• Title/Summary/Keyword: Execution Plan

Search Result 358, Processing Time 0.026 seconds

Case Study on Capstone Design Model for Computer Engineering (컴퓨터공학 분야의 캡스톤디자인 모델 사례 연구)

  • Kang, Hwan-Soo;Cho, Jin-Hyung;Kim, Hee-Chern
    • Journal of Digital Convergence
    • /
    • v.14 no.5
    • /
    • pp.57-66
    • /
    • 2016
  • In this paper, we describe capstone-related courses in the Computer information department of Dongyang-Mirae University and propose a capstone design model for computer engineering discipline based on operating experiences during the last year. Class schedules and contents, etc are presented from the case studies of two courses on system analysis and design and graduation work(capstone design) opened in 2015. Towards the successful operation of capstone design targeted to training practical and talented professionals with creative problem-solving skills, we propose six execution steps along with principal activities and outputs: Course plan, Project plan, Development, Reporting, Evaluation of students and coursework, and Course feedback. The capstone design model of this study is characterized by presenting the necessity and importance of pre and post steps such as 'Course Plan' and 'Course reflux' from a macroscopic view and by applying software engineering techniques such as prototyping, configuration managements, etc to it.

A Comparative Study on the Development Characteristic of Parks and Green Systems between Korea and Japan (한국과 일본 녹지체계의 발전 특성에 대한 연구)

  • Park Koo-Won
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.3 s.116
    • /
    • pp.59-78
    • /
    • 2006
  • Japan has been tried to integrate Western planning theories into its parks and green systems in the past. However this effect has been regarded unsuccessful. One of reasons for this is that the green systems have been treated as an urban facility, instead as systems. Another reason has to deal with greenbelt's stationary and reservation characteristics that make difficulty to respond timely to the rapid urbanization. The parks and green systems in Korea was introduced in 1990 and began to be promoted fully with the 'Parte and Green Master Plan' established in 2005. However, due to its short history, incomplete aspects exist in its philosophy and methods for promoting the system. Based on these experiences, the current green zone plans in Japan considers the green structure as an independent institution and amenity plan, not a tool of urban planning, that can be a medium for realization of urban visions. And main characteristics of this approach are 1) classifying the green structure into four categories in order to respond to urban forms and purposes, 2) pursuing confirmity with urban planning, and 3) executing the landscape plan based upon core green areas. From reviews upon experiences of Japan as well as considerations on demands and conditions of green systems in Korea, we proposed the following five new strategies for the construction of the urban parte and green system in Korea. They are 1) to develop urban parks and green systems into a genre of urban development improving the quality and local competitiveness of cities rather than a means of urban planning; 2) to form the integrated structure of urban green zones; 3) to transform the urban parte and green systems into practical systems as the centers of localities; 4) to raise criteria for planning and execution plans for effective implementations of the urban parte and green systems, and 5) to provide specific guidelines for the construction of urban parks and green systems through organizing research groups or specialists.

A Study on Developing Marine Technology(MT) Strategy and Its Implementation Plan (해양과학기술(MT)의 현안과 활성화 방안 연구)

  • Kang Gil-Mo;OH Wee-Yeong;Kwon Moon-Sang;Park Se-Hun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.12 no.1 s.24
    • /
    • pp.15-22
    • /
    • 2006
  • Marine Technology is the last hope of mankind for resolving predestined issues of food, resources, and environmental problems. facing and realizing this great challenge, domestic industrial, academic and research institutional experts participated in formulating the Marine Technology development plan, and the national science and technology committee chaired by the president passed this important plan thus setting the foundation for activating and promoting MT development. A project to develop Marine Technology Road Map(MTRM) has been carried out since June of 2005 for effective execution of the plan 1his paper reviewed current issues of MT and contents of MTRM, and proposed alternative measures for MT activation and promotion such as the establishment of special institutes for managing MT research and development and the fund raising for MT budget.

  • PDF

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System (소형조선소 맞춤형 생산공정 계획관리 시스템 개발 및 적용에 관한 연구)

  • Kim, Young-Hun;Hong, Min-Jong;Baek, Seung-Ju;Lee, Won-Seok;Jo, Yong-Hwa;Lee, Dae-Hyung;Lee, Hoon-Sick;Na, Sung-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.1
    • /
    • pp.79-86
    • /
    • 2022
  • In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.

A Study on the Establishment of Database for the Efficient Management of Unexecuted Urban Planning Facilities (미집행 도시계획시설의 효율적 관리를 위한 DB구축 방안에 관한 연구)

  • KIM, Kwang-Yeol;KIM, Shin-Hey;BAEK, Tae-Kyung
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.3
    • /
    • pp.1-11
    • /
    • 2020
  • The purpose of this study is to conduct an analysis for classification of unexecuted urban planning facilities using the Geographic Information System(GIS) to prepare measures for systematic and efficient management of unexecuted urban planning facilities and to find ways to establish national territory information for continuous management and operation by database of spatial data of classified unexecuted urban planning facilities. For this purpose, the present state of urban management plan, thematic map, cadastral map, satellite image of Korea Land Information System(KLIS) were collected from Miryang City, and qualitative analysis of the execution and non-execution of urban planning facilities was conducted by combining the layer of urban planning facilities, satellite images, and continuous cadastral layers of cadastral maps with classified and processed owner attribute information. According to the analysis, the unexecuted facilities were derived as unexecuted facilities, as most of the private land, without any current status roads or facilities created in satellite imagery. In addition, although the current status road was opened, the facilities that included some private land were derived as facilities that were recognized and executed by the local government as the de facto controlling entity through public transportation. The derived unexecuted urban planning facilities were divided into layers of shape data and the unexecuted property data were organized to quickly and accurately identify the status of non-executed and statistical information. In this study, we proposed an analysis plan that introduced GIS technology for scientific and rational analysis of unexecuted urban planning facilities and the establishment of reliable spatial data, and proposed a plan to establish a database for connection with existing systems and use of information.

