• Title/Summary/Keyword: Factory building

Search Result 275, Processing Time 0.031 seconds

Development of a Factory Layout Design System using Leisure-Boat Building Process (레저보트 생산공정정보 기반의 공장 레이아웃 설계 시스템 개발)

  • Lee, Dong-Kun;Jeong, Yong-Kuk;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.1
    • /
    • pp.14-24
    • /
    • 2013
  • The marine leisure industry in Korea has been the focus of the power of economic growth and the creation of jobs in recent years. In this regard, many studies concerning marine leisure are on-going in various fields. In this paper, developed a layout system and algorithm can resolve the factory and facility layout problem. For a layout design of leisure-boat factories, the leisure-boat production process is analyzed in order to derive standard production space elements for the layout of the factory. Based on the results, a draft design of the factory layout is carried out based on the manpower planning data, as well as the characteristics and relationships of each process data. A layout design of this paper can be verified through a factory simulation solution and we suggest the verification method using a SBD(simulation based design) methodology. The layout system takes into account the user's accessibility and extendibility, so it is web-oriented and uses RIA (rich Internet Application) technology. Furthermore, the system and layout algorithm of this paper are verified with samples data that show the efficient factory arrangement and practical application method.

Embedded Tiny Web Server System for Remote Monitoring (원격 감시를 위한 내장형 소형 웹 서버)

  • 안광혁;유영동;홍석교;고영길
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.116-116
    • /
    • 2000
  • This paper describes an experimental embedded tiny web server system that monitors the processing of manufacture using the Internet. The object of this study is developing of an embedded tiny web server that connects the stand-alone machines in factory to the Internet. Using the World Wide Web (WWW), we proffer user-friendly environments to users. Anyone with a web browser may easily access the processing of manufacture in the factory. Through connecting different network system, our web server extends the private networks to the Internet, the global networks. Our embedded tiny web server is ideal for process control, building and facility management system, factory automation and even home automation.

  • PDF

Smart Factory using IoT based on Wi-SUN (Wi-SUN 기반 IoT 활용 스마트 팩토리)

  • Kim, Dongwon;Yoon, Mi-Hee
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.05a
    • /
    • pp.522-523
    • /
    • 2022
  • In this paper, we design a gateway protocol architecture for building an IoT-based smart factory. A smart factory system consists of several terminal devices, gateways and servers, and connects them through a wireless network. The terminal device collects information from various sensors and transmits the information to the server through the gateway. The terminal device controls the actuator by receiving a control signal according to a control algorithm of the server or by manual operation. Therefore, the gateway system connects Wi-SUN, a wireless smart utility network, and the Internet, serves as a Wi-SUN coordinator, and is equipped with Modbus-TCP to interwork with SCADA.

  • PDF

Methods to Improve Problems in The Smart Factory Operation Process (스마트공장 운영 과정에서 나타나는 문제점 개선 방안)

  • Dong-Woo Lee;Seong-Hoon Lee
    • Journal of Internet of Things and Convergence
    • /
    • v.9 no.2
    • /
    • pp.41-46
    • /
    • 2023
  • Smart factory construction projects are continuously being carried out domestically and abroad. In particular, in times of increasing uncertainty, interest in smart factories is increasing to improve corporate productivity. Currently, the government-led smart factory construction project is continuously being promoted in Korea. The tangible results of this construction project are very positive in indicators such as productivity improvement, quality improvement, and cost reduction. On the other hand, various contents are revealed in the survey to identify operational difficulties after building a smart factory. In this study, we analyzed difficulties (problems) in operation after establishing the system shown in the survey conducted in 2017 and 2020, and derived improvement plans for them. If these improvement measures are implemented in the relevant process of the smart factory construction project, it is expected that the operational difficulties felt by companies will be reduced, and a system with higher satisfaction than before will be established.

Influence Factors and Management based on Phase of Building Construction for the Improvement of Post Occupancy Indoor Air Quality

  • Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.576-586
    • /
    • 2011
  • In recent years, pollution in residential spaces has been a significant area of concern. In particular, the indoor air quality (IAQ) of an apartment building before occupancy, which is related to the interior material, is a serious problem. Unlike previous research, which has mainly focused on pollution control after construction, this study has derived influencing factors and priority of management with a controlling schedule for IAQ. The objectives of this research are 1) control of schedule or improvement of management for IAQ, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall?based apartment buildings and in column?based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

Evaluation of 2 Part Curtainwall Structural Silicone Sealant (커튼월용 2액형 구조용 실란트 혼합비별 물성 평가 연구)

  • Kim, Sung Hyun;Jung, Jin-young;Ahn, Myung-Su;Seo, YeonWon;Bae, Keesun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.78-80
    • /
    • 2014
  • Silicone structural glazing (SSG) is a method utilizing a silicone adhesive to attach glass, metal, or other panel material to the structure of a building. Windload and other impact loads on the facade are transferred from the glass or panel through the silicone structural sealant to the systems' framework. Silicone structural glazing systems are currently a very common method of glazing throughout the world. Locally, structural silicone glazing has become very common to achieve aesthetically pleasing and high utilization of small land for both residential and commercial building. Although structural silicone glazing has been utilized for approximately thirty years in Korea, the understanding of its technology was low and limited. Consequently, Korean projects experienced many quality issues during assembly and construction, even in very recently finished buildings. Adhesion loss and water infiltration occurred on more than one project, and the time and cost to repair these issues were substantial. In general, there are two kinds of structural silicones depending on fabrication methods. 1part structural silicone is for site glazing system and 2part structural silicone is for unitized factory glazing system. In this paper, 2part structural silicone which is very common for factory fabricating curtainwall systems was evaluated with regards to various mixing ratio. Since the structural performance of 2part sealant can be affected by mixing ratios, some extra ranges of recommended mixing ratio were evaluated to see any performance differences. Besides on cure profile, comparative evaluations for mechanical properties and adhesion develop on common building substrates were conducted.

  • PDF

Influence Factors of Aerial Environment on Project Schedule Management

  • Hong, Jun-pyo;Lim, Hyoung-chul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.608-611
    • /
    • 2015
  • The objectives of this research are 1) control of schedule or improvement of management for aerial environment, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall-based apartment buildings and in column-based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

  • PDF

Privacy-preserving Customized Order Service Protocol based on Smart Contract in Smart Factory (프라이버시를 제공하는 스마트 컨트랙트 기반의 스마트 팩토리 주문제작 프로토콜)

  • Lee, YongJoo;Woo, Sung-Hee;Lee, Sang-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.23 no.2
    • /
    • pp.215-222
    • /
    • 2019
  • Advances in technologies about 3D (three-dimensional) printing and smart factory related issues will have the effect of reducing the cost of building a smart factory and making various types of service available. Manufacturers and service providers of small assets work with outside experts to provide small amounts of customized ordering services. If customers have to disclose their private information to subscribe to a new service, they may be reluctant to use it and the availability of developed technology may cause slow progress. We propose a new protocol for customized order service for smart factory. The proposed approach is designed to meet requirements of security and based on smart contract in IoT convergence network. We analyzed the requirements of the proposed approach which provided anonymity, privacy, fairness, and non-repudiation. We compared it with closely related studies to show originality and differences.