A Parallel Genetic Algorithm for Solving Deadlock Problem within Multi-Unit Resources Systems

  • Ahmed, Rabie;Saidani, Taoufik;Rababa, Malek
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.12
    • /
    • pp.175-182
    • /
    • 2021
  • Deadlock is a situation in which two or more processes competing for resources are waiting for the others to finish, and neither ever does. There are two different forms of systems, multi-unit and single-unit resource systems. The difference is the number of instances (or units) of each type of resource. Deadlock problem can be modeled as a constrained combinatorial problem that seeks to find a possible scheduling for the processes through which the system can avoid entering a deadlock state. To solve deadlock problem, several algorithms and techniques have been introduced, but the use of metaheuristics is one of the powerful methods to solve it. Genetic algorithms have been effective in solving many optimization issues, including deadlock Problem. In this paper, an improved parallel framework of the genetic algorithm is introduced and adapted effectively and efficiently to deadlock problem. The proposed modified method is implemented in java and tested on a specific dataset. The experiment shows that proposed approach can produce optimal solutions in terms of burst time and the number of feasible solutions in each advanced generation. Further, the proposed approach enables all types of crossovers to work with high performance.

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (효율적인 품질관리를 위한 공동주택 하자위험 분석)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.510-519
    • /
    • 2019
  • The aim of this study was to set a defect classification framework and evaluate the defect risks in apartment buildings For this, approximately 15,056 defect items for 133 apartment buildings were examined. As a result of the analysis, the major defect of the RC work was cracks, which were found mainly in public locations. Moreover, the RC work was found to exhibit a high defect risk of water problem and surface appearance, which are highly connected with cracks. Second, the finish work has a high defect risk because it is composed of various work types, and there are many kinds of materials and construction parts involved. Third, the major defects of the waterproof work were incorrect installation and missing tasks, which have high defect risks in the garage. This is because defects that require rework occur mainly in the underground garage. Based on these results, this study proposed countermeasures for defect risk management to be considered in the construction, handover, post-handover, and occupancy phases. These have been set in detail based on the three zones: low frequency high severity (LFHS), low frequency low severity (LFLS), and high frequency low severity (HFLS).

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

Analysis of Cutting Properties with Reference to Amount of Coolant used in an Environment-Conscious Turning Process

  • Yang, Seung-Han;Lee, Young-Moon;Kim, Young-Suk
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.12
    • /
    • pp.2182-2189
    • /
    • 2004
  • In the recent years, environmentally conscious design and manufacturing technologies have attracted considerable attention. The coolants, lubricants, solvents, metallic chips and discarded tools from manufacturing operations will harm our environment and the earth's ecosystem. In the present work, the Tukey method of multiple comparisons is used to select the minimum level of coolant required in a turning process. The amount of coolant is varied in 270 designed experiments and the parameters cutting temperature, surface roughness, and specific cutting energy are carefully evaluated. The effects of coolant mix ratio as well as the amount of coolant on the turning process are studied in the present work. The cutting temperature and surface roughness for different quantity of coolant are investigated by analysis of variance (ANOVA) - test and a multiple comparison method. ANOVA-test results signify that the average tool temperature and surface roughness depend on the amount of coolant. Based on Tukey's Honestly Significant Difference (HSD) method, one of the multiple comparison methods, the minimum level of coolant is 1.0 L/min with 2% mix ratio in the aspect of controlling tool temperature. F-test concludes that the amount of coolant used does not have any significant effect on specific cutting energy. Finally, Tukey method ascertains that 0.5 L/min with 6% mix ratio is the minimum level of coolant required in turning process without any serious degradation of the surface finish. Considering all aspects of cutting, the minimum coolant required is 1.0 L/min with 6% mix ratio. It is merely half the coolant currently used i.e. 2.0 L/min with 10% mix ratio. Minimal use of coolant not only economically desirable for reducing manufacturing cost but also it imparts fewer hazards to human health. Also, sparing use of coolant will eventually transform the turning process into a more environment-conscious manufacturing process.

A Study on the Mechanized Construction for Common Ducts in a Road Tunnel (도로터널 공동구의 기계화 시공에 관한 연구)

  • Moon, Kyoung-Sic;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1937-1944
    • /
    • 2014
  • In recent years, common ducts have been installed and operated in the sidewalls of tunnels to prepare for emergencies in tunnel construction and maintenance. The installation of common ducts is done mainly by humans. Problems with cost increases are inherent in tunnel construction by humans due to the safety risks and the economic inefficiency of humans performing construction activities. Among the problems that arise are poor illumination due to the use of temporarily installed electricity, the risk of accidents due to the confined workspaces, and workers avoiding work tasks because of the poor environment in tunnel. Ideas for solving these problems were developed using a value engineering (VE) process, and mechanized construction was identified as a promising solution. To verify the effectiveness of mechanized construction of a common duct in tunnels, experimental construction work was carried out, and mechanized construction was proven to directly improve the constructability and economic efficiency of common duct construction. In addition, reducing human involvement in common duct construction in tunnels is expected to improve safety, and because of the continuous concrete placement technique used, the finish and appearance of the ductwork are improved.

