• Title/Summary/Keyword: Expansion planning

Search Result 579, Processing Time 0.035 seconds

A study on the power expansion planning model using multi-criteria decision making rule (다기준 의사결정 모형을 이용한 전력수급계획 모형에 관한 연구)

  • Han, Seok-Man;Kang, Dong-Joo;Kim, Kwang-Mo;Hong, Hee-Jung;H. Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.77-79
    • /
    • 2008
  • The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning not used cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning model using multi-criteria decision rule. This model used multi objective function considering not only cost minimizing but also GENCO's intension. This paper compared proposed model with WASP model in order to verify the result of proposed model.

  • PDF

The development of expansion planning algorithm considering environmental constraints (환경 제약을 고려한 설비계획 방법론 개발)

  • Kim, Yang-Il;Chung, Koo-Hyung;Shin, Hye-Kyeong;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.164-166
    • /
    • 2006
  • Wien Automatic System Planning Package (WASP) which is used to draw out generation expansion planning applies Dynamic Programming in Korea power system panning. While this package has an advantage that computes annual capacity, it has a disadvantage that can't consider environmental constraints. With the effectuation of the Kyoto Protocol in February, 2005, it is expected that CO2 emission has a severe effect on Korean power system. Therefore, as the most important issue, the generation expansion planning considering environmental constraints is rising in power system. This paper develops a mathematic model including not only generation expansion planning but transmission planning and considering regional supply-demand and environmental constraints, especially CO2 emission, and verifies propriety through the case study.

  • PDF

The Environmental Implication of Metropolitan Expansion in Asian Cities : The Role of Planning Practices toward Sustainable Urban Development in Asia

  • Kwon, Chang-Ki
    • Journal of Environmental Policy
    • /
    • v.2 no.2
    • /
    • pp.1-16
    • /
    • 2003
  • This paper focuses on examining environmental implications embedded in recent spatial expansion of the Asian megacities as well as exploring the potentials of planning practices in addressing urban environmental problems. Regardless what underlying forces of recent metropolitan expansion are, nearly all the Asian megacities suffer serious environmental problems as these cities rapidly grow in terms of population and geographical boundaries. Furthermore, the global environmental implication of urban expansion at Asian megacities implies that there must be intense endeavor to develop more innovative policy solution in order to tackle down the worsening urban environmental problems in Asian cities at a metropolitan scale. Given the situation that there has been little attention on environmental consequence of the Asian metropolitan expansion in spatial term, this paper presents the overview on the changing nature of urban environmental problems embedded in the spatial expansion of recent metropolitan area in Asia, along with exploring possible solutions from planning practices guiding sustainable urban development in Asia.

  • PDF

Modeling New Generation Expansion Planning Problems for Applications in Competitive Electric Power Industries (전력시장에 적용 가능한 새로운 전원개발계획문제 모델링)

  • 김진호;박종배;박준호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.521-528
    • /
    • 2004
  • The demise of the native franchise markets and the emergence of competitive markets in electricity generation service is substantially altering the way that operation and planning activity is conducted and is making it increasingly difficult for market participants such as generation firms to prospect the future electricity markets. Traditional generation expansion planning (GEP) problems which centrally determine the least-cost capacity addition plan that meets forecasted demand within pre-specified reliability criteria over a planning horizon (typically 10 to 20 years) is becoming no more valid in competitive market environments. Therefore, it requires to develop a new methodology for generation investments, which is applicable to the changed electric industry business environments and is able to address the post-privatization situation where individual generation firms seek to maximize their return on generation investments against uncertain market revenues. This paper formulates a new generation expansion planning problem and solve it in a market-oriented manner.

A Study on a Generation and Transmission Planning Considering CO2 Emission Constraint and Emission Trading (CO2 배출량 제약과 배출권거래제를 고려한 설비계획 방법론 개발에 관한 연구)

  • Kim, Yang-Il;Chung, Koo-Hyung;Han, Sock-Man;Kim, Bal-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.3
    • /
    • pp.481-490
    • /
    • 2007
  • WASP which is used to plan generation expansion has disadvantages that can't manage environmental factors and regional supply-demand planning. But with the effectuation of the United Nations Framework Convention on Climate Change (UNFCCC) and Kyoto Protocol, it is expected that reducing greenhouse gases affects power system in its long-term generation expansion planning. Therefore national countermeasures is needed. This paper formulates a mathematical model considering CO2 emission constraints and Emission Trading that will be enforced. This model is based on the MEFISET (Model for Economic Feasibility of Interstate Electrical Ties) which was made by Korea Energy Economics Institute and Hong-ik university and manages generation expansion planning. And this mathematical model is verified by studying a case system.

