Journal of the Korea Academia-Industrial cooperation Society
/
v.7
no.3
/
pp.404-408
/
2006
In this paper, connection strength between facing block and tie-bar was investigated through experimental study with varying in-fill material such as concrete, soil and crushed stone. Also, connection strength between anchor block and tie-bar was investigated with varying in-fill material. According to the experimental results, in case of using in-fill concrete, connection strength between facing block and tie-bar was larger than allowable tension load of tie-bar. Whereas in case of using in-fill soil or crushed stone, connection strength between facing block and tie-bar was less or similiar to allowable tension load of tie-bar. Connection strength between anchor block and tie-bar for which crushed stone was used as in-fill material, was larger than allowable tension load of tie-bar.
Proceedings of the Korean Geotechical Society Conference
/
1999.10a
/
pp.465-472
/
1999
A small scale model reinforced soil wall was constructed in a laboratory to investigate role of the wall facing and the effect of construction sequence on the wall. A panel type facing system and a block facing system are introduced for test. These two different types of facing adapt different construction procedure. The model wall is built with geogrid reinforcement, sand, and the facings on rigid surface. The model wall is instrumented with earth pressure gauges, LVDTs, and strain gauges. It is found in this study that the reinforced soil wall system built with geogrids and panel type facing system be the safest reinforced soil wall ever compared to the block type facing. Thus, it is recommended that study for the wall system be necessary for further wide usage in the future.
Proceedings of the Korean Geotechical Society Conference
/
2001.10a
/
pp.315-321
/
2001
Since 1984, block-type reinforced earth wall with geogrid reinforcement has been widely used for retaining wall applications till now in Korea. The use of geogrid as a reinforcement in the reinforced earth wall is steadily increased in an amount over 1,500,000㎡ in a year However, still need exists that some problems in design and construction practices should be made to review, Therefore, this paper reviewed reasonable criteria for selection of backfills, design details considering the effect of the upper soil slope on reinforced earth wall, horizontal displacement of facing block during compaction, and the damage of geogrid reinforcements on the edge part of facing block. Finally, alternative methods of measures on those problems are proposed.
The use of geogrid-reinforced earth wall technologies has progressed rapidly over the past 10 years in Korea because these technologies have advantages such as economical efficiency, graceful appearance, and easy construction. The geogrid used in the reinforced earth wall with concrete block facing can be subjected to damage among the upper and lower blocks and at the interface between the block and the geogrid. Therefore, when design of the geogrid-reinforced soil walls the required connection strength of the geogrid to the wall facing is an issue. In this study, new connection system between facing block and geogrid is developed to improve the damages of geogrid in the existing connection systems. The new connection devices are made of steel and have I-shape. This paper describes the test method and results of the laboratory testing for determination of connection strength in connection system using the I-type connection device.
The existing geotextile reinforced soil wall methods have a demerit in terms of esthetic view because concrete panel or block are used as wall facing of the methods. If grass planting walls could be used in reinforced soil slope or wall methods, efficiency of the methods would be increased with maximization of advantage of the methods. In this study, some possible methods in which grass planting wall is used as wall facing are devised. A series of laboratory model tests were performed to investigate the behavior of newly devised methods in order to compare with the results of each others. As a major result, it was found that this kinds of grass wall facing methods could be accepted as a new construction method even in the sense of stability.
A new type of reinforced earth wall(REW) system is developed with vegetated facing which provides proper environment for long-term vegetation and also applicable to high retaining wall system. Vegetated retaining wall is a green alternative for retaining walls and an effective way to reduce heat island effect than conventional block or concrete systems. Several construction sites using vegetated facing is observed to monitor adaptation state of vegetation and estimate surface temperature of wall facing over two years. It was observed that a number of plants including Siberian chrysanthemum adapt well to the inside of the facing blocks because vegetation bag helps to keep a proper condition for vegetation. According to the results using thermographic camera, average surface temperature of vegetated facing is higher for all ranges of coverage ratio of vegetation. The increment of average surface temperature of vegetated facing is larger than that of non-vegetated facing when the air temperature rises, and vice versa.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2005.10a
/
pp.404-409
/
2005
The reinforced concrete blocks for reinforced earth layer are combined with soil structures consisted of facing unit, reinforcing materials and soil. Those environmentally friendly facing units of reinforced concrete blocks are made of mine waste and tailing and that will be played a role of the effects of recycling use of wasted resources. The block are consisted of three types as curved or straight in order to control topography. The systems are also not limited to wall hight so that they are effectively used for protecting the slope of banking and cutting of earth works. The reinforced concrete blocks developed this time will be effectively applied for not only retaining wall, road, park, golf course, public office building constructions but also protecting of slope stabilization projects.
International Journal of Precision Engineering and Manufacturing
/
v.9
no.2
/
pp.34-38
/
2008
Commercially available magnetic barrel machines equipped with permanent magnets have certain limitations: work can only be finished effectively in limited areas of the container because permanent magnets are arranged two-dimensionally on the magnet disk. We overcame this problem by developing a new magnetic barrel machine equipped with a three-dimensional magnet arrangement. The effectiveness of the new machine has already been reported; this study improved the machine's polishing ability by changing the polarity of magnets on a magnet block. Polishing experiments confirmed the most effective arrangement of magnets on the magnet block. An alternating arrangement of north and south poles produced far superior polishing characteristics than a uniform arrangement of the same pole facing outward. Alternating polarity probably causes increased quantities of barrel media to work together. Finally, we introduced stronger permanent magnets to the magnet block, and found that the increased magnetic field also improved polishing ability.
Ikseon-Dong 166 is one of the traditional urban resident area developed during 1930's. The purpose of this research is to analyze the structural relationship between a conventional housing unit plans and modern block plans based on orthogonal geometry. To fully explore the selling point of the new urban development, the planner or real estate developer in private sector did not abandon or compromise the conventional house layouts, consists of single layer of rooms keeping the main room facing south. This study concludes the following factors connecting the urban and architectural plans. Oblong block plans following east-west direction did not allow the southern exposure of courtyard and main room, which was the absolute requirement for traditional house units, the longer side of block plan followed north-south direction as a result. Considering the possibility of rent, having entrance at the east or west side of individual site enables two separate household maintain their spatial privacy. In addition to the factors mentioned above, when the blocks are to be divided into individual addresses, north-south oblong block plans maintained the length to face the front road minimum while the southern exposure maximized. These factors explains why the private developers maintained their blocks elongated to north-south direction when the block plans laied out by public sectors which did not care that much of southern exposure show random orientation in the view point of solar exposure.
Proceedings of the Korean Geotechical Society Conference
/
2000.09a
/
pp.53-58
/
2000
The KOESWall system that minimizes the horizontal deformation of reinforced wall effectively was developed bt E&S Eng. Co., Ltd. in 1999. Due to its systematical feature i.e. isolated construction method. KOESWall system is able to use as temporary structures more economically without the facing block. In this report, it is shown that the case history of KOESWall as a temporary soil retaining structure and the field measuremnets.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.