Comprehensive Crisis Management System of Operational Continuity Management (운영연속성관리(OCM)관점에서 위기관리통합시스템 구축)

  • Kang, Heau-Jo
    • Journal of Advanced Navigation Technology
    • /
    • v.14 no.1
    • /
    • pp.127-133
    • /
    • 2010
  • The process for establishment of Operational Continuity Management Plan is organized repeatedly of Business Risk Assessment, Crisis Analysis, Business Impact Analysis, Establishing Business Recovery Strategies, Detailed Planning, Plan Execution, Test and Maintenance(Including Monitoring). Therefore, in this paper in response to global environmental change and the construction and operation of social security systems to maximize operational continuity management, crisis management and crisis management systems, building integrated systems for building technology in general and operational continuity management within an organization to understand developed to provide a framework for implementing operational continuity management in terms of crisis management has proposed to build an integrated system.

Deformation Measurement of Structures by Close - Range Photogrammetry - A Target for Tunnel Structures - (근거리사진측량에 의한 구조물 변형측정 -터널구조물을 대상으로-)

  • 김감래;김명배
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.15 no.1
    • /
    • pp.91-96
    • /
    • 1997
  • In order to ensure the safety of a structure, it is essential to put in practice all sorts of measurement from the plan and execution to the management by stages. These measurements make it possible to verify a propriety of a plan and forecast an accident or a collapse caused by long lapse of time, making use of accumulated data. Close-Range Photogrammetry is a method to meet improvement and development of surveting technique. which offered data for maintenance and management of a structure. Dus to applying this way. reliance on measuring a variation of structure. Besides, data of variation will be utilized for maintenance and management of a structure.

  • PDF

Performance Analysis of DiffServ Networks for Providing (QoS 제공을 위한 차등서비스 망 성능분석)

  • Lim, Seog-Ku
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.05a
    • /
    • pp.448-451
    • /
    • 2006
  • Currently the bolt joint defect occurs from the steel bridge which is in the process of using but that investigation about each kind defect is lacking state. Research to see consequently the high strength bolt joint sliding conduct bring the model it used a structural analysis program LUSAS numerical analysis execution and a plan for Steel Box Girder Bridge copying full-size H-Beam and plan pretensioned bolt force 100%. 75%, 50% and 25% pretensioned force it acted in standard. And a hold an examination, against the sliding loads which it follows in the pretensioned force it will analysis.

  • PDF

The Function and Task of Collective Dispute Mediation in the Framework Act on Consumer (소비자법 내에서의 소비자기본법상 집단분쟁조정제도의 역할과 과제)

  • Lee, Byung-Jun
    • Journal of Arbitration Studies
    • /
    • v.18 no.3
    • /
    • pp.139-163
    • /
    • 2008
  • The Collective Dispute Mediation was introduced to Korea with complement the Verbandsklage which was said to be poor at monetary compensation for consumers' damages. and The Collective Dispute Mediation also seems very likely to the class action, but one can resolve the dispute before filing a law suit under the Collective Dispute Mediation. The validity of the Collective Dispute Mediation is the same as the "settlement in court". After reaching the Collective Dispute Mediation, one may have a right to ask the compulsory execution. Under the Collective Dispute Mediation the damaged party must take part directly in the dispute, because the Collective Dispute Mediation is also included in the dispute resolution. Therefore a problem that how can the damaged consumer, who do not directly take part in the dispute process, get the remedy alternatively may arise. However, this problem is solved by Compensation Plan Letter which is described in the "Framework Act on Consumer". By the Compensation Plan Letter, the person who do not directly take part in the dispute process can be remedied ex post facto(Article 68). This thesis is study on The Function and Task of Collective Dispute Mediation in the Framework Act on Consumer in our state.

  • PDF

A Study on Evaluating the Family Life Education Program for Newly Married Couples - Focusing on Healthy Family Support Centers - (신혼기 부부교육 프로그램 운영실태에 관한 연구 - 건강가정지원센터 프로그램을 중심으로 -)

  • Kim, Sunjoo;Park, Jeongyun
    • Journal of Family Resource Management and Policy Review
    • /
    • v.17 no.3
    • /
    • pp.19-37
    • /
    • 2013
  • The purpose of this study was to provide the basic data required for the development and operation of high-quality education programs for newly married couples. The subjects were 60 education programs for newly married couples that were performed by 30 Healthy Family Support Centers in Seoul and the Gyeonggi area. The collected data were analyzed by applying appropriateness, efficiency, and effectiveness on the basis of program plan, execution, and evaluation. The results were as follows. First, the appropriateness of the program plans was no center that performed need survey. As for program advertisement, on-line, off-line, and person -to-person advertisements were used. Second, the education goals and contents were classified according to healthy family life, the essence of the marriage, gender equality, conflict management, problem prevention, relationship improvement, understanding of mutual similarities or differences, financial plan and management, and parenting. Each session lasted 2 hours, and the total number of program hours was 5 to 6 hours. The education methods were activities, lectures, and discussions.

  • PDF