• 제목/요약/키워드: Feeder

검색결과 925건 처리시간 0.029초

간선 및 분기선의 개폐기 설치 효과 분석(I) (Reliability analysis of the switch installation in the main feeder and in the radial/loop lateral feeders in distribution system)

  • 조남훈;오재형;이흥호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.79-82
    • /
    • 2002
  • The addition of switches to a distribution feeder does, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder. To cover its service area so that feeder-level delivery reaches sufficiently close to all customers, feeders typically split their routes many times, in what is often called a lateral feeder. It is interesting to note, however, that the effectiveness of a switch is very much dependent on the types of lateral feeder. The types of lateral are classified into two types. The first is loop lateral feeder that can connect its load to an adjacent feeder through a tie line in case that a fault occurs in its feeder and it is laid out so that every feeder has complete fault backup through re-switching of its loads to other sources like a main feeder. The second is the radial lateral feeder cannot connect its load to an adjacent line, no provision is made for contingency backup of feeders. There are no other circuits in the radial lateral feeder form which to restore power. In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

  • PDF

마이크로그리드에서 하이브리드 시스템의 Feeder Flow Mode 운영을 위한 제어 알고리즘 (Control Algorithm of Hybrid System for Feeder Flow Mode Operation in Microgrid)

  • 문대성;서재진;김윤성;원동준
    • 전기학회논문지
    • /
    • 제60권1호
    • /
    • pp.1-7
    • /
    • 2011
  • Active power control scheme for distributed generation in microgrid consists of feeder flow control and unit power control. Feeder flow control is more useful than the unit power control for demand-side management, because microgrid can be treated as a dispatchable load at the point of common coupling(PCC). This paper presents detailed descriptions of the feeder flow control scheme for the hybrid system in microgrid. It is divided into three parts, namely, the setting of feeder flow reference range for stable hybrid system operation, feeder flow control algorithm depending on load change in microgrid and hysteresis control. Simulation results using the PSCAD/EMTDC are presented to validate the inverter control method for a feeder flow control mode. As a result, the feeder flow control algorithm for the hybrid system in microgrid is efficient for supplying continuously active power to customers without interruption.

슬라이드 방식을 이용한 스크류/볼트 피더기 개발 (Development of A Feeding Device for Screw/Bolt Using the Sliding Method)

  • 김용석;정찬세;양순용
    • 한국생산제조학회지
    • /
    • 제20권4호
    • /
    • pp.502-508
    • /
    • 2011
  • In this paper, we proposed vertical feeding mechanism for a slide parts feeder using the slide type method. This parts feeder of the slide type method have been proposed to suppress the dust generation from the feeding objects. The proposed parts feeder mechanism is composed with the casing hopper, the vertical feeding unit, the in-line feeder and linear shooter unit. And, these mechanisms did modularity through optimum design by means of mechanical and dynamical analysis using the RecurDyn(multi-body dynamics) analysis module. Also were carried out the virtual prototype using the 3-D CAD program. And it had been manufactured as the prototype of the slide parts feeder. The field test for validation of performance was performed directly at the inspection line of bolt and screw. In the field test, this slide parts feeder showed an efficiency of about 1.2 times the bowl feeder. It also showed an epoch reduction in the dust generation compared to the vibration bowl feeder. So this slide parts feeder will be applied useful in the vision inspection system for a screw and bolt.

능동 데이터베이스 이용한 배전선로 운전자동화 (An feeder Automation System Using Active Database)

  • 최상열
    • 조명전기설비학회논문지
    • /
    • 제17권5호
    • /
    • pp.94-102
    • /
    • 2003
  • 본 연구에서는 능동 데이터베이스를 이용하여 배전선로의 운전을 자동화하는 방안을 제시하였다. 기존의 선로운 전자동화 시스템에서는 수동형 데이터베이스를 사용으로 인위에 의한 실수로 광역정전 또는 과부하 구간의 파급등이 발생될 우려가 있었다. 그러나 제시된 능동 데이터베이스는 선로운전 자동화 시스템 데이터베이스의 상태를 항상 감시하고 스위치의 상태나 계통의 전류 또는 부하량이 변경되었을 경우 그에 상응하는 일련의 작업을 사용자의 개입없이 능동 규칙이용하여 데이터베이스 스스로 수행하도록 함으로써 인위에의한 실수를 최소화 할 수 있다. 제시된 방식을 실 계통인 서울의 K지점의 모의 배전계통에 적용하여 그 유용성을 입증하였다.

