• Title/Summary/Keyword: Execution Phase

Search Result 190, Processing Time 0.023 seconds

The study of a full cycle semi-automated business process re-engineering: A comprehensive framework

  • Lee, Sanghwa;Sutrisnowati, Riska A.;Won, Seokrae;Woo, Jong Seong;Bae, Hyerim
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.11
    • /
    • pp.103-109
    • /
    • 2018
  • This paper presents an idea and framework to automate a full cycle business process management and re-engineering by integrating traditional business process management systems, process mining, data mining, machine learning, and simulation. We build our framework on the cloud-based platform such that various data sources can be incorporated. We design our systems to be extensible so that not only beneficial for practitioners of BPM, but also for researchers. Our framework can be used as a test bed for researchers without the complication of system integration. The automation of redesigning phase and selecting a baseline process model for deployment are the two main contributions of this study. In the redesigning phase, we deal with both the analysis of the existing process model and what-if analysis on how to improve the process at the same time, Additionally, improving a business process can be applied in a case by case basis that needs a lot of trial and error and huge data. In selecting the baseline process model, we need to compare many probable routes of business execution and calculate the most efficient one in respect to production cost and execution time. We also discuss the challenges and limitation of the framework, including the systems adoptability, technical difficulties and human factors.

A study on the Improvement Direction of Design Phase Entry Criteria Review for Naval Surface Ships & Onboard Weapon Systems R&D Project (함정 및 함정탑재 무기체계 연구개발사업의 설계단계 진입조건 검토 개선 방향)

  • Kwang Yong Hwang;Dong Myung Seol;Bong Wan Choi
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.1
    • /
    • pp.79-90
    • /
    • 2023
  • In principle, R&D of general weapons systems are led by companies or government-funded organizations. In terms of project execution, the defense R&D planning system was reorganized to conduct SE-based project management by integrating the naval ship project execution procedure into the general weapon system R&D procedure. The development progress was confirmed according to the guide for SE application of DAPA, and a technical review meeting was proposed to enter into the each next phase in the R&D process. This paper focuses on improvement for technical review in terms of technical management based on system engineering for R&D mounted weapon systems and the naval surface ship project in preliminary design and detailed design. So, the improvement direction for reviewing the entry criteria for the R&D weapons systems of the naval ship and mounted weapons is proposed.

A Study for a load flow analysis algorithm in the three-phase distribution network (3상 배전계통에서의 부하조류해석 알고리즘에 관한 연구)

  • Ryu, Jae-Hong;Kim, Jae-Eon
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.150-152
    • /
    • 2000
  • This paper introduces an advanced three-phase load flow analysis algorithm in the radial distribution network. This method is an extension of the Novel method for solving radial distribution networks with the emphasis on expanding from single phase to three-phase. The proposed method involves only simple algebraic computation without any form of Jacobian matrix but has a desirable convergence characteristic. Computationally, The suggested technique is very efficient and requires less computer memory storage and maintains high execution speed. Also, the submitted process can be easily programmed and be simply extended to different types of load characteristics. A simulation results applied to the IEEE 34 bus radial distribution feeder are examined by using the MATLAB.

  • PDF

The Bayesian Approach of Software Optimal Release Time Based on Log Poisson Execution Time Model (포아송 실행시간 모형에 의존한 소프트웨어 최적방출시기에 대한 베이지안 접근 방법에 대한 연구)

  • Kim, Hee-Cheul;Shin, Hyun-Cheul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.7
    • /
    • pp.1-8
    • /
    • 2009
  • In this paper, make a study decision problem called an optimal release policies after testing a software system in development phase and transfer it to the user. The optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement is generally accepted. The Bayesian parametric inference of model using log Poisson execution time employ tool of Markov chain(Gibbs sampling and Metropolis algorithm). In a numerical example by T1 data was illustrated. make out estimating software optimal release time from the maximum likelihood estimation and Bayesian parametric estimation.

Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects (프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로)

  • Sullim Jung;Dae-Cheol Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

The Instantaneous Phase-Tracking in PLL using the DFT Algorithm (DFT 알고리즘을 이용한 PLL의 순시 추종)

  • Kim, Youn-Seo;Yang, Oh
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.45 no.6
    • /
    • pp.141-148
    • /
    • 2008
  • An utility voltage information, including the frequency, phase angle and amplitude is very important in many industrial systems. The grid-connected photovoltaic system in the limelight as alternative energy needs utility voltage information such as frequency, phase angle and magnitude to connect the grid-line. In this paper, it proposes the instantaneous phase-tracking in PLL that uses the frequency from the utility voltage as a sync signal and locks the phase with compensation for phase difference from DPT algorithm. It also proposes not only DFT algorithm execution by every sample not by one period, but also phase-tracking method in a wide range of frequency not a fixed one. This paper shows the feasibility and the usefulness of the proposed methods through the computer simulation and the experiment.

Holistic Scheduling Analysis of a CAN based Body Network System (CAN을 이용한 차체 네트웍 시스템에 대한 Holistic 스케줄링 해석)

  • 신민석;이우택;선우명호
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.10 no.5
    • /
    • pp.114-120
    • /
    • 2002
  • In a distributed real-time control system, it is essential to confirm the timing behavior of all tasks because these tasks of each real-time controller have to finish their processes within the specified time intervals called a deadline. In order to satisfy this objective, the timing analysis of a distributed real-time system such as shcedulability test must be performed during the system design phase. In this study, a simple application of CAN fur a vehicle body network system is formulated to apply to a holistic scheduling analysis, and the worst-case execution time (WCET) and the worst-case end-to-end response time (WCRT) are evaluated in the point of holistic system view.

A Study on the Revitalization of the Private Subsidy for Environmentally Friendly Aquaculture (친환경양식어업육성 민간보조사업의 활성화 방안)

  • Kim, Kuk-Ju
    • The Journal of Fisheries Business Administration
    • /
    • v.50 no.4
    • /
    • pp.45-57
    • /
    • 2019
  • Effective implementation of private subsidy projects requires comprehensive expertise in the aquaculture and construction sectors to be provided to private subsidy operators, local government officials and others involved in budget execution and settlement. Due to the strengthening of laws and systems related to the execution of state subsidies since 2015, the efficient implementation of private-sector grant projects has been difficult for delays in projects, cancellations, and conflicts with local governments from lack of prior awareness and understanding of related regulations. It is expected that the government will be able to activate the project by analyzing the current status and problems of each phase of project implementation for improving quality internalization of the project effects, as well as quantitative growth of the private sector subsidy project for environmentally friendly aquaculture development projects.

Value Co-creation Types according to Co-creation Execution Phase : Focusing on Regional Brand (Co-creation 실행 단계에 따른 Value Co-creation 유형 : 지역브랜드를 중심으로)

  • Ryou, An Young;Son, Won Jun
    • Journal of Korea Multimedia Society
    • /
    • v.24 no.3
    • /
    • pp.481-493
    • /
    • 2021
  • Regional brands are recognized for their importance as one of the local public relations policies, but only the methods promoted by local government officials and outside experts are revealing limitations in self-reliance and sustainability. In order for a regional brand to succeed, it is necessary to develop and manage a brand that fits the characteristics of the region together with various stakeholders including residents. In this study, it was confirmed that regional brand evaluation indicators may vary depending on the stage of co-creation in the design process for regional brand development, and the type of value co-creation was determined through a classification method using the results of the evaluation index. According to the results of the study, the type of value co-creation that fits the local situation and characteristics can be derived by adjusting the stage of co-creation execution in the design process.

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF