A Study of Interactions Between Perpendicularly Spaced Tunnels (상하교차터널의 상호거동에 대한 연구)

  • Kim, Sang-Hwan;Lee, Hyung-Joo
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.5
    • /
    • pp.273-280
    • /
    • 2003
  • This paper describes a study of the effect of shield tunnel construction on the liners of nearby existing perpendicular tunnels. The research programme investigated the influence of tunnel proximity and alignment, liner stiffness on the nature of the interactions between closely spaced tunnels in clay. A total of two sets of carefully controlled 1g physical model tests, including the same test for repeatability, were performed. A cylindrical test tank was developed and used to produce clay samples of Speswhite kaolin. In each of the tests, three model tunnels were installed in order to conduct two interaction experiments in one clay sample. The tunnel liners were installed using a model tunnelling machine that was designed and developed to simulate the construction of a full scale shield tunnel. The first tunnel liner was instrumented to investigate its behaviour due to the installation of each of the new tunnels. The interaction mechanisms observed from the physical model tests are discussed and interpreted.

A simplified combined analytical method for evaluating the effect of deep surface excavations on the shield metro tunnels

  • Liu, Bo;Yu, Zhiwei;Han, Yanhui;Wang, Zhiliu;Yang, Shuo;Liu, Heng
    • Geomechanics and Engineering
    • /
    • v.23 no.5
    • /
    • pp.405-418
    • /
    • 2020
  • Deep excavation may have impact on the adjacent tunnels. It is obvious that the excavation will adversely affect and even damage the existing tunnels if the induced deformation exceeds the capacity of tunnel structures. It hence creates a high necessity to predict tunnel displacement induced by nearby excavation to ensure the safety of tunnel. In this paper, a simplified method to evaluate the heave of the underlying tunnel induced by adjacent excavation is presented and verified by field measurement results. In the proposed model, the tunnel is represented by a series of short beams connected by tensile springs, compressional springs and shear springs, so that the rotational effect and shearing effect of the joints between lining rings can be captured. The proposed method is compared with the previous modelling methods (e.g., Euler-Bernoulli beam, a series of short beams connected only by shear springs) based on a field measured longitudinal deformation of subway tunnels. Results of these case studies show a reasonable agreement between the predictions and observations.

Design and construction of the GK immersed tunnel of Busan-Geoje Fixed Link Project (국내 최장 GK 침매터널의 설계 및 시공)

  • Kim, Yong-Il;Kim, Woong-Ku;Kim, Je-Chun;Lee, Jung-Sang;Kim, Kyoung-O
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.71-76
    • /
    • 2009
  • The GK immersed tunnel as a part of Busan-Geoje Fixed Link Project, is the first attempt in Korea. In spite of existing of many difficulties in construction like the absent of construction cases in Korea, the connection work under approximately 50 m below sea level and weak ground condition, etc., now eight caissons were installed successfully on the accurate position and we are going to install upto the twelfth caisson in this year. The purpose of this paper is to introduce design and construction conditions of the GK immersed tunnel to advise the tunnel designers who will handle the similar project.

Mapping Submarine Bathymetry and Geological Structure Using the Lineament Analysis Method

  • Kwon, O-Il;Baek, Yong;Kim, Jinhwan
    • The Journal of Engineering Geology
    • /
    • v.24 no.4
    • /
    • pp.455-461
    • /
    • 2014
  • The Honam-Jeju, Korea-Japan, and Korea-China subsea tunnel construction projects have drawn significant attention since the early 2000s. These subsea tunnels are much deeper than most existing natural shallow sea tunnels linking coastal areas. Thus, the need for developing new technologies for the site selection and construction of deep subsea tunnels has recently emerged, with the launch of a research project titled "Development of Key Subsea Tunnelling Technology" in 2013. A component of this research, an analysis of deep subsea geological structure, is currently underway. A ground investigation, such as a borehole or geophysical investigation, is generally carried out for tunnel design. However, when investigating a potential site for a deep subsea tunnel, borehole drilling requires equipment at the scale of offshore oil drilling. The huge cost of such an undertaking has raised the urgent need for methods to indirectly assess the local geological structure as much as possible to limit the need for repeated borehole investigations. This study introduces an indirect approach for assessing the geological structure of the seafloor through a submarine bathymetry analysis. The ultimate goal here is to develop an automated approach to the analysis of submarine geological structures, which may prove useful in the selection of future deep subsea tunnel sites.

