Since the reliability of results by the existing analyzing method is low, in the case of for excavation performed in urban area whose stability is of great importance, construction control based on field monitoring is always necessary. But the field monitoring reflects only the behavior of construction process that has already been carried out, and it has limitations in predicting the behavior of the expected construction process, which is practically more important for construction control. In this study, construction control system for excavation which can predict the behavior of the expected processes during construction with high degree of accuracy, is developed by adopting inverse analysis. The inverse analied applied field monitoring results to excavation analysis can improve the reliability of predicted results. The developed system uses an elasto-plastic soil spring model for the excavation analysis and the minimization of least squared errors between measured displacements and calculated displacements for the inverse analysis. All the required processes for construction control can be performed as an integrated work within the system reflecting real time application and user's convenience. Their applicabilitis are confirmed by two case studies.
Journal of The Korean Society of Agricultural Engineers
/
v.55
no.6
/
pp.155-165
/
2013
Recently, geotextile tube method can be widely applied to the river, costal and marine in the construction field, such as embankment, groin, breakwater, dyke structures and so on, in advanced countries of the world. And that has been constructed at the temporary road for incheon, ilsan-bridge construction and coast erosion protection in republic of korea. Geotextile tube is a tube shaped geotextile product and hydraulic pumping filled with dredged soils. In this paper, the numerical analysis was performed to investigate the behavior of geotextile tube with various properties of material character, shape condition, construction pressure and so on. Also, the field test was conducted in order to identify the construction ability of Samangum waterproof embankment using geotextile tube. According to the applied of field test, geotextile tube was 65 m long and 4.0 m diameter. Also, the permeability coefficient and ultimate tensile strength of geotextile tube is $1.6{\times}10^{-1}$ cm/sec and 205.26 kN/m, respectively. As a result of filed test, when filled, geotextile tube does not attain the same as its unfilled theoretical diameter, but may reach approximately of 55 percent of the theoretical diameter. At the time, geotextile tubes were 12.56 m in circumference and filled to a height of about 2.2 m. This paper presents case study on field application and behavior analysis of the saemangum waterproof embankment donggin 1 division construction using geotextile tube.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.2
/
pp.1089-1095
/
2014
In this study, we compared and analyzed the displacement of final excavation with measured value through an inverse analysis method used in urban excavation construction. We maximized the effectiveness of the inverse analysis method, and plan to achieve cost-effective and practical construction management in the field with identical conditions. As the first stage, we suggest an example of a field which has the inverse analysis method. We applied the inverse analysis method to three different fields on which construction and measuring were finished. Of these three fields, two fields showed a very satisfactory result. However, in one field, there were significant differences between the analysis and measured value. The result of our analysis indicated that, we should unite the conditions of the inverse analysis method and field construction. We need to thoughtfully reconsider the RANKINE earth pressure application in a triangle type. This is because the uniformity of earth pressure is made by its arching effect, in the condition of the displacement of lower underground occurring widely, which is differentiated with the earth pressure conditions of RANKINE, even if the slurry wall has stiffness. Also, when recalculating the soil parameter, we should emphasize the adhesion of the weathering zone, and give experimental consideration to ground water level.
Objective: The aim of this study is to reclassify human errors and to develop hands-on tools to apply the new classification for preventing human error accidents in highway construction site. Background: The main cause of accidents in highway construction was reported as the carelessness of workers. However, such diagnosis could not help us operationally prevent accidents in real workplace. Method: The accidents in highway construction were reanalyzed and the causes of human error were reclassified in order to educate and improve the awareness of human error in highway construction. Field survey and interview with safety managers and workers were conducted to find the causal relationship between the actual accidents and the human errors. Results: The most frequently observed human errors in highway construction were classified into six categories such as mis-perception, distraction, memory fail, slip, cognition error and mis-judgment. In order to provide hands-on tools to increase the awareness of human error in construction field, the human error checklist and card sorting diary were developed. Especially, the card sorting diary was designed to increase the ability in human error inspection of safety manager at construction site. Moreover, posters were developed based on actual accident cases. Conclusion: We suggested that the improved awareness and analytical report on checklist, card sorting diary and posters for construction field could collectively prevent the accident. Application: The classification of human error, hands-on tools and posters can be directly applicable on highway construction site. This analytical and collective approach preventing human error-related accident could be extended to other construction workplaces.
