• Title/Summary/Keyword: Facility risk

Search Result 544, Processing Time 0.031 seconds

Consequence Analysis and Risk Reduction Methods for Propulsion Test Facility (추진시험설비의 사고피해영향분석 및 리스크 감소방안)

  • Shin, Ahn-Tae;Byun, Hun-Soo
    • Korean Chemical Engineering Research
    • /
    • v.54 no.3
    • /
    • pp.360-366
    • /
    • 2016
  • The Propulsion Test Facilities for the development of Korea Space Launch Vehicle-II are being built, some test facilities are completed and various combustion tests are running. The Propulsion Test Facilities consists test-stand, which carries out tests for engine development model, and various sub-systems and vessels containing LOX and Jet A-1 as propellant. There are always risks of fire and explosion at the test-stand since engine development model is conducted at test-stand with real combustion test with very high pressure, mixed propellant and high energy. In this paper, in order to establish the consequence analysis and risk reduction measures in the Propulsion Test Facilities, followings are considered. 1) a propellant leak accident scenario is assumed in test-stand. 2) TNT equivalent model equation based on blast wave of the explosion was used to analyze blast overpressure and impacts. Also, technical, systematic and managemental measure is described to ensure risk reduction for propulsion test facility.

A Study on the Cost Analysis of risk facilities using e-Consequence Analysis - Focusing Steel pipe Industry (e-CA(e-Consequence Analysis)를 활용한 위험설비의 비용 분석에 관한 연구 : 강관제조업 사례를 중심으로)

  • Kwon, Hyeok Min;Hwang, Yong Woo;Lee, Ik Mo;Chun, Young Woo;Choi, Young Hun
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.3
    • /
    • pp.27-36
    • /
    • 2018
  • The steel pipe manufacturing industry deals with facilities and materials. Especially thermal facilities are close to vapor cloud explosion (VCE) and may cause secondary damage to facilities because they deal with corrosive substances such as hydrofluoric acid, sulfuric acid and acid, fire, explosion, leakage etc. It is in danger. In this study, hazard identification method was conducted using HAZOP techniques and quantitative risk analysis was conducted using e-CA, a program that supports accident impact analysis. Equipment in the influence range of ERPG - 3 was determined to be a facility requiring replacement. It was decided that neutralization is necessary using slaked lime. Based on the cost of loss, We presented the proper replacement which is the timing of the dangerous facility. As a result, It was ideal to replace the facilities with 20 years of heat treatment facilities, one year of hydrofluoric acid storage tank, 20 years of sulfuric acid storage tank, and 5 years of hydrochloric acid storage tank.

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

A Probabilistic Analysis on the Repair and Replacement Cost of Educational Facilities (교육시설물의 수선교체비용에 대한 확률론적 분석 연구)

  • Yu, Yeong-jin;Son, Kiyoung;Kim, Ji-Myong;Kim, Taihui
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.1
    • /
    • pp.3-12
    • /
    • 2018
  • Educational facilities are more uncertain about maintenance costs due to their comprehensive and long life-cycle compared to commercial buildings. In addition, maintenance of the existing post management system can not maintain the original function of education facilities continuously and economically. In order to overcome this problem, it is necessary to analyze the repair and replacement cost for the uncertainty factor in maintenance. This study propose a model to determine repair and maintenance cost and cycle of educational facility based on probabilistic estimation concept. For the analysis, Monte Carlo simulation, a probabilistic analysis method, was applied based on the repair and maintenance history data of the educational facilities in Florida. The results of this study can be used as a guideline for quantitative facility management and facility management research.

A Study on the Circulation System of Biosafety Level 4 Laboratory Facilities (생물안전 4등급(BL4) 실험시설의 동선계획에 관한 연구)

