• Title/Summary/Keyword: Execution Phase

Search Result 191, Processing Time 0.024 seconds

An Assessment and Policy Implication of Information Technology Convergence Programs in Korean Public Service Area (공공부문 IT신기술 적용사업의 추진현황 평가와 정책적 시사점)

  • Kim, SungHyun
    • Journal of Information Technology Services
    • /
    • v.11 no.sup
    • /
    • pp.1-16
    • /
    • 2012
  • Information technology is a useful strategic weapon that can create competitive advantage and new business opportunity by applying it in the organization' value chain. IT convergence can be understood as an attempt of industrial level IT adoption to facilitate the innovation of the industry and the birth of a new industry. This study provides the comprehensive review of the Korean government' three IT assimilation programs, ubiquitous technology diffusion program of the Ministry of Knowledge Economy, u-service program of the Ministry of Public Administration and Security, and u-Defence cooperation program of the Department of Defense. The analysis is done through the interpretation of the existing literature and the logic model. The result proposes inter-agency cooperation and building of new technology road-map in the planning stage, flexible management in the execution phase, and failure tolerant evaluation system. The proposal for developing competencies and institutional foundations for IT convergence also presented.

A study on the Project Process Management System (PPMS) for the effective management of R&D projects (연구개발(R&D) 프로젝트의 효과적 관리를 위한 과정모형에 관한 연구)

  • 김홍범
    • Korean Management Science Review
    • /
    • v.12 no.3
    • /
    • pp.45-60
    • /
    • 1995
  • This study examines a normative model of project management systems, PPMS, to provide information for directing R&D activity in order to increase R&D productivity. The PPMS (Project Process Management System) is a disciplined and systematic framework to manage R&D projects effectively and efficiently under the assumption of a strategic decision making and long-range planning. The purpose of PPMS is to provide for the management of research organization at different levels an effective management tool; first, for the planning system which deals with rational selection and authorization of R&D projects, second, for the control system which concerns monitoring and controlling the execution of R&D projects, and finally, for the evaluation system which attains evaluation of the performance results of R&D projects and determination of the necessary follow-up. A view for the future development of project management within the context of a project-performing organization is also elaborated to exhibit the progress and phase description of the project management system.

  • PDF

Assessing the Impacts of Project Interfaces in Construction Works in Nigeria

  • Okebugwu, Onyinyechi Francesca;Omajeh, Enoch Oghene-Mairo
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.20-25
    • /
    • 2015
  • Interface management problems inherent in construction projects hamper their successful delivery. Therefore, this study aimed at determining the most important project interfaces in construction works in Nigeria in terms of most significant potential impacts, so that management attention are objectively focused on potential highest impacting project interfaces. From a review of literature, 28 project interfaces management issues were identified and categorized. Structured questionnaires were used to collect data concerning the impact (estimated losses to the project in terms of cost) and probability of occurrence of the identified interfaces. The interfaces were ranked using their computed Matrix Scores (MS). The results reveal that "project-workers interfaces problem manifested in use of inappropriate mixes" is the highest impacting. A ranking of the interface categories also reveal that the interfaces at the execution phase of a project (MS = 1226.79) are those that could result in the highest losses to the project.

A Comparative Study on the Operation Plan of LRT O&M between Domestic and Japanese (국내외 경전철 O&M 분야의 운영방안에 대한 비교연구)

  • Chung, Su-Young;Lee, Ki-Su;Cha, Goan-Bong;Shim, Sang-Jeom
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.158-163
    • /
    • 2006
  • The study of this study is to suggest the advanced vision of LRT O&M through comparing the domestic and japanese. Currently local government attract a private capital to construct the LRT competitively. It was investigated the O&M field participation of Light Rail Transit by the Seoul metro which operates Seoul subway 1,2,3,4 lines at this time. But, according to the restricted operation experiences in domestic, Japanese companies which operates a Light Rail Transit in Japan were analysed using several statistics. It were compared with operation plan of domestic execution design phase of representative 4 lines. The analysis gives us some points in common and suggestions that are very important and prerequisite for advancing seoul metro into LRT O&M business.

