• Title/Summary/Keyword: Fast Track method

Search Result 108, Processing Time 0.026 seconds

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

A Method of Fast Track Merging for Multi-Target Tracking under Heavy Clutter Environment (복잡한 환경에서 다중표적추적을 위한 고속 트랙병합 기법)

  • Lee, Seung-Youn;Yoon, Joo-Hong;Lee, Seok-Jae;Jung, Young-Hun;Choe, Tok-Son
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.15 no.4
    • /
    • pp.513-518
    • /
    • 2012
  • In this paper, we proposed a method of fast track merging which is the foundation of track to track association technique. The existing method of track merging is performed throughout comparison between tracks to tracks. Therefore, it has heavy calculation time. In our research, we developed a method for fast clustering by using nearest neighbor measurement identification. The simulation results show that the proposed method is more faster than previous method about 3.3%. We expect that this method could be effectively used in multi-target tracking particularly in heavy clutter environment.

A Case Study of BIM application to the Building Construction Project using Fast Track Method (Fast Track 건축공사의 BIM 적용 사례에 관한 연구)

  • Yoo, Pilsang;Han, Byeong-Min;Jeong, Mingu;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.210-211
    • /
    • 2013
  • The purpose of this research is to perform a case study for verifying problems of BIM application to the building construction project using Fast Track method. The object of case study is an actual construction project completed in 2013. As a result, some problems and solutions for those were extracted. The result of this study will contribute revitalization to the BIM application in the project using Fast Track method.

  • PDF

Application Method of Phase Division of Fast Track for Construction Project with Complex Structures (복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석)

  • Kim, Hyun Soo;Hwang, Jae Yoeng;Kang, Hyo Jeong;Park, Sang Mi;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.95-105
    • /
    • 2022
  • Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.

The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis (댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구)

  • Yoon, Jae-Ho;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.715-724
    • /
    • 2003
  • It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.

AR system for FAB construction management using BIM data under fast track condition (패스트트랙 환경에서 FAB신축을 지원하는 BIM기반 AR 시스템 개발)

  • Lee, Sang-Won;Lee, Kwang-Soo;Choi, Sung-In;Ryu, Seong-Chan;Park, Jung-Seo
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.1-18
    • /
    • 2022
  • New Fabrication Facility (FAB) construction is performed with Building Information Modeling (BIM) based design. The BIM design data keep updated during the FAB construction. To improve fast-track construction management, a Fabrication Facility Augmented Reality (FABAR) was developed. This study introduces a FABAR system development process and shows performance evaluation results of the FABAR prototype system. The FABAR is implemented with three major modules: Augmented Reality (AR) visualization unit (Room-box) to transfer big BIM data to AR data, AR registration and tracking unit to match AR with real scape and to keep AR coordination in real, and AR data management unit to enhance usability. The prototype performance results were as follows: visualization of design BIM data via AR within 24 hours, precise AR registration and tracking registration, and appropriate usability to support FAB construction management at site. The results indicate that the FABAR is applicable for FAB construction management. Especially, the BIM data transformation method using Room-box in this study signifies a new construction management approach using fluctuating BIM design data in the fast track construction condition.

Properties and Application of Y-Steel Sleeper in Track-Laying (궤도에서 Y형 강재침목의 특성 및 적용)

  • Kang Bo-Soon
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.3
    • /
    • pp.203-209
    • /
    • 2005
  • Y-form steel sleeper are currently enjoying a renaissance in Germany. Their use on ballast track proves hat-especially under extreme conditions and loads-they reliably help ensure high stability and a long service life of the track. In addition to conventional partly mechanised tracklaying methods, a new Method has been developed that for the first time enables Y-form sleepers to be laid on an assembly-line basis at a fast rate and with high quality.

Application of Y-Steel Sleeper in Track-Laying (궤도건설에 있어서의 Y형 강침목 적용)

  • 강보순
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.642-647
    • /
    • 2002
  • Y-form steel sleeper are currently enjoying a renaissance in Germany. Their use on ballast track proves that-especially under extreme conditions and loads-they reliably help ensure high stability and a long service life of the track. In addition to conventional partly mechanised tracklaying methods, a new Method has been developed that for the first time enables Y-form sleepers to be laid on an assembly-line basis at a fast rate and with high quality.

  • PDF

Real-time Automatic Target Tracking Based on a Fast Matching Method (고속정합법에 의한 실시간 자동 목표 추적)

  • 김세환;김남철
    • Proceedings of the Korean Institute of Communication Sciences Conference
    • /
    • 1987.04a
    • /
    • pp.60-66
    • /
    • 1987
  • In this paper a fast matching method using subtemplate and search and down technique to reduce very heavy computational load of the conventional matching method, is presented The proposed method is spplied to an automatic target tracker in order to track one moving object in comparatively simple backgoriund. Experimental results show that istperformanced is not so degraded in spite of high computational reduction as that of the conventional matching method.

  • PDF

Real-time Automatic Target Tracking Based on a Fast Matching Method (고속 정합법에 의한 실시간 자동목표 추정)

  • 김세환;김남철
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.25 no.1
    • /
    • pp.63-71
    • /
    • 1988
  • In this paper, a fast matching method using hierarchical neighborhood search and subtemplate to reduce very heavy computational load of the conventional matching method, is presented. Some parameters of the proposed method are chosen so that an automatic target tracker to which it is applied can track one moving object well in comparatively simple background. Experimental results show that its performance is not so degraded in spite of high computational reduction over that of the matching method using 3-step search.

  • PDF