  • Kwon, Soonjung;Choi, Hongbin
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.17 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Recently, with the advent of high risk infectious agent such as the Ebola virus, SARS, special research facilities dealing with such dangerous pathogenic are drawing attention gradually. Especially, this kind of facilities can be called BL4(Biosafety Level 4) facility. At the moment, Korean government is going to construct BL4 institute in order to handle efficiently such kind of pathogen. However, there are no proper design guidelines for BL4 facility. This paper proposes circulation system of BL4 facility on the basis of analysis of existing BL4 guidelines of Canada, and Korean BL3 facilities. The outcomes of this study are as follows. At first, functional areas of BL4 facilities have been divided into three categories according to the hazard level ; dangerous area, transitional area, and ordinary area. Secondly, circulation system of BL4 facility has been explored as a form of diagram according to the circulating subjects. These include human, laboratory animals, hazardous pathogen, equipments and cloth. This study has some limitations in that it lacks empirical evidences and concrete SOPs(Standard Operating Procedure). Despite of some weaknesses, it is expected to give some preliminary guidelines for the design of circulation system in BL4 facilities.

Specific Process Conditions for Non-Hazardous Classification of Hydrogen Handling Facilities

  • Choi, Jae-Young;Byeon, Sang-Hoon
    • Safety and Health at Work
    • /
    • v.12 no.3
    • /
    • pp.416-420
    • /
    • 2021
  • Hazardous area classification design is required to reduce the explosion risk in process plants. Among the international design guidelines, only IEC 60079-10-1 proposes a new type of zone, namely zone 2 NE, to prevent explosion hazards. We studied how to meet the zone 2 NE grade for a facility handling hydrogen gas, which is considered as most dangerous among explosive gases. Zone 2 NE can be achieved considering the grade of release, as well as the availability and effectiveness of ventilation, which are factors indicative of the facility condition and its surroundings. In the present study, we demonstrate that zone 2 NE can be achieved when the degree of ventilation is high by accessing temperature, pressure, and size of leak hole. The release characteristic can be derived by substituting the process condition of the hydrogen gas facility. The equations are summarized considering relation of the operating temperature, operating pressure, and size of leak hole. Through this relationship, the non-hazardous condition can be realized from the perspective of inherent safety by the combination of each parameter before the initial design of the hydrogen gas facility.

Roles of the Community Facilities for Foreigners as a Platform for Urban Globalization - Focused on the Seoul Global Centers - (도시 국제화를 위한 플랫폼으로서 외국인 커뮤니티 시설의 역할에 관한 연구 - 서울시 글로벌센터를 중심으로 -)

  • Choi, Sung-Jin;Han, Sun-Sheng
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.6
    • /
    • pp.81-92
    • /
    • 2019
  • Globalization has diversified ethnic composition thus increased the risk of conflicts and socio-political instability in global cities. However, still the status of community facility in a global city is unclear despite its critical role to build sustainable community in global era. In Seoul, as a reaction of globalization, 19 community facilities known as the 'Seoul Global Center' have been established since 2007 by Seoul Metropolitan Government. These facilities have started to provide basic foreigner services but been transformed to foreigner service hub with multiple functions in terms of a living, a business, a labour, etc. This study explores the role of the community facility for foreigners by using the Seoul Global Center as a case study, conducting a site observation, an interview(13 staff) and a questionnaire(148 visitors). The findings are the community facility functions as a 'global platform' in forms of a policy tool for implementing the urban globalization strategy, a mediator connecting foreign migrants with local communities, an applicant for successful settlement of foreign residents, an incubator that grows human and social capital, and a base for collecting and aggregating information on foreign migrants and forming new local identities.

Developing Risk Analysis Methods for Realtime RiskMAP System (실시간 위험지도 시스템을 위한 위험분석 기법 개발)

  • Park, Sang Bae;Lee, Chang Jun;Joo, Yu Kyoung;Oh, Jeong Seok
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.3
    • /
    • pp.27-32
    • /
    • 2020
  • For preventing accident, the risk analysis about gas facilities has been more important since many gas facilities be superannuated. Especially, deriving and simulating risk is very important for preventing and corresponding accidents by means of specific analysis method in complex gas facilities. However, many studies have been not enough not yet in order to derive and simulate risk considering various situations. This paper aims to propose deriving and analyzing risk method around limited area of complex gas facilities. Our study proposes total risk analysis that is composed four methods with individual point of view. The risk analysis system based on RiskMAP immediately informs users changes of e risk in zones according to the status, work and surrounding conditions of the facility. The proposed methods in this research are implemented as software algorithm and applied to risk analysis system using RiskMAP in conjunction with IoT and GPS.