Improvement Efficiency of Tunnel Work using Site Surveying System (현장측량시스템을 이용한 터널공사의 효용성 향상)

  • Choi, Seok-Keun;Ahn, Won-Tae
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.31-37
    • /
    • 2006
  • The existing tunnel survey method contains many problems of taking much measuring time, increasing construction expenses, and delaying a term of construction. Therefore the site survey system for an improvement efficiency is developed. This system will be able to solve the ewer factor and the problem of curtailment of time and expenditure. In order to solve these problems it connected a measurement equipment and a notebook computer, and developed the system which simultaneously with tunnel measurement it will be able to decide locations and errors from site at real-time. The development or the tunnel survey system minimize the error occurrence as measuring tunnel, and the probability of more or less excavation. Therefore this site survey system leads to the effect of the improvement execution quality of work, the cost reduction and the construction term reduction.

  • PDF

Development of Expert System for Maintenance of Tunnel (II) (터널의 유지관리를 위한 전문가시스템 개발(II) : 수치해석을 통한 지식베이스 확장)

  • Kim, Do-Houn;Huh, Taik-Nyung;Lim, Yun-Mook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.2
    • /
    • pp.185-191
    • /
    • 2000
  • The safety problem of aged tunnels has been emphasized. For the effective maintenance, site inspection of tunnel structures and surrounding grounds are required periodically. Also, the determination of safety of tunnels is not a simple problem. So the role experienced engineer in the maintenance is very important and development of an expert system that can perform as the engineers, has been needed. In this study, from the results of numerical analysis in several case, new precision inspection rules which can substitute actual numerical analysis are determined by a commercial program FLAC and regression analysis under various parameters such as material property, lining thickness, overburden and laterial coefficients. They are added to the knowledge base to determine safety of tunnel lining. To verify the expert system, the results are compared with an existing tunnel diagnosis report. It can be concluded that the new rule are well represented the actual numerical analysis under various site conditions. Therefore it is expected that the systematic management for effective maintenance of tunnel structure will be possible.

  • PDF

An improved collapse analysis mechanism for the face stability of shield tunnel in layered soils

  • Chen, Guang-hui;Zou, Jin-feng;Qian, Ze-hang
    • Geomechanics and Engineering
    • /
    • v.17 no.1
    • /
    • pp.97-107
    • /
    • 2019
  • Based on the results of Han et al. (2016), in the failure zone ahead of the tunnel face it can be obviously identified that a shear failure band occurs in the lower part and a pressure arch happens at the upper part, which was often neglected in analyzing the face stability of shield tunnel. In order to better describe the collapse failure feature of the tunnel face, a new improved failure mechanism is proposed to evaluate the face stability of shield tunnel excavated in layered soils in the framework of limit analysis by using spatial discretization technique and linear interpolation method in this study. The developed failure mechanism is composed of two parts: i) the rotational failure mechanism denoting the shear failure band and ii) a uniformly distributed force denoting the pressure arch effect. Followed by the comparison between the results of critical face pressures provided by the developed model and those by the existing works, which indicates that the new developed failure mechanism provides comparatively reasonable results.

