• Title/Summary/Keyword: Field Construction

Search Result 5,546, Processing Time 0.043 seconds

Field Application Assessment of Alkali-Activated Slag-Red Mud Soil Mixed Pavement (알칼리활성화 슬래그-레드머드 흙포장재의 현장 적용평가)

  • Kang, Hye Ju;Hwang, Byuong Il;Kim, Jae Hwan;Kang, Suk Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.107-108
    • /
    • 2017
  • In this search, by evaluating the field applicability of soil mixed pavement of Red mud is mixed into the soil mixed pavement field applicability, and tries to present the basic data about the site application of recycling of red mud and low carbon construction material to. As a result, the conventional soil concrete organization standards (SPS-KSCICO-001: 2003) meets the criteria for parking lot, making use of red mud, natural color as well as the natural loess is expressed.

  • PDF

A ROBUST AND ACCURATE PHASE-FIELD SIMULATION OF SNOW CRYSTAL GROWTH

  • Li, Yibao;Lee, Dong-Sun;Lee, Hyun-Geun;Jeong, Da-Rae;Lee, Chae-Young;Yang, Dong-Gyu;Kim, Jun-Seok
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • v.16 no.1
    • /
    • pp.15-29
    • /
    • 2012
  • In this paper we introduce 6-fold symmetry crystal growth using new phase-field models based on the modified Allen-Cahn equation. The proposed method is a hybrid method which uses both analytic and numerical solutions. We then show this method can be extended to $k$-fold case. The Wulff construction procedure is provided to understand and predict the shape of crystals. We also present a detailed mathematical proof of the validity of the Wulff construction. For computational results, we verify the accuracy and efficiency of the method for snow crystal growth.

The Construction of the Database System In the Field of Medical Instrument (의료기기 분야 정보화관리시스템 구축)

  • Lee, Seung-Cheol;Kim, Ji-Woon;Kim, Se-Hun;Kim, Yoon-Su;Park, Sang-Hui
    • Proceedings of the KIEE Conference
    • /
    • 1998.07g
    • /
    • pp.2451-2453
    • /
    • 1998
  • With the recent trend to get more into the information age we suppose that the need of information for medical industry policy establishment and new product development of medical instrument will increase rapidly. The object of this research & development is the construction of a database system with information resources in the field of medical instrument for an efficient application of domestic and abroad information in the field of medical instrument and building the foundation for the construction of an unified information management system. In this research we finished the analysis of the collected material of informations for medical instrument industry, design of the database system with object-oriented modelling is done. and we developed pre-product level information management system running on WINDOWS.

  • PDF

QUANTUM CODES WITH IMPROVED MINIMUM DISTANCE

  • Kolotoglu, Emre;Sari, Mustafa
    • Bulletin of the Korean Mathematical Society
    • /
    • v.56 no.3
    • /
    • pp.609-619
    • /
    • 2019
  • The methods for constructing quantum codes is not always sufficient by itself. Also, the constructed quantum codes as in the classical coding theory have to enjoy a quality of its parameters that play a very important role in recovering data efficiently. In a very recent study quantum construction and examples of quantum codes over a finite field of order q are presented by La Garcia in [14]. Being inspired by La Garcia's the paper, here we extend the results over a finite field with $q^2$ elements by studying necessary and sufficient conditions for constructions quantum codes over this field. We determine a criteria for the existence of $q^2$-cyclotomic cosets containing at least three elements and present a construction method for quantum maximum-distance separable (MDS) codes. Moreover, we derive a way to construct quantum codes and show that this construction method leads to quantum codes with better parameters than the ones in [14].

A Study on Improvement of the Quality Management for Fire Doors (방화문의 현장품질관리 개선방안에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.93-94
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. In order to improve the on-site quality management of the fire door, we comprehensively classify the quality management items of the fire door according to the management subject and the step by stage and set the field quality management procedure, the field quality management inspection item, regulations and standardized checklists were presented.

  • PDF

A Research on Development Measures of Information Services for Construction Technology (건설기술 정보서비스 구축 방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.8
    • /
    • pp.5707-5715
    • /
    • 2015
  • Recently, construction industry has won an increasing number of orders for overseas construction projects, thereby achieving an external growth, but its competiveness is concentrated on the construction execution field. In particular, the plant field occupies most of the entire orders, which are concentrated regionally in the Middle East and Asia. In addition, low-cost orders are frequently caused by excessive competition. But its high value-added construction engineering(Below, CE) field's overseas market share and technological capacity are very low. Also, technological competiveness, in terms of order amount and other factors, is deepening in polarization between large CE companies and small and medium-sized CE firms. It is noted that the existing CE information systems mostly simply accumulate data such as design and specification standards and provide the information thereon to users, and thus have yet to provide the information essential for the CE and support such efforts. This study sought to prepare a system designed for sharing outstanding design documents information necessary for the CE industry, by category of construction so as to support the technological enhancement of the CE field. Toward that end, this study presented measures for constructing the system and services designed to exchange and share the outstanding design documents information and know-how by construction category necessary between ordering agencies and CE companies.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

Trajectory Control of Field Robot Using Adaptive Control and System Identification (적응제어 및 시스템 규명을 이용한 Field Robot의 궤적 제어)

  • Kim, Seung-Su;Seo, U-Seok;Yang, Sun-Yong;Lee, Byeong-Ryong;An, Gyeong-Gwan
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.8 no.9
    • /
    • pp.728-735
    • /
    • 2002
  • The Field robot means the machinery applied for outdoor tasks in construction, agriculture and undersea etc. In this study, to field-robotize a hydraulic excavator that is mostly used in construction working, we have developed an automatic excavation system and an adaptive control system. A model-reference adaptive controller has been designed based on the model that is obtained through off-line system identification. It is illustrated by computer simulations that the proposed control system gives good performance in the trajectory tracking control and the adaptation to parameter variation.

Trajectory Tracking Control of Field Robot using Adaptive Control and System Identification (적응제어 및 시스템 규명을 이용한 Field Robot의 궤적 추종 제어)

  • 서우석;김승수;양순용;이병룡;안경관
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2002.04a
    • /
    • pp.469-474
    • /
    • 2002
  • The Field Robot means the machinery applied for outdoor tasks in construction, agriculture and undersea etc. In this study, to field-robotize a hydraulic excavator that is mostly used in construction working, we have developed an automatic excavation system and adaptive control system. A model- reference adaptive controller has been designed on the model that is obtained through off-line System Identification. It is illustrated by computer simulations that the proposed control system gives good performances in the trajectory tracking control and adaptation to parameter variation.

  • PDF

The Study on Development and Applicability of Shotcrete Shotting Test Machine (숏크리트 타설시험기 개발 및 적용성 검토)

  • Kang, Eun-Gu;Ma, Sang-Joon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1333-1342
    • /
    • 2010
  • It required excessive cost and effort to evaluate the quality of shotcrete mix for field test. Also, due to a myriad of field variables, it is difficult to get a standardized result for field test. And it is impossible to simulate the shotting process for indoor test. In this study, in order to overcome these problems, we developed a standardized Shotcrete Shotting Test Machine. Using this machine we performed shotcrete quality test and estimated the applicability of developed Shotcrete Shotting Test Machine by comparing with the results of field test.

  • PDF