Journal of the Korea Institute of Construction Safety
/
v.4
no.1
/
pp.9-15
/
2021
Recently, buildings have become larger, more complex, and various construction methods have been tried. As a result, the use of construction equipment continues to increase, as well as safety accidents. According to the Ministry of Employment and Labor's report on industrial accidents, the rate of deaths caused by construction equipment among construction accidents has been increasing steadily since 2009. In the safety field of other industries such as crime and traffic, research has been continuously conducted to develop quantitative indicators due to demands for development of evaluation indicators or risk index development. On the other hand, construction equipment has been studied to analyze disaster cases and come up with improvement measures, but there is no research related to risk index. Therefore, the research will develop a quantitative index that can determine the risk level of construction equipment in the field based on the accident case and verify the possibility of use in the field.
Journal of the Korea Institute of Construction Safety
/
v.4
no.1
/
pp.16-21
/
2021
Recently, as part of an effort to reduce the high accident rate in the construction industry, the smart construction safety technology is being introduced, and some institutional improvements are being made simultaneously. This study has been carried out to identify the effectiveness of such an improved institution and to draw additional opinions for improvement to spread the field application of smart safety technology. A survey was conducted for participants in the construction industry, and awareness of the improved institution and additional requirements for spreading smart safety technology in the construction site were investigated. As a result of the investigation, high interest in the field application of smart construction safety technology has been confirmed, and some issues such as safety management costs and duplication of on-site safety paperwork have been raised. The opinions derived through this study will be used as baseline data for future institutional improvements for the introduction and diffusion of smart construction safety technology in the construction site.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.70-71
/
2016
Recently, the climate change due to global warming, heat wave, heavy snow etc., is rapidly progressing all over the world. This kind of climate change is judged to be affecting a lot in construction industry which has characteristic of outdoor industry. Therefore this study, to prevent death disaster occurring by climate elements at construction site, quantitatively analyzed real condition of death disaster on construction site and suggests basic management direction which to be conducted on the site.
International conference on construction engineering and project management
/
2007.03a
/
pp.318-326
/
2007
This research aims to investigate into Official Development Assistance (ODA), which may be regarded as assistance or aid to increase competitiveness in the overseas construction field through presenting, in the initial step of construction projects, schemes to secure financial resources to those who place orders. In this research, the present author analyzes ODA of advanced countries and S.Korea and distributes and collects questionnaires to experts in related fields in order to investigate into the current state and problems of overseas construction and ODA.
Chern, Wei-Chih;Kim, Hongjo;Asari, Vijayan;Nguyen, Tam
International conference on construction engineering and project management
/
2022.06a
/
pp.808-813
/
2022
This study presents the problems of data imbalance, varying difficulties across target objects, and small objects in construction object segmentation for far-field monitoring and utilize compound loss functions to address it. Construction site scenes of assembling scaffolds were analyzed to test the effectiveness of compound loss functions for five construction object classes---workers, hardhats, harnesses, straps, hooks. The challenging problem was mitigated by employing a focal and Jaccard loss terms in the original loss function of LinkNet segmentation model. The findings indicates the importance of the loss function design for model performance on construction site scenes for far-field monitoring.
Proceedings of the Korean Geotechical Society Conference
/
2000.11a
/
pp.117-124
/
2000
As the reinforced earth wall is constructed with step by step backfill compaction method, the accumulative horizontal deformation is inevitable. It has been reported that about 80% of horizontal deformation is occurred during the construction stage of reinforced earth retaining wall. To reduce the horizontal deformation, an isolated-reinforced earth wall method(KOESWall system) was newly developed. In this system, the reinforced earth is constructed first with reinforcements and backfills only, and then facing blocks are installed after the horizontal displacement of reinforced earth is fully occurred. To evaluate the effect of a construction method and the performance of KOESWall system, two cases of full scale field performance was monitored during and after the construction stages.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.