• Title/Summary/Keyword: Expanded Uncertainty

Search Result 197, Processing Time 0.025 seconds

Uncertainty Analysis of 1 GHz Band Impulse Spectrum Amplitude (1 GHz 대역 임펄스의 스펙트럼 진폭 불확도 평가)

  • Lee, Dong-Joon;Lee, Joo-Gwang;Kwon, Jae-Yong;Kang, Tae-Weon
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.23 no.12
    • /
    • pp.1365-1372
    • /
    • 2012
  • This paper presents a methodology to accurately evaluate the spectral components of impulse signals which are delivered from an impulse generator through the measurement system. The complicated terms for uncertainty measurement of impulse spectrum amplitude and their analysis methods and experimental results are discussed. The expanded uncertainty of the impulse spectrum measurement is 0.015, which is believed to be the best domestic measurement capability and comparable to those of world class.

Uncertainty Analysis of Spinning Rotor Gauge Calibrated by High Vacuum Standard of Static Expansion Method (정적법 고진공표준기에 의해 교정한 스피닝 로터 게이지 불확도 평가)

  • Hong S. S.;Lim I. T.;Shin Y. H.;Chung K. H.
    • Journal of the Korean Vacuum Society
    • /
    • v.14 no.4
    • /
    • pp.186-194
    • /
    • 2005
  • A Spinning Rotor Gauge was calibrated between $4.04\times10^{-3}$ Pa and $1.11\times10^{-2}$ Pa at the high vacuum standard by static expansion method. The results were analysed according to the document of 'Guide to the Expression of Uncertainty in Measurement' of ISO. The expanded uncertainty was $3.0035\times10^{-3}$ Pa at $7.5448\times10^{-3}$ Pa. $95\%$ confidence level, and coverage factor of k = 1.

Uncertainties in Pressure Calibration of Laboratory Standard Microphones by Reciprocity Technique (가역방법에 의한 표준 마이크로폰 음압교정의 불확도)

  • 서상준;권휴상;이용봉;서재갑
    • The Journal of the Acoustical Society of Korea
    • /
    • v.23 no.2
    • /
    • pp.90-102
    • /
    • 2004
  • According to the Mutual Recognition Arrangement (MRA), the calibration and/or test laboratories should satisfy the management and technical requirements ISO 17025 or equivalent. Chapter 5, Section 5.10.4 of the technical requirement of ISO 17025 suggests the required informations for calibration certificates, one of them is to state the uncertainty of measurement. The uncertainties of measurement in reciprocity calibration of standard laboratory microphone were calculated. The expanded uncertainties for 1 and 1/2 inch microphones were 0.03 dB in the middle frequency range and they increased up to 0.10 dB and 0.11 dB at 20 Hz, 0.07 dB and 0.08 dB at high frequency, respectively.

Construction of AC-DC Magnetic Field Standard Systems and Results of International Key Comparison (직류-교류 자기장 표준 시스템 제작 및 국제비교 결과)

  • Park, Po-Gyu;Kim, Young-Gyun
    • Journal of the Korean Magnetics Society
    • /
    • v.14 no.6
    • /
    • pp.201-206
    • /
    • 2004
  • The AC-DC magnetic field standard systems were constructed for the calibration of magnetometers for low magnetic field and the tests for low magnetic field characteristics of sensors and materials. In the range of 1 mT, the expanded uncertainty of dc is 8${\times}$10$\^$-6/, ac uncertainties are 0.16% in 0.1~1 kHz, 0.26% in 1~5 kHz, and 0.44% in 5~20 kHz. We have been participated in international key comparison(KC) to achieve the equality and the mutual agreement between standard institutes for the results of calibrations and tests. KRISS participating in ac-dc magnetic flux density of KC got equal level of uncertainty results compare with the advanced nations. It confirm that measurement ability of magnetic flux density is high level in the world.