A Study on the Distribution Planning using Computer Systems (전산 시스템을 이용한 배전계획 연구 - CADPAD를 이용한 배전계획 -)

  • Hwang, S.Ch.;Moon, B.H.;Hong, S.H.;Jang, J.T.
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.205-207
    • /
    • 1993
  • Distribution planning requires comprehensive knowledge about not only distribution but also transmission/subtransmission system expansion plan. At the same time, distribution planning is very time consuming and a series of routine job which involves a lot of experience and efforts of planning engineers. Since the quality of distribution planning depends upon the ability of planning engineers, the economy of investment should be taken into consideration. The object of this study is to establish a computerized distribution planning system which helps distribution engineers finding a new system expansion plan. It provides the engineers with at optimal system expansion plan which satisfies the condition of both reliability and economy.

  • PDF

Capacity Expansion Models for Optimum Investment Planning (최적(最適) 투자정책(投資政策)을 위한 시설(施設) 확충(擴充)(Capacity Expansion) 모델의 문헌적(文獻的) 고찰(考察))

  • Kim, Seung-Gwon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.11 no.2
    • /
    • pp.141-154
    • /
    • 1985
  • The capacity expansion problem has been defined. Existing literatures on capacity expansion problems have been reviewed and unified under a structure of problem domain. The problem domain has been defined by three relavent coordinates; function or objective of the project, consideration of resource allocation, and consideration of project sequencing. Long range planning is of vital importance in setting up ultimately efficient capital investment plans to meet immediate demand increase. Simplified expansion sequencing example problems have been introduced and solved to help understanding of a solution scheme.

  • PDF

A Study on Transmission System Expansion Planning using Fuzzy Branch and Bound Method

  • Park, Jaeseok;Sungrok Kang;Kim, Hongsik;Seungpil Moon;Lee, Soonyoung;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • v.2A no.3
    • /
    • pp.121-128
    • /
    • 2002
  • This study proposes a new method for transmission system expansion planning using fuzzy integer programming. It presents stepwise cost characteristics analysis which is a practical condition of an actual system. A branch and bound method which includes the network flow method and the maximum flow - minimum cut set theorem has been used in order to carry out the stepwise cost characteristics analysis. Uncertainties of the permissibility of the construction cost and the lenient reserve rate and load forecasting of expansion planning have been included and also processed using the fuzzy set theory in this study. In order to carry out the latter analysis, the solving procedure is illustrated in detail by the branch and bound method which includes the network flow method and maximum flow-minimum cut set theorem. Finally, case studies on the 21- bus test system show that the algorithm proposed is efficiently applicable to the practical expansion planning of transmission systems in the future.

A Study on the Power Expansion Planning Model Considering the Emission Trading (배출권 거래제를 고려한 전원개발계획에 관한 연구)

  • Ahn, Jung-Hwan;Kim, Bal-Ho H.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.7
    • /
    • pp.957-965
    • /
    • 2012
  • Korean government has been preparing the introduction of Emission Trading as part of the framework convention on Climate Change as a relief of negative downstream effect over electricity industry. This paper develops a mathematical model amenable to analyzing the economic impact of introduced emission trading system on the national generation expansion planning. The developed model was also employed with a case study to verify its applicability.

Probabilistic Technique for Power System Transmission Planning Using Cross-Entropy Method (Cross-Entropy를 이용한 전력계통계획의 확률적 기법 연구)

  • Lee, Jae-Hee;Joo, Sung-Kwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.11
    • /
    • pp.2136-2141
    • /
    • 2009
  • Transmission planning is an important part of power system planning to meet an increasing demand for electricity. The objective of transmission expansion is to minimize operational and construction costs subject to system constraints. There is inherent uncertainty in transmission planning due to errors in forecasted demand and fuel costs. Therefore, transmission planning process is not reliable if the uncertainty is not taken into account. The paper presents a systematic method to find the optimal location and amount of transmission expansion using Cross-Entropy (CE) incorporating uncertainties about future power system conditions. Numerical results are presented to demonstrate the performance of the proposed method.