• Title/Summary/Keyword: Field point measurement data

Search Result 141, Processing Time 0.029 seconds

Leakage Rates Measurement System Development of NPP Primary Containment using Wireless Data Communication Method (원전 격납건물 누설시험용 무선데이터전송을 적용한 시험장치 개발)

  • Ryu, Jae-Kyu;Sohn, Chang-Ho;Hwang, Hee-Jung;Kim, Gun-Soo;Choi, Kyong-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.916-919
    • /
    • 2003
  • In this paper, we deal with a development of measurement system to apply the leakage rates test of primary containment in nuclear power plant. The measurement test about leakage rates in primary containment is one sort of test to prove safety of nuclear power plant. The parameters which are measured to calculate leakage rates are drybulb temperature, dew point temperature(or relative humidity), absolute pressure and flow. Overall, the measurement system consists of sensor module for data acquisition of the parameters, transfer module for wireless data communication and control module to control system and to calculate leakage rates. Because existing measurement systems are difficult to set in field, we pursued convenience of use, we applied wireless data communication and individual form module using battery. We also changed for the better in confidence. Recently, we are developing a drybulb temperature and a dew point temperature sensor module. We describe about function of developed measurement system, its standard and an plan for verification of measurement system.

  • PDF

A Study on Behavior of the Earth Retaining Structure by Field Measurement and Numerical Analysis (현장계측과 수치해석에 의한 흙막이구조물의 거동 비교분석)

  • Wo, Jongtae
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.3
    • /
    • pp.286-295
    • /
    • 2017
  • In this study, it is compared various coefficients of subgrade reaction for application of numerical analysis based on measured data by using various theories and empirical formula. The ratio of the maximum and minimum value is 6.80 at the top of wall but it is 1.06 at the maximum displacement point depends on change of calculated coefficient of subgrade reaction. The data of displacement were generally similar considering an increment of a coefficient of subgrade reaction. And the results of comparison of the displacement at the maximum displacement point by numerical analysis and measured data show similar displacement shape.

Data Transmission Specific Simulation of Transmission Line using HSTL (HSTL을 이용한 전송선로에서의 데이터 전송특성 시뮬레이션)

  • Kim, Soke-Hwan;Hur, Chang-Wu
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.8
    • /
    • pp.1777-1781
    • /
    • 2011
  • Tosin backplane system design of this study (Backplane) from the HSTL (High-Speed Transceiver Logic) characteristics of the transmit and receive data using the HSPICE simulations and the actual implementation on the FPGA Data transmission characteristics were described by comparing the simulation results. Simulation and measurement criteria for point to point data transmission characteristics of wire length possible to send and receive data about the speed limits were reviewed. Measured point to point connection to send and receive signals at terminal velocity, the factors that affect the electrical noise around the wire length and showed a very important role.

A Study on Displacement Measurement Hardware of Retaining Walls based on Laser Sensor for Small and Medium-sized Urban Construction Sites

  • Kim, Jun-Sang;Kim, Jung-Yeol;Kim, Young-Suk
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1250-1251
    • /
    • 2022
  • Measuring management is an important part of preventing the collapse of retaining walls in advance by evaluating their stability with a variety of measuring instruments. The current work of measuring management requires considerable human and material resources since measurement companies need to install measuring instruments at various places on the retaining wall and visit the construction site to collect measurement data and evaluate the stability of the retaining wall. It was investigated that the applicability of the current work of measuring management is poor at small and medium-sized urban construction sites(excavation depth<10m) where measuring management is not essential. Therefore, the purpose of this study is to develop a laser sensor-based hardware to support the wall displacement measurements and their control software applicable to small and medium-sized urban construction sites. The 2D lidar sensor, which is more economical than a 3D laser scanner, is applied as element technology. Additionally, the hardware is mounted on the corner strut of the retaining wall, and it collects point cloud data of the retaining wall by rotating the 2D lidar sensor 360° through a servo motor. Point cloud data collected from the hardware can be transmitted through Wi-Fi to a displacement analysis device (notebook). The hardware control software is designed to control the 2D lidar sensor and servo motor in the displacement analysis device by remote access. The process of analyzing the displacement of a retaining wall using the developed hardware and software is as follows: the construction site manager uses the displacement analysis device to 1)collect the initial point cloud data, and after a certain period 2)comparative point cloud data is collected, and 3)the distance between the initial point and comparison point cloud data is calculated in order. As a result of performing an indoor experiment, the analyses show that a displacement of approximately 15 mm can be identified. In the future, the integrated system of the hardware designed here, and the displacement analysis software to be developed can be applied to small and medium-sized urban construction sites through several field experiments. Therefore, effective management of the displacement of the retaining wall is possible in comparison with the current measuring management work in terms of ease of installation, dismantlement, displacement measurement, and economic feasibility.

  • PDF

A Study on Non-contact Measurement of 3D-Objects by Optical Probe Method (광촉침법에 의한 비접촉 3차원 형상측정에 관한 연구)

  • Kang, Young-June;Shin, Seong-Kook;Miyoshi, Takashi
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.12 no.4
    • /
    • pp.119-126
    • /
    • 1995
  • This paper presents a non-contact measuring system using one point measuring method to measure surface profiles of dies and clay models for practical use in the field of production engineering. The system has a laser beam probe similar to a measuring probe in a contact measuring system and CCD linear sensor used to detect 300mm measurement range, displacement of measured surfaces, from an origin. There is no mechanical interference between this measuring system and a measured surface in this system. In this measuring system, it was needed 500-600ms including data processing time to measure one point. The experiments showed that the standard deviation was 800 .mu.m and the reproducibility was also 100-210 .mu. m.