A Study on Comparison between the Propagation of Uncertainty by GUM and Monte-Carlo Simulation (측정 불확도 표현 지침서(GUM)와 Monte-Carlo Simulation에 의한 불확도 전파 결과의 비교 연구)

  • Jungkee Shu;Hyungsik Min;Minsu Park;Jin-Chun Woo;Jongsang Kim
    • Journal of the Korean Chemical Society
    • /
    • v.47 no.1
    • /
    • pp.31-37
    • /
    • 2003
  • The expanded uncertainties calculated by the application of GUM -approximation and Monte-Carlo simulation were compared about the model equation of one-point calibration which is widely used for the measurements and chemical analysis. For the comparisons, we assumed a set of artificial data at the various level of concentration and dispersion of t or normal distribution. Mistakes of more then 50 % was revealed at the values calculated by GUM-approximation in comparison with those of Monte-Carlo simulation because of the excess dispersion from t-distribution and non-linearity by division in the equation. In contrary, the mistake of calculation due to non-linearity of the equation was not observed in the level of detection limits with the equation of one-point calibration, because of the relatively large values of uncertainty in response.

Potential Impact of Climate Change on Distribution of Hedera rhombea in the Korean Peninsula (기후변화에 따른 송악의 잠재서식지 분포 변화 예측)

  • Park, Seon Uk;Koo, Kyung Ah;Seo, Changwan;Kong, Woo-Seok
    • Journal of Climate Change Research
    • /
    • v.7 no.3
    • /
    • pp.325-334
    • /
    • 2016
  • We projected the distribution of Hedera rhombea, an evergreen broad-leaved climbing plant, under current climate conditions and predicted its future distributions under global warming. Inaddition, weexplained model uncertainty by employing 9 single Species Distribution model (SDM)s to model the distribution of Hedera rhombea. 9 single SDMs were constructed with 736 presence/absence data and 3 temperature and 3 precipitation data. Uncertainty of each SDM was assessed with TSS (Ture Skill Statistics) and AUC (the Area under the curve) value of ROC (receiver operating characteristic) analyses. To reduce model uncertainty, we combined 9 single SDMs weighted by TSS and resulted in an ensemble forecast, a TSS weighted ensemble. We predicted future distributions of Hedera rhombea under future climate conditions for the period of 2050 (2040~2060), which were estimated with HadGEM2-AO. RF (Random Forest), GBM (Generalized Boosted Model) and TSS weighted ensemble model showed higher prediction accuracies (AUC > 0.95, TSS > 0.80) than other SDMs. Based on the projections of TSS weighted ensemble, potential habitats under current climate conditions showed a discrepancy with actual habitats, especially in the northern distribution limit. The observed northern boundary of Hedera rhombea is Ulsan in the eastern Korean Peninsula, but the projected limit was eastern coast of Gangwon province. Geomorphological conditions and the dispersal limitations mediated by birds, the lack of bird habitats at eastern coast of Gangwon Province, account for such discrepancy. In general, potential habitats of Hedera rhombea expanded under future climate conditions, but the extent of expansions depend on RCP scenarios. Potential Habitat of Hedera rhombea expanded into Jeolla-inland area under RCP 4.5, and into Chungnam and Wonsan under RCP 8.5. Our results would be fundamental information for understanding the potential effects of climate change on the distribution of Hedera rhombea.

Development of Primary Standard Gas Mixtures of Fourteen Volatile Organic Compounds in Hazardous Air Pollutants for Accurate Ambient Measurements in Korea (at 1 μmol/mol Levels) (유해대기오염물질 중 14종의 휘발성유기화합물 1차 표준가스개발 (1 μmol/mol 수준))