  • PDF

Efficient Implementation of SVM-Based Speech/Music Classification on Embedded Systems (SVM 기반 음성/음악 분류기의 효율적인 임베디드 시스템 구현)

  • Lim, Chung-Soo;Chang, Joon-Hyuk
    • The Journal of the Acoustical Society of Korea
    • /
    • v.30 no.8
    • /
    • pp.461-467
    • /
    • 2011
  • Accurate classification of input signals is the key prerequisite for variable bit-rate coding, which has been introduced in order to effectively utilize limited communication bandwidth. Especially, recent surge of multimedia services elevate the importance of speech/music classification. Among many speech/music classifier, the ones based on support vector machine (SVM) have a strong selling point, high classification accuracy, but their computational complexity and memory requirement hinder their way into actual implementations. Therefore, techniques that reduce the computational complexity and the memory requirement is inevitable, particularly for embedded systems. We first analyze implementation of an SVM-based classifier on embedded systems in terms of execution time and energy consumption, and then propose two techniques that alleviate the implementation requirements: One is a technique that removes support vectors that have insignificant contribution to the final classification, and the other is to skip processing some of input signals by virtue of strong correlations in speech/music frames. These are post-processing techniques that can work with any other optimization techniques applied during the training phase of SVM. With experiments, we validate the proposed algorithms from the perspectives of classification accuracy, execution time, and energy consumption.

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

A Study on Development of Model for Evaluating Service Quality on Food Service Industry - Focused on Fastfood Sector - (외식산업의 서비스품질 평가모형 개발에 관한 연구 - 패스트푸드 분야를 중심으로 -)

  • Choi, Yong-Jung;Jung, Sang-Yun;Kwon, In-Ho
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.2
    • /
    • pp.77-90
    • /
    • 2012
  • As the influence of service industry into domestic economy is increasing, it also has been influenced more powerfully at the domestic GDP(Gross Domestic Product) relative importance and employment relative importance continuously. By means of these reason, the Korean government announced the synthetic countermeasure for strengthening the competitive power of service industry in December, 2006. After then, it announced phase I of 'service industry advancing plan' which is concrete execution plan in April, 2008. Also, it is announced to announce phase II plans in september, 2008 and phase III plan in December, 2008 additionally. Service quality is the most powerful competitive means at service marketing and a key point for improving service productivity. The improvement of service quality has considerable influence on survival and profitability of service industry. Therefore, the study of objective service quality measurement in service industry is very important issue. The purpose of this study is to suggest a measurement model of service quality using fuzzy theory and AHP which measuring service quality objectively in subjective environment. It is expected that this study will help the improvement of competition power of service industry as well as establishment of effective decision-making.

  • PDF

A Development of Computational Thinking Education Model for Elementary Students (초등학생들을 위한 계산사고 교육 모델 개발)

  • Kim, Kapsu
    • Journal of The Korean Association of Information Education
    • /
    • v.17 no.1
    • /
    • pp.73-81
    • /
    • 2013
  • Elementary students are living in the information environment at daily. Also, they are learning the school curriculum lessons are based on information. Computational thinking that based on information from everyday life and the school curriculum is important. Until now, many educational materials for the computational thinking have been developed. But, teaching and learning method for computational thinking have not been developed. In the study, the teaching and learning model for computational thinking for elementary school students will be developed. Computational thinking education model proposed in this study consists of three phases. The first phase is the information gathering stage. The second phase is to perform calculations. The last phase is the decision-making steps. Effective teaching and learning methods that are proposed model in this study for computational thinking education will be used.

  • PDF

Analysis on Characteristic of Construction Cost for Steel Box Bridge (강박스교량 공사비 특성 분석)

  • Sun, Chang Won;Kyung, Kab Soo;Kang, Shin Hwa;Kwon, