clean longer than the normal silk. Many previous finishing works could improve some specific nature of silk, but it happened to deprave other important natures. The reporters work is, however, specialized to improve the silk to be useful as Wash and Wear Silk without harming its standard natures. So far, this work happened to be a overall innovative finishing method of silk textile.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Development and Application of Unit Table Form using Euro Form for High-rise Building Construction (초고층 건축공사를 위한 유로-유닛 테이블폼 공법 개발 및 적용에 관한 연구)

  • Yang, Sung-Woo;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.45-52
    • /
    • 2008
  • In today's construction, there has been an increase in the construction of high-rise buildings due to the need to maximize land usage. Framework affects not only the entire construction duration and cost, but also subsequency construction activities such as electrical, mechanical, and finishing works. Especially, proper formwork is a influential factor of productivity in the framwork of reinforced concrete construction. To that reason, a table form of system form is more frequently used than conventional form. However, an initial cost of the table form is high and a reused table form needs for workers to repair damaged table forms. Therefore, the goal of this study is to introduce euro-unit table form. The results from the application of euro-unit table form to high-rise residentia building construction are as follows : (1) The cost of producing table form reduced by 16%, and (2) The time of producing table form was slumped by 35%, and (3) The labor force needed for form work declined 21%.

Development of Quantitative Decision Support Model for Optimal Form-Work Based on Construction Site Type (건축 공사현장 유형별 최적 거푸집 공법선정을 위한 정량적 의사결정 지원모델 개발)

  • Kim, Oh-Hyung;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.56-68
    • /
    • 2019
  • An optimal selection of form-work is very important in the construction project in terms of construction cost and duration management. Also, it substantially affects the quality of the structure and the finishing work. However, in South Korea, the decision making on the selection of form-work has been based on the experience and intuition of construction practitioners not on the objective data or rational decision-making system. In order to solve the problem, several types of research on the selection of form-work has been processed. However, they did not consider the construction site condition, which is one of the most important factors for the selection of form-work. Thus, the objective of this study is developing the objective decision supporting system considering the site condition. This study provides the quantitative decision support model for optimal form-work based on construction site type. It is expected that the decision support model will help the practitioners decide optimal form-work based on the objective data. It will ameliorate the existing decision making process using experience and intuition. In addition, because the model considers site-conditions, it will provide more accurate and appropriate decision on the selection of an optimal form-work.