  • Kang, Ji Hwan;Kim, Young Doo;Kim, Mi Eon;Lee, Jinhong;Lee, Sangil
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.34 no.2
    • /
    • pp.331-341
    • /
    • 2018
  • Hazardous air pollutants(HAPs) in the atmosphere are regulated as major air pollutants in Korea by the Air Pollution Control Act. In order to manage and control HAPs, accurate standards, which are traceable to the International System of Units(SI), are required. In this study, primary standard gas mixtures(PSMs) of volatile organic compounds(VOCs) which are specified as HAPs were developed at $1{\mu}mol/mol$ levels. The selected fourteen VOCs include Benzene, Toluene, Ethylbenzene, m-Xylene, Styrene, o-Xylene, Chloroform, 1,1,2-Trichloroethane, Trichloroethylene, Tetrachloroethylene, 1,1-Dichloroethane, Carbon tetrachloride, 1,3-Butadiene, and Dichloromethane. The HAPs PSMs were gravimetrically prepared in aluminum cylinders and their consistency was verified within the relative expanded uncertainty of 0.71% (k=2). Potential adsorption loss onto the internal surface of cylinders was estimated by cylinder-to-cylinder division method. No adsorption loss was observed within the uncerainty of 0.53%. The long-term stability of the HAPs PSMs was evaluated comparing with freshly prepared HAPs PSMs. The HAPs PSMs were stable for one year within the uncertainty of 0.38%. The final uncertainty of the PSMs was determined by combining the preparation uncertainty, verification uncertainty, and stability uncertainty. Finally, traceable and stable HAPs PSMs at $1{\mu}mol/mol$ levels were developed with the uncertainty of less than 0.76% in high-pressure aluminum cylinders.

Optimization Methodology for Sales and Operations Planning by Stochastic Programming under Uncertainty : A Case Study in Service Industry (불확실성하에서의 확률적 기법에 의한 판매 및 실행 계획 최적화 방법론 : 서비스 산업)

  • Hwang, Seon Min;Song, Sang Hwa
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.137-146
    • /
    • 2016
  • In recent years, business environment is faced with multi uncertainty that have not been suffered in the past. As supply chain is getting expanded and longer, the flow of information, material and production is also being complicated. It is well known that development service industry using application software has various uncertainty in random events such as supply and demand fluctuation of developer's capcity, project effective date after winning a contract, manpower cost (or revenue), subcontract cost (or purchase), and overrun due to developer's skill-level. This study intends to social contribution through attempts to optimize enterprise's goal by supply chain management platform to balance demand and supply and stochastic programming which is basically applied in order to solve uncertainty considering economical and operational risk at solution supplier. In Particular, this study emphasizes to determine allocation of internal and external manpower of developers using S&OP (Sales & Operations Planning) as monthly resource input has constraint on resource's capability that shared in industry or task. This study is to verify how Stochastic Programming such as Markowitz's MV (Mean Variance) model or 2-Stage Recourse Model is flexible and efficient than Deterministic Programming in software enterprise field by experiment with process and data from service industry which is manufacturing software and performing projects. In addition, this study is also to analysis how profit and labor input plan according to scope of uncertainty is changed based on Pareto Optimal, then lastly it is to enumerate limitation of the study extracted drawback which can be happened in real business environment and to contribute direction in future research considering another applicable methodology.

Development of Inner Pressure Measurement System for Hermetic Sealed Small Components (밀폐된 소형부품의 내부압력 측정장치 개발)

  • Hong, S.S.;Lim, I.T.;Lim, J.Y.
    • Journal of the Korean Vacuum Society
    • /
    • v.21 no.1
    • /
    • pp.1-5
    • /
    • 2012
  • The measurement device of internal pressures of small components sealed hermetically was developed. The internal pressure of a sample measured with this device was 43.151 kPa, and the expanded uncertainty ($\kappa$=2) was 741 Pa. The resultant measurement ability of internal pressures in small vacuum components, which had been almost impossible previously, shows the possibility of internal vacuum detection of hermetically sealed parts.

Calibration of micro-ohm shunt used for large current measurement (대전류 측정용 마이크로-옴 분류기의 교정에 관한 연구)

  • Kim, M.K.;Kim, I.K.;Jeong, J.Y.;Kim, I.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07c
    • /
    • pp.1862-1864
    • /
    • 2002
  • In this study, micro-ohm shunts with rated ac current of 2, 20, 80kA intended for use as an approved system for ac current measurement were calibrated according to IEC 60060. The scale factor and linearity were determined by comparison with the reference measuring system. Measurements of temperature rise due to the rated current was also investigated to analyze a temperature effect. One of the main goals was the determination of the measurement uncertainty of the shunt. The expanded uncertainty of the scale factor for the complete measuring system was satisfied with the STL(Short-circuit Testing Liaison) guide recognized tentatively.

  • PDF