Recently, research on the application of BIM has continuously been active not only in architecture but also in civil engineering in order to improve work efficiency across the project's planning, design, construction and maintenance phases. However, the empirical applications of BIM targeting to civil engineering scope of construction sites still lags compared to architectural sized projects. This is because BIM tools are mainly based upon vertical structures of architecture, thereby most of them have difficulties and limitations to get utilized on horizontal structures of civil engineering. Therefore, this study intends to propose automation technology of design using BIM library and to indicate its field availability through case application on a railway project representing linear infrastructure. In addition, it put forward the utilization plan of the automation technology upto 4D and 5D by continue making use of the BIM model created in the project's design stage up through the maintenance stage. The novel method of the technology proposed in this paper incorporates the automatic creation of the BIM library based on two-dimensional tunnel cross-sections and sweeping of it over three-dimensional alignment to create a BIM model of linear infrastructure. The proposed technology is anticipated to improve the efficiecny of modeling process of railway projects based on linear structures.
지하공간을 구성하고 있는 지중구조물, 지반, 암반 등 다양한 구성 요소 중에 지질공학적 측면을 포함한 모든 정보에 대한 모델 구축은 현실적으로 어려운 과정이며, 현재 진행형인 분야이다. 본 연구에서는 지질공학적인 정보모델 구축 과정이 비교적 쉬운 상용 소프트웨어를 활용하여 제주도 일부 지역 대상의 3차원 지질정보모델, 동굴형상정보모델, 도로 주변 현황 정보모델까지 한 번에 디지털화하는 과정이 포함되어 있다. 제주도에 존재하는 수많은 자연동굴 중에 도로와 교차하는 위치 중 제주도 한림 재암천굴을 대상으로 CaveBIM 기반의 디지털 트윈 구축에 관한 연구를 수행 중이다. 본 연구에서는 3D 레이저 스캐너를 사용한 동굴 형상 정보모델링, 지질 정보 및 지구물리탐사 자료를 활용한 3D 지질 모델링, 드론을 활용한 재암천굴 상부 도로 주변 현황 정보모델링 등의 개별 데이터 구축과 통합을 통해서 디지털화하는 과정을 포함하고 있다. 본 연구에서는 한림-제주 지역에 대한 전역모델(GSM) 및 재암천굴에 대한 국부모델(LSM)을 구축하였다. 또한 재암천굴에 대한 LSM 구축 시 교차검증을 수행하여 결과를 비교 및 분석하였다.
The 5th International Conference on Construction Engineering and Project Management
/
pp.1-6
/
2013
Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.
본 연구는 시공단계에 적용된 BIM이 재시공 방지에 기여한 효과를 분석하는 것을 목적으로 하였다. 기존 연구에서는 다양한 방법으로 BIM에 대한 적용효과를 제시하고 있으나 보다 현실적이고 신뢰성 있는 분석 방법론이 요구되고 있다. 이에 본 연구에서는 현장 실무자를 대상으로 BIM 효과분석에 대한 요구사항을 수집하고, 이를 반영한 BIM 효과분석 방법론을 제시하였다. 사례 연구를 통해 제시한 방법론을 기반으로 재시공 방지 효과를 분석하였다. 사례현장에서는 BIM 적용을 통해 약 370,519,593원의 재시공 방지 효과가 있는 것으로 분석되었다. 또한 현장 실무진을 대상으로 본 연구에서 제시한 방법론 및 효과분석 결과에 대한 적합성을 자문하였으며 충분한 신뢰성이 있는 결과인 것으로 확인하였다. 본 연구의 결과물은 향후 BIM 성과측정 연구에 효율적인 기초자료로 활용될 수 있을 것이다.
최근 건설공사에 이슈가 되고 있는 건축정보모델링(BIM)은 건설경기 둔화와 수주물량 감소에 따라 위기위식이 팽배한 건설산업의 새로운 돌파구로 주목받고 있다. 이미 건축분야는 국내외적으로 BIM을 도입하기 위해 관련연구가 활발히 진행되고 있다. 하지만 토목공사의 경우 건축공사와 달리 작업체계가 비반복적, 수평적, 비정형적이며, 프로젝트 수행 범위가 넓어 발생하는 정보의 양도 방대하여 건설사나 설계사에서는 BIM 구축을 위한 초기 투자비용의 부담과 투자대비 효과에 대한 의문과 부담을 갖고 있다. 이에, 국내 토목분야에 BIM을 적용하기 위해 토목설계 전문가들을 대상으로 BIM 기술수준을 파악하고 과거대비 현재 토목분야의 BIM에 대한 인식변화 분석을 통해 토목분야 BIM 활성화 저해요인을 파악하고 이를 해결할 수 있는 방안을 제시하였다. 도출된 활성화 방안은 가이드 개발, 제도 개발, 납품성과 검증, 국제표준 상정 등 4가지 분야로 구성된다. 연구결과는 토목분야 BIM 적용을 위한 표준과 납품 성과품의 검수 및 검증체계 개발 연구과제의 연구방향 설정을 위한 기초자료로 활용될 수 있을 것이다.
