• Title/Summary/Keyword: Field Schedule Management

Search Result 109, Processing Time 0.088 seconds

Introducing TPMS on applying Lean Construction (린(Lean) 건설 개념을 도입한 TPMS 시스템에 대한 소개)

  • Park, Chan-Jung;Jung, Hee-Won;Kim, Sang-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.150-153
    • /
    • 2006
  • GS E&C had developed the construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on material, labor, equipment focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

Design of Checklist for Improvement of Reliability of Uncertainty and Variability Environment (불확실성 및 가변성 환경의 신뢰성 향상을 위한 체크리스트 설계)

  • Lee, Eun-Ser
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.10
    • /
    • pp.389-396
    • /
    • 2014
  • There are many defects when we're working on a project. Especially, if we don't have experience in similar field, defects have a strong influence on the system entirely. Therefore, management of risk such like defects is important the factor for success of project. Finally, efficient management of risk can guarantee handling problems such like fault tolerancy, unexpected quality and delay of schedule. In this paper, we propose checkpoint for improvement of reliability and are willing to improve the reliability of an entire system using it.

Developing User Interfaces of Mobile PMIS Modules Based on Technology Demand Analysis (국내·외 사용자 기술수요 분석에 따른 모바일 PMIS UI개발)

  • Park, Kyung-Mo;Lee, Hyun Woo;Kim, Chang-Duk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.3
    • /
    • pp.244-251
    • /
    • 2014
  • Project Management Information System (PMIS) has not yet fully met needs of the construction industry. Based on the deficiency of the current system, the present study performed a survey to identify a need for mobile PMIS in the industry. The survey revealed that most respondents expect the development of mobile PMIS would contribute to improving the productivity and efficiency of field operations. Based on the survey findings, this study proposes a suite of modules for mobile PMIS, which are focused on construction management, document management, schedule management, and field information management. Mobile PMIS would allow to access from the field through mobile devices by using tablet computers and smart-phones. The study also suggests that the effectiveness of the system can be enhanced by user interfaces that are customized for each module.

A Study on Application of Lean Construction Theory in Schedule Management (린 건설 공정관리이론의 현장적용에 관한 연구)

  • Jung, Joo-Young;Kwon, Won;Park, Sang-Jun;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.515-518
    • /
    • 2006
  • Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.

  • PDF

A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF

A Study on the Actual Condition and Development of BCWS Management In Large Apartment Complex Project (대단지 아파트 건설공사의 계획기성 관리실태에 관한 연구)

  • Kim Sang-Hee;Yang Yong-Cheol;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.434-437
    • /
    • 2003
  • In apartment project, BCWS is a critical management factor and has a great influence on the success of the project. But due to the characteristics of large apartment complex, there are several problems in making out a time schedule of work as well as production and management of precise bcws from the allocation of resources. In this study, Actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of bcsw through the analysis of the problems and the origins relating to BCWS from a field area.

  • PDF

Autonomous Knowledge Acquisition Methodology using Knowledge Workers' Context Information : Focused on the Acquisition of Dialogue-Based Knowledge for the Next Generation Knowledge Management Systems (지식근로자의 상황정보를 이용한 자율적 지식획득 방법론 : 대화형 지식의 획득을 위한 차세대형 지식경영시스템)

  • Yoo, Keedong
    • Knowledge Management Research
    • /
    • v.9 no.4
    • /
    • pp.65-75
    • /
    • 2008
  • Knowledge workers' workload to register knowledge can cause quality defects in the quality as well as the quantity of knowledge that must be accumulated in a knowledge management system(KMS). To enhance the availability of a KMS by acquiring more quality-guaranteed knowledge, autonomous knowledge acquisition which outdoes the automated acquisition must be initiated. Adopting the capabilities of context-awareness and inference in the field of context-aware computing, this paper intends to autonomously identify and acquire knowledge from knowledge workers' daily lives. Based on knowledge workers' context information, such as location, identification, schedule, etc, a methodology to monitor, sense, and gather knowledge that resides in their ordinary discussions is proposed. Also, a prototype systems of the context-based knowledge acquisition system(CKAS), which autonomously dictates, analyzes, and stores dialogue-based knowledge is introduced to prove the validity of the proposed concepts. This paper's methodology and prototype system can support relieving knowledge workers' burden to manually register knowledge, and hence provide a way to accomplish the goal of knowledge management, efficient and effective management of qualified knowledge.

  • PDF

An Exploratory Development of Mathematical Programming Model for the Railway Conflict Resolution Problem on a Single Line Track (단선구간 열차경합해소 문제를 위한 수리계획 모형의 기본설계)

  • Oh Seog-Moon;Hong Soon-Heum;Kim Jae-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.314-320
    • /
    • 2005
  • This paper is designed to help train dispatcher resolve railway conflicts in rent-time. We developed a mixed integer programming model to optimize the train schedule that determines the best overtaking or crossing positions, The objective of the model is to minimize the maximum lateness of the trains and reduce the total sum of the lateness, while satisfying the field constraints associated with the difference between passenger trains and freight trains, and the limited number of sidings. We applied the model on a portion of a single line track, Joong-Ang Line to ascertain the efficiency of the model, and showed how the model can be used to resolve the railway conflicts. The results indicates that our model can provide useful results in terms of optimal schedule for the test problem. This type of modeling approach would be useful for a train dispatcher to make a real-time railway conflict resolution.

A Survey on Predicting Workloads and Optimising QoS in the Cloud Computing

  • Omar F. Aloufi;Karim Djemame;Faisal Saeed;Fahad Ghabban
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.2
    • /
    • pp.59-66
    • /
    • 2024
  • This paper presents the concept and characteristics of cloud computing, and it addresses how cloud computing delivers quality of service (QoS) to the end-user. Next, it discusses how to schedule one's workload in the infrastructure using technologies that have recently emerged such as Machine Learning (ML). That is followed by an overview of how ML can be used for resource management. This paper then looks at the primary goal of this project, which is to outline the benefits of using ML to schedule upcoming demands to achieve QoS and conserve energy. In this survey, we reviewed the research related to ML methods for predicting workloads in cloud computing. It also provides information on the approaches to elasticity, while another section discusses the methods of prediction used in previous studies and those that used in this field. The paper concludes with a summary of the literature on predicting workloads and optimising QoS in the cloud computing.