A Study on the Contents for Operation of Tunnel Management Systems Using a View Synthesis Technology (영상정합 기술을 활용한 터널관리시스템의 운영 효율성 제고를 위한 콘텐츠 연구)

  • Roh, Chang-gyun;Park, Bum-Jin;Kim, Jisoo
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.6
    • /
    • pp.507-515
    • /
    • 2016
  • In South Korea, there are a large number of tunnels because of the mountainous terrain, and to overcome this characteristics, lengths of tunnels are more longer than existing tunnels. The need to improvement current tunnel management contents is giving rise for accidents in tunnel section is continuously increased although lots of efforts to reduce the accidents. Conventionally, disaster prevention have been focused on the Tunnel Management Systems, tunnel operators generally tend to depend on CCTV images for most contents of detailed traffic flow managing. In this paper, investigation about current Tunnel Management Systems contents using IPA survey was conducted, and Priority Improvement Contents(Accident Situation Management Support, 2nd Accident Management Support, Traffic Flow Monitoring), which importance are high, but satisfaction are low, are deducted. Also, CCTV images, lack intuitive understanding, are judged as a main cause of low satisfaction of those contents. To overcome those limitations of the existing Tunnel Management Systems, this study sought to develop a technology for the synthesis of road images to derive traffic information from synthesis images, and the contents improvement stragegy is established. Tunnel operators-oriented satisfaction survey on new contents was carried out, and scored 4.2 on a 5-point scale. This has confirmed that the availability of new contents and at this stage, with pushing ahead of long-tunnels and undersea tunnels construction, politic applications are expected.

Investigation of soil behaviour due to excavation below the grouped pile according to shape of tunnel station (터널 정거장 형상에 따른 군말뚝 하부 굴착 시 지반거동 연구)

  • Kong, Suk-Min;Oh, Dong-Wook;Lee, Jong-Hyen;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.83-97
    • /
    • 2018
  • Tunnels are widely used for special purposes including roads, railways and culvert for power transmission, etc. Its cross-section shape is determined by uses, ground condition, environmental or economic factor. Many papers with respect to behaviours of adjacent ground and existing structure tunnelling-induced have been published by many researchers, but tunnel cross-section have rarely been considered. A collapse of tunnel causes vaster human and property damage than structures on the ground. Thus, it is very important to understand and analyse the relationship between behavoiurs of ground and cross-section type of tunnel. In this study, the behaviour of ground due to tunnel excavation for underground station below the grouped pile supported existing structure was analysed through laboratory model test using a trap-door device. Not only two cross-section types, 2-arch and box, as station for tunnel, but also, offset between tunnel and grouped pile centre (0.1B, 0.25B, 0.4B) are considered as variable of this study. In order to measure underground deformation tunnelling-induced, Close Range Photogrammetry technique was applied with laboratory model test, and results are compared to numerical analysis.

Reinforcement of shield tunnel diverged section with longitudinal member stiffness effect (종방향 부재의 강성효과를 고려한 쉴드 터널 분기부 보강 및 해석기법)

  • Lee, Gyu-Phil;Kim, Do
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.5
    • /
    • pp.675-687
    • /
    • 2019
  • In recent years, the needs for double deck-tunnels have increased in large cities due to the increase in traffic volume and high land compensation costs. In Korea, a network type tunnel which is smaller than general road tunnels and crosses another tunnel underground is planned. In the shield tunnel joints between the existing shield tunnel and the box-type enlargement section, a partial steel-concrete joint is proposed where the bending moment is large instead of the existing full-section steel joint. In order to analysis the enlargement section of the shield tunnel diverged section to reflect the three-dimensional effect, the two-dimensional analysis model is considered to consider the column effect and the stiffness effect of the longitudinal member. A two-dimensional analysis method is proposed to reflect the stiffness of the longitudinal member and the column effect of the longitudinal point by considering the rigidity of the longitudinal member as the elastic spring point of the connecting part in the lateral model. As a result of the analysis of the model using the longitudinal member, it was considered that the structural safety of the partial steel-concrete joint can be secured by reducing the bending moment of the joint and the box member by introducing the longitudinal member having the stiffness equal to or greater than a certain value.