  • PDF

A Study on the Environmental Improvement in the Interior Construction Fields with the check-list (실내건축의 작업환경 개선을 위한 기본적 관리방안에 관한 연구)

  • 이용의
    • Korean Institute of Interior Design Journal
    • /
    • no.9
    • /
    • pp.10-17
    • /
    • 1996
  • With the ever-increasing important of high-speed information in society as we move towards the 21 st century. Interior design and it's working condition has been changed a great deal included a sort of each special character and make a difference against the others. It used to be find a great poles asunder of worker's safety and project quality according to the environmental dimension of interior construction field as if they should be a pleasantness or poor condition. This research aimed to improvement of environmental construction field of interior with construction engineers and particular interior labors in 4 phases as : ⅠThe preparatory phase : -Secure a Budget, Environmental safety supervisor -Fix of Design quality, Construction period. -Choice of Construction method, Sub constructing Ⅱ. Starting work phase ; -Capacity , Safety of temporary power line. -Carriage, Stock of Material -Safety of Electronic tools, -Personal protector. Ⅲ. Working period ; -Ventilation, I illumination of working place. -Measurement of environmental working condition Ⅳ.Finish working phase ; -Analysis of measurement data. -Evaluation and making up for the weak point. -Keeping data.

  • PDF

Study about the Applicable Plan of GIS on Range of Magnetic Field Emitted from 60 Hz Powerline (60Hz 고압 송전선로의 자기장 발생범위에 대한 GIS 적용 방안에 대한 연구)

  • Hong, Seung Cheol;Choi, Seong Ho;Kim, Yoon Shin;Park, Jae Young
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.4
    • /
    • pp.271-277
    • /
    • 2006
  • In this study, we investigated the applicable plan of GIS on the environmental impact assessment of 60 Hz Powerline. So we assessed distance data based on calculations by use of 2D and 3D Geographical information systems(GIS) and distance data based on measurements on 1: 5000 maps accord with on site distance measurements to use input data for calculating magnetic field. One hundred eight of the on site measured addresses were selected from residences. The data were achieved by measuring the distance between residence and power line on maps with scales of 1: 5000. The digital map was obtained from National Geographic Information Institute with scales of 1: 5000, and we made 2D and 3D map. Correlation analyses were performed for statistical analyses. For the 3D GIS versus on site comparison of different exposure categories, 70 of 108 measurements were assigned to the correct category. Similarly for 2D GIS versus on site comparison, 71 of 108 were correctly categorized. When comparing map measurement with on site measurement, 62 of 108 were correctly categorized. When the correlation analysis was performed, best correlation was found between 3D GIS and on site measurements with r = 0.84947 (p<0.0001). The correlation between map and on site measurement yielded an r of 0.76517 (p<0.0001). Since the GIS measurements and map measurement were made from the center point in the building and the on site measurements had to be made from the closest wall on the building, this might introduce and additional error in urban areas. The difference between 2D and 3D calculations were resulted from the height of buildings.

Applications of Three-Dimensional Measurement System for Shape Analysis -Focused on WBS and RapidForm 2004- (입체 형상 분석을 위한 3차원 계측시스템의 활용 -WBS와 RapidForm 2004를 중심으로-)

  • Lee Myung-Hee;Jung Hee-Kyeong
    • Journal of the Korean Society of Costume
    • /
    • v.55 no.5 s.95
    • /
    • pp.55-64
    • /
    • 2005
  • The concern with three-dimensional measurement has been growing in recent years. And over the last few years, several studies have been made on three-dimensional measurement. Some of the studies using a three-dimensional measurement have focused on type of form of human body and evaluation of fitness. But there has been no study about applications of three-dimensional measurement system for shape analysis. So, the purpose of this study was to investigate about application of three-dimensional mea-surement system lot shape analysis. The instrument and tools for three-dimensional measurement was Whole Body 3D scanner(model name: Exyma-WBS2H). Analysis program used in experiment is Rapid Form 2004 PPI (INUS technology, Int, Korea). The following results were obtained; 1. The point data using three-dimensional measurement system built 3D model. 2. The three-dimensional data were used to analyze length and curvature of shape. 3. The shape using three-dimensional measurement system could be used in variety field.

Case Study of Coordinate Measurement during Construction of Long-Span Irregular Curved Roof Layers (장경간 비정형 곡면 지붕층의 시공중 좌표 계측 사례 연구)

  • Shim, Hak-Bo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.14-15
    • /
    • 2019
  • In this paper, it was tried to prove the possibility and effect of coordinate measurement by using MEP layout equipment at the construction stage, and to propose a method to improve measurement accuracy during construction. For this study, the passenger terminal site, which is a long span structure, was selected and compared with three dimensional CAD drawings and construction measurement results using MEP layout equipment for the precise construction of long-span irregular curved roof layers. As a result, it was found that it is possible to construct three-dimensional curved roof layers using MEP layout equipment through measurement and analysis.

  • PDF

An Examination of Sediment Discharge Computation Errors Related to Imprecise Factors (부정확한 인자와 관계된 유사량 산정 오류에 대한 검증)

  • 정관수
    • Water for future
    • /
    • v.29 no.3
    • /
    • pp.129-142
    • /
    • 1996
  • This study investigates the magnitude of errors that can be expected in integrating sediment concentration in a vertical, basede on a single-point measurement, because of errors in input data. Potential error sources, including sampler location, water surface elevation, bed elevation, fall velocity, $\beta$ value, and $\kappa$ value were comparatively examined using data from a special study on the Rio Grande Conveyance channel in New Mexico. It is concluded that simple forms of equations for the vertical distribution of velocity and sediment concentration based on a single-point field sample of suspended sediment. The most uncertain point in the computation is related to the Rouse number z in the equation for the vertical concentration distribution of suspended sediment.

  • PDF