Reengineering of TACT Process Management Analyzed on Task Information (업무정보 분석을 통한 TACT공정관리 프로세스 재설계)

  • Kim, Ok-Kyue;Park, Jun-Mo;Kim, Beop-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.113-124
    • /
    • 2012
  • TACT process reengineering is applied to the finish work of apartment buildings and extra tall buildings to conduct efficient process control in Korea. Non-systemized information on the performances, however, causes difficulties in building a database for such records and it takes long time to find the relevant information. In order to solve such problems, scientific and quantitative understanding on the construction information and data is required to perform TACT process reengineering satisfactorily and also proper management plan should be provided for the working level staff to understand the required information and data more easily. In this regard, this paper reorganizes the TACT process reengineering based on the general process control and classifies the items of required information to redesign. Redesigned process was verified by specialists making use of work-information matrix. As a result, paper contributed to increasing comprehension level of the working level people and when the persons in charge are transferred to other duty, it makes them understand all the working procedure faster, which enables the departments involved to carry out their cooperation and adjustment more efficiently.

Airtightness of Light-Frame Wood Houses built in Daejeon and Chungnam Area

  • Jang, Sang-sik;Ha, Been
    • Journal of the Korean Wood Science and Technology
    • /
    • v.45 no.2
    • /
    • pp.147-158
    • /
    • 2017
  • Among the energy consumption in building, the heating energy takes the largest part. Therefore, it is important to minimize the heat energy loss in building for the reduction of overall energy use in construction. The most important points for the minimization of energy loss in building are insulation and airtightness. Especially, in wood houses, airtightness is very important for energy saving as well as increase of durability. However, the researches on airtightness of wood buildings have been started recently and are very deficient especially in Korea. In this study, air leakage properties and airtightness performance were evaluated for light-frame wood houses built in Daejeon and Chungnam area. Total 7 houses were evaluated, among which four houses (Case 1 to Case 4) were in the construction stage before interior finish and the other three houses (Case 5 to Case 7) were after completion of construction work. The tests for airtightness were conducted by pressurization-depressurization method, and the factors included in the measurements includes air leakage rate at 50 Pa (CMH50), air change rate at 50 Pa (ACH50), equivalent leakage area (EqLA) and EqLA per floor area. As a result of this study, key air leakage points in wood houses were found to be the gaps between floor and wall, the holes for wiring and plumbing, the double glasses windows and the entrance doors. The average value of ACH50 for the houses after completion of construction work was $3.5h^{-1}$ that was similar to Europe standard ($3.0h^{-1}$). ACH50 was proportional to EqLA per floor area but inversely proportional to the internal volume, the net floor area and the area of window.

A Study on the Organization, Function and Management of Health Subcenters in Korea (우리나라 보건지소 조직, 기능 및 관리개선에 관한 연구)

  • 정영일;강성홍
    • Health Policy and Management
    • /
    • v.2 no.2
    • /
    • pp.57-89
    • /
    • 1992
  • This study is aimed both to reorient the Health net-works focused to Health Subcenters in times of development of local autonomy in Korea and to collect the fundamental data such as attitude and practice of the directors of Health Subcenter. The materials are collected from 134 out of 258 sampling directors of Health Subcenters with a questionaire by mailing(respond rate 51.9%). The major findings of this fundamental data are as follows. 1. Current average number of outpatients cared by a director of Health Subcenter is found to be 21.6. 2. The directors of Health Subcenter have little deducted hours for Public Health Programme. 3. Number of the Preventive Health Programme worked by a director of Health Subcenter is from 0 to 3. The most major group worked only 1 programme marked at 69.4%. 4. The directors of Health Subcenter express approval opinin marked at 80.2% that their qualification to appoint has to finish intern course. 5. The average diagnosis allowance a month is approximately twenty hundred thousand won. 6. Most of Health Subcenter(market at 94%) adopted a self-supporting account system. 7. The most complaining subject of directors of Health Subcenter is their working environment. The second complaining subject is governmental officier's interference. 8. The average number of outpatients cared by a director of Health Subcenter is found to be certain differentials by their marriage and the duration of employment. Some proposals of development on Health Subcenter based on the result of this research is as follows : 1. The reorganization on Health Subcenter under line of National Health Center Net-work 2. The psychological reorientation of directors of Health Sucenter and officers. 3. Autonomy management of Health Subcenter. 4. Reorientation of status on directors of Health Subcenter.

  • PDF

A Study on the End of Defects Liability Exit Procedure in Apartment Buildings through Case Studies (사례분석을 통한 공동주택 하자담보책임 종료 절차연구)

  • Kim, Jin-kuk;Bang, Hong-Soon;Choi, Byung-Ju;kim, Ok-Kyue
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.25-32
    • /
    • 2018
  • The ending of the warranty under the current Multi-Housing Management Act has a lot of problem as it is very disadvantageous to the business entity and it makes hard for the contractor to finish the repair work. It is almost none for the business entity to get the written confirmation of the expiration of warranty liability from the client even though it sincerely completed their warranty obligation. It is because the client asks for the works other than fair repair arising from the defect in the work, such as the upgrade work for the enhancement of the value of their assets and the repair work which the client should take care before it issues the written confirmation of the expiration of warranty liability to the contractor. "So, though there is the law specifying this matter, the parties are relying on the unnecessary civil agreement. This leads to the big social and economic losses. If there is no agreement made between the client and the contractor, that leads to the legal dispute. This research on cases of 10 apartments shows that the types of works which the apartment residents ask for depend on the characteristics and conditions of the apartments and that they ask for various kinds of compensational works. In addition, it was found that there were many cases in which even the civil agreement is not recognized as the ending of the warranty obligation even if the proper procedure is taken for the ending of warranty by the contractor or business entity. If the collateral is to be offered to the client, the contractor would get more hard because there is the additional cost other than the warranty obligation, thus damaging the legal objective of the laws trying to minimize the damage made to the resident of the apartments. It means that the increase in the unnecessary warranty cost would lead to the increase in the selling price of apartment and the ending of the dispute through the civil procedure would make the Multi-Housing Act ineffective.