• Title/Summary/Keyword: Field Schedule Management

Search Result 109, Processing Time 0.026 seconds

Suggestion improvement measures based on form work productivity analysis in apartment housing construction (공동주택 거푸집공사 작업량 분석에 따른 개선 방안에 대한 연구)

  • Yoon, Ja-Young;Kim, Young-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.

A Study on Analyzing and Developing the Syllabus for Library and Information Science Core Courses (국내 문헌정보학 주요 교과목 강의계획서 분석 및 개발 연구)

  • Noh, Younghe;Ahn, In-Ja;Choi, Sang-Ki
    • Journal of Korean Library and Information Science Society
    • /
    • v.44 no.1
    • /
    • pp.143-175
    • /
    • 2013
  • This study purposed to develop and propose the curriculum content of te LIS core courses for raising professional librarians in the information society. To this end, we investigated and analyzed syllabi of LIS core courses which opened in 39 Department of Library & Information Science in Korea, and also analyzed the job analysis data which is developed by library types. As a result, syllabi of the core course for Introduction to Library and Information Science, Information Organization, Information Services, Library Management, Information Retrieval, and Library Field Studies has been developed. The syllabi included teaching methods, evaluation methods, the main textbook, and 15-week or 16-week lecture schedule and content and so on.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

A Study on the Repair Time of the Construction Type in the Apartment Housings (공동주택 공종별 수선시기 설정 연구)

  • Lee, Kang-Hee;Park, Geun-Soo;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.22 no.4
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

Management to Prepare Fast Green Suitable for International Golf Tournament in Korea - A Case Study of the Lakeside Country Club - (한국에서 국제 골프 토너먼트 규격에 맞는 빠른 그린 관리 방법 - 레이크사이드 컨트리 클럽을 사례로 -)

  • 장유비;김진관;박장혁;심경구
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.1
    • /
    • pp.66-77
    • /
    • 2003
  • The purpose of this study is to propose a standard putting green management program to prepare fast green suitable for international golf tournaments, and to conform whether the reported green speed model can be applied to the real field situations. The west course of Lakeside Country Club was selected for the case study. This study was initiated on August 1st, 2001 and continued through October 4th, 2001. The results are summarized as follows: 1. Following the long-term schedule, 'penncross' creeping bentgrass turf was mowed at 5.0mm(37days), 4.5mm(8days), 4.0mm(4days), 3.5mm(2days), 3.2mm(2days), 3.0mm(2days), 2.8mm(2days) and the mowing direction was changed daily. Variation of mowing height was reduced to a minimum range. Core aerification with deep tines was applied 19 days prior to the first practice round. Dry sand maintenance was top-dressed 2 times at 1.5mm/$m^2$ on the 17th day and 1.0mm/$m^2$ on the 10th day. Minimum irrigation was applied to keep the turf alive. During the tournament preparation week, dew on the putting greens was removed by using a sponge roller. Following the dew removal, the greens were cut once each morning at a height of 2.8mm. The mower used was the 21 inch working behind mower equipped with a tournament bedknife and 11 reel blades. Following the mowing, the peens were rolled with a light-weight roller in one direction in the morning. Rolling was used as a finishing technique to ensure that the surface was as smooth as possible, and to provide true ball roll and maximum green speed. In conclusion these management practices satisfied the daily green stimpmeter readings required for USGA championship play. 2. During the period of tournament preparation, no damage was observed on the green, but scalping in green edge appeared in about 0.39% of the total area of 18 greens in the west course.

An Inspection/Maintenance Job Scheduling Management Method by Using Location Information based on Wi-Fi AP Connection History (Wi-Fi AP 접속 기록 기반 위치 정보를 이용한 점검/유지보수 작업 스케줄 관리 방법)

  • Gu, Bongen
    • Journal of Platform Technology
    • /
    • v.9 no.4
    • /
    • pp.51-59
    • /
    • 2021
  • In this paper, we propose a location-based service that the user's location is known by connection history to WI-FI AP installed in a facility known its location previously. The location-based service proposed in this paper manages job processing states of technicians who inspect and maintain the facility like elevator by using worker's location and arrival time information. The job scheduling management method proposed in this paper is based on previously scheduled arrival time and actual arrival time to a target facility. And we experimentally implemented the inspection and maintenance system of an elevator to show the feasibility of job schedule management based on location and arrival time information acquired from Wi-Fi AP connection history. Our experimental implementation shows that our proposed method is usefulness in the field of the inspection and maintenance of a facility.