A REVIEW OF CANDU FEEDER WALL THINNING

  • Chung, Han-Sub
    • Nuclear Engineering and Technology
    • /
    • 제42권5호
    • /
    • pp.568-575
    • /
    • 2010
  • Flow Accelerated Corrosion is an active degradation mechanism of CANDU feeder. The tight bend downstream to Gray loc weld connection, close to reactor face, suffers significant wall thinning by FAC. Extensive in-service inspection of feeder wall thinning is very difficult because of the intense radiation field, complex geometry, and space restrictions. Development of a knowledge-based inspection program is important in order to guarantee that adequate wall thickness is maintained throughout the whole life of feeder. Research results and plant experiences are reviewed, and the plant inspection databases from Wolsong Units One to Four are analyzed in order to support developing such a knowledge-based inspection program. The initial thickness before wall thinning is highly non-uniform because of bending during manufacturing stage, and the thinning rate is non-uniform because of the mass transfer coefficient distributed non-uniformly depending on local hydraulics. It is obvious that the knowledge-based feeder inspection program should focus on both fastest thinning locations and thinnest locations. The feeder wall thinning rate is found to be correlated proportionately with QV of each channel. A statistical model is proposed to assess the remaining life of each feeder using the QV correlation and the measured thicknesses. W-1 feeder suffered significant thinning so that the shortest remaining life barely exceeded one year at the end of operation before replacement. W-2 feeder showed far slower thinning than W-1 feeder despite the faster coolant flow. It is believed that slower thinning in W-2 is because of higher chromium content in the carbon steel feeder material. The average Cr content of W-2 feeder is 0.051%, while that value is 0.02% for W-1 feeder. It is to be noted that FAC is reduced substantially even though the Cr content of W-2 feeder is still very low.

컴퓨터 시뮬레이션을 이용한 리니어 피더의 설계 및 분석 (Design and Analysis of a Linear Feeder using Computer Simulation)

  • 이규호;김성현;정진태
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 추계학술대회논문집
    • /
    • pp.749-753
    • /
    • 2007
  • The purpose of this study is to design of a linear feeder using a multi body dynamic program, and to analyze a dynamic motion of the feeder that can transport small mechanical parts uniformly. In order to establish the analysis model of the linear feeder, each parts of the feeder are divided into two types which the rigid and flexible body. For the dynamic simulation, RecurDyn, which is a commercial multi-body dynamic package, is used. We also consider the design parameters for optimal dynamic motion such as centroid, stiffness, and mass of the feeder system. In order to analyze the dynamic motion of a linear feeder, the displacements of the feeder are measured by several accelerometers when it is in an operating condition. After the signal data from the accelerometers are captured in the time domain, the dynamic motion in the space is visualized by using graphic computer software.

  • PDF

향후 신뢰도 목표를 만족하는 개폐기 설치 기준 제시 (The Switch Installation Criteria For Satisfying Future Reliability Goal)

  • 조남훈;오정환;하복남;이흥호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권9호
    • /
    • pp.433-440
    • /
    • 2002
  • The addition of switches to a distribution feeder does, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder. To cover its service area so that feeder-level delivery reaches sufficiently close to all customers, feeders typically split their routes many times, in what is often called a lateral feeder. It is interesting to note, however, that the effectiveness of a switch is very much dependent on the types of lateral feeder. The types of lateral are classified into two types. The first is loop lateral feeder that can connect its load to an adjacent feeder through a tie line in case that a fault occurs in its feeder and it is laid out so that every feeder has complete fault backup through re-switching of its loads to other sources like a main feeder The second is the radial lateral feeder cannot connect its load to an adjacent line, no provision is made for contingency backup of feeders. There are no other circuits in the radial lateral feeder form which to restore power. In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

간선 및 분기선의 개폐기 설치 효과 분석(II) (Reliability analysis of the switch installation in the main feeder and in the radial/loop lateral feeders in distribution system)

  • 조남훈;오재형;이흥호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.83-86
    • /
    • 2002
  • In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

  • PDF

자동 부품 정렬기 응용계획과 전용 DB 설계 (Planning of Part Feeder and Design of a Data Base for Part Feeder Planning System)

  • 국금환;박용택
    • 한국정밀공학회지
    • /
    • 제19권7호
    • /
    • pp.116-124
    • /
    • 2002
  • The planning of part feeder and other manufacturing automation equipments is almost always underestimated. Planning ahead for those crucial pitfalls can permit steps to take to minimize heir impacts, especially if the problems can be discovered in the planning phase, not on the shop floor. Planning process is an engineering process, namely a series of trade-offs. The effective trade-offs in the shortest amount of time can be possible with the help of a computer-aided ngineering (CAE) technique. The main parts of CAE fur part feeder are database system of fabricated workpiece parts, part feeders, part feeder components. In this study, a planning process of part feeder is presented. Especially, a systematic analysis of workpiece parts and part feeders is performed for the design of databases of CAE system.

분산전원이 연계된 배전 계통의 고장 선로 구분 (Identification of the faulted Feeder it Distribution Networks with Distributed Generations)

  • 김세근;김광호;장성일;강용철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.257-259
    • /
    • 2004
  • This paper proposes the identification method for the faulted feeder, where it identify whether the faulted feeder is the DG-connected feeder or the neighboring feeder (but sharing the same bus of the substation). In general, DG has to be disconnected from the grid when the fault occurs on the interconnected distribution feeder as soon as possible. However, the faults occured on the neghboring feeder would mistakenly cause the disconnection of the DG. For reliable operation of DG, DG should be sustained at the fault occurred on neighboring distribution feeders. The proposed identification method utilizes the impedance monitored from the DG and examines the coordination of overcurrent relay of the distribution system. This paper describes how the proposed method to identify the faulted feeder and how the method can be utilized.

  • PDF