The interest in the Building Information Modeling (BIM) technology has risen remarkably due to the effects on construction work period reduction, cost reduction, work safety improvement, and other factors. In civil engineering field, BIM applications mainly focus on data modeling and virtual construction. In this study, we present the BIM-based virtual construction and analyze the effects of BIM for the railway facilities so that the conventional approach to the equipment operation plan can be improved in order to prevent safety accidents which can result from unclear information during the operation plan. The BIM-based virtual construction technology is applied to establish the construction plan for the site with constraints, the installation of steel girder needs to be completed, avoiding interference with the existing high-speed railway operation within a given limited time. A virtual construction model consisting of topography, structures, equipments, and avatar was built and more detailed model, including safety guard rails, was then created. Specifications of the construction equipment were input as a database, and the virtual construction model was manipulated in the equipment operation planning. Through the BIM-based virtual construction, including the verification of alternative construction method, 311 million won was saved and the construction period was shortened by 87 days compared to the original plan. In addition, it was shown that the interest and participation of the construction workers can be increased by providing the 3D virtual scene for real construction work and various safety hazards occurring during equipment operation can be effectively removed in advance by the interactive worker education.
건설 프로젝트가 대형 복잡화가 되어짐에 따라 프로젝트의 공정관리의 중요성이 대두되고 있다. 프로젝트 공정관리 기술은 한국에서 널리 사용되고 있지 않지만 점차적으로 증가하고 있는 추세다. 요즘 대부분의 연구 프로젝트들도 공정쪽에 초점을 두고 있다. 프로젝트 진척관리 또한 프로젝트 공정관리의 하나로써 매우 중요하다. 이에 본 연구에서는 국내 진척관리의 상태를 분석하기로 하며 진척관리의 현재 상태에 대해 전문가와 현장사람들에 대한 인터뷰를 진행하였다. 본 연구는 질적, 양적으로 프로젝트 진척분석을 위한 방법으로 BIM 기반의 진척관리를 제안하고 있다. 현재 BIM은 설계, 시공, 유지관리단계등에서 사용되고 있으며 또한 BIM을 이용한 진척관리는 프로젝트에 대해 이해하고 정확성을 키우는데 이바지 할 것이라고 생각된다.
The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.
건축분야에서 BIM이 널리 사용되면서, 토목구조물에 BIM을 적용하려는 노력이 최근 급속히 증가하고 있다. 그러나 기존 상용 BIM 소프트웨어의 기능은 건물 등의 건축물 중심으로 특화되어 있기 때문에 선형 중심의 토목구조물에 적용하기에 많은 어려움이 따른다. 본 연구에서는 철도 궤도부의 객체 정보를 관리하기 위하여 선형을 다룰 수 있는 소프트웨어와 BIM 소프트웨어간의 정보공유를 통해 캔트가 반영된 정보모델 생성방법을 제시하였다. 철도 궤도부 모델링은 궤도부 구조물을 연속 구조물과 비연속 구조물로 분류한 후, 연속 구조물을 선형 소프트웨어에서 생성하고, 이후 공유된 선형정보를 이용하여 비연속 구조물의 정보모델을 생성하는 절차로 이루어진다. 이 때 비연속 구조물은 BIM 소프트웨어에 전달한 이산화된 궤도 선형 및 캔트 정보를 바탕으로 비연속 구조물 각각의 위치, 회전 정보를 계산하는 알고리즘을 통하여 생성된다. 본 연구에서 제시한 방법을 오송 철도종합시험선로에 적용하여 그 실용성을 검증하였으며, 생성된 정보모델을 기반으로 명확한 객체 식별과 속성정보 추출 및 객체별 물량산출이 가능함을 확인하였다.
복합, 대형화되는 건설현장에서 사용되는 건설정보들의 양은 방대해지고 이에 따라 효율적인 건설현장 관리의 중요성이 대두되기 시작하였다. 따라서 본 연구에서는 BIM의 이론적 고찰과 국내외 사례조사를 통해서 BIM의 적용 현황 및 가능성을 파악하고 건설현장의 수행단계별, 협업주체별 중심의 분석을 통해서 효율적인 건설현장 관리모델의 구축 방향을 제시하고자 한다. BIM을 적용하여 목적 건축물의 3D Modeling을 통한 2D 도면의 시각화, 도면 오류의 사전 발췌로 시간적, 금전적 손실을 최소화, 3D 모델의 물량정보로 예산 작성의 정확성을 향상, 정확한 도면의 건축정보와 물량정보로 공사 진행 방향 설정에 확실성을 부여 및 부위별 객체 정보를 포함한 BIM기반의 건설정보를 바탕으로 공정관리를 통한 원가관리, 품질관리가 가능함을 알 수 있었다. 이 과정을 통해 BIM정보를 통합하고 연계함으로써 현장과 각 협업주체들 간의 건설현장 관리의 효율성을 향상이 가능하다고 판단된다. 추후에는 실제 건설현장 관리모델을 구축하고 실제 건설현장에 적용하여 검증을 하는 연구가 필요하다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.