An Inspection/Maintenance Job Scheduling Management Method by Using Location Information based on Wi-Fi AP Connection History (Wi-Fi AP 접속 기록 기반 위치 정보를 이용한 점검/유지보수 작업 스케줄 관리 방법)

  • Gu, Bongen
    • Journal of Platform Technology
    • /
    • v.10 no.1
    • /
    • pp.11-19
    • /
    • 2022
  • In this paper, we propose a location-based service that the user's location is known by connection history to WI-FI AP installed in a facility known its location previously. The location-based service proposed in this paper manages job processing states of technicians who inspect and maintain the facility like elevator by using worker's location and arrival time information. The job scheduling management method proposed in this paper is based on previously scheduled arrival time and actual arrival time to a target facility. And we experimentally implemented the inspection and maintenance system of an elevator to show the feasibility of job schedule management based on location and arrival time information acquired from Wi-Fi AP connection history. Our experimental implementation shows that our proposed method is usefulness in the field of the inspection and maintenance of a facility.

The Study on the Implementation Approach of MLOps on Federated Learning System (연합학습시스템에서의 MLOps 구현 방안 연구)

  • Hong, Seung-hoo;Lee, KangYoon
    • Journal of Internet Computing and Services
    • /
    • v.23 no.3
    • /
    • pp.97-110
    • /
    • 2022
  • Federated learning is a learning method capable of performing model learning without transmitting learning data. The IoT or healthcare field is sensitive to information leakage as it deals with users' personal information, so a lot of attention should be paid to system design, but when using federated-learning, data does not move from devices where data is collected. Accordingly, many federated-learning implementations have been developed, but detailed research on system design for the development and operation of systems using federated learning is insufficient. This study shows that measures for the life cycle, code version management, model serving, and device monitoring of federated learning are needed to be applied to actual projects and distributed to IoT devices, and we propose a design for a development environment that complements these points. The system proposed in this paper considered uninterrupted model-serving and includes source code and model version management, device state monitoring, and server-client learning schedule management.

Validation of an Anthracnose Forecaster to Schedule Fungicide Spraying for Pepper

  • Ahn, Mun-Il;Kang, Wee-Soo;Park, Eun-Woo;Yun, Sung-Chul
    • The Plant Pathology Journal
    • /
    • v.24 no.1
    • /
    • pp.46-51
    • /
    • 2008
  • With the goal of achieving better integrated pest management for hot pepper, a disease-forecasting system was compared to a conventional disease-control method. Experimental field plots were established at Asan, Chungnam, in 2005 to 2006, and hourly temperature and leaf wetness were measured and used as model inputs. One treatment group received applications of a protective fungicide, dithianon, every 7 days, whereas another received a curative fungicide, dimethomorph, when the model-determined infection risk (IR) exceeded a value of 3. In the unsprayed plot, fruits showed 18.9% (2005) and 14.0% (2006) anthracnose infection. Fruits sprayed with dithianon at 7-day intervals had 4.7% (2005) and 15.4% (2006) infection. The receiving model-advised sprays of dimethomorph had 9.4% (2005) and 10.9% (2006) anthracnose infection. Differences in the anthracnose levels between the conventional and model-advised treatments were not statistically significant. The efficacy of 10 (2005) and 8 (2006) applications of calendar-based sprays was same as that of three (2005 and 2006) sprays based on the disease-forecast system. In addition, we found much higher the IRs with the leaf wetness sensor from the field plots comparing without leaf wetness sensor from the weather station at Asan within 10km away. Since the wetness-periods were critical to forecast anthracnose in the model, the measurement of wetness-period in commercial fields must be refined to improve the anthracnose-forecast model.

Current Trends in Diagnosis and Management of Laryngopharyngeal Reflux Disease; A Survey of Korean Otolaryngologists (인후두역류질환의 진단 및 치료 경향; 이비인후과 전문의 설문조사 결과)

  • Lee, Jae-Kwon;Kim, Tae-Wook;Son, Young-Ik
    • Journal of the Korean Society of Laryngology, Phoniatrics and Logopedics
    • /
    • v.20 no.2
    • /
    • pp.141-147
    • /
    • 2009
  • Background and Objectives: Although laryngopharyngeal reflux disease (LPRD) is a widely recognized disease in the field of otolaryngology, controversies still exist regarding the diagnosis and treatment for it. The purpose of this survey was to find out current trends in diagnosis and management of LPRD among Korean otolaryngologists. Materials and Method: Questionnaires were obtained from 26 Korean otolaryngology specialists by electronic balloting, and 46 members of the Korean Society of Head and Neck Surgery (KSHNS) bye-mail. Survey participants were asked about their preferences in diagnostic policy, duration/dosage of antireflux treatment, and their familiarity to the reflux symptom index (RST) and the reflux finding scores (RFS). Results: The majority of the survey participants (64%) preferred empiric therapy trial with proton pump inhibitors (PPIs) based on patients' symptoms and their laryngeal findings. PPIs alone (27%) or PPIs with prokinetics (32%) were usually prescribed as a first line treatment mostly with once daily schedule in the morning before meal and for less than 4 months of duration (86%). More than 90% of participants were aware of the RSI and RFS, but less than 50% of them were actually using those items in the clinics. Conclusion: Most of Korean otolaryngologists who participated in this survey answered that they prefer starting empirical treatments with proton pump inhibitors mainly based on the patient's symptoms and their laryngeal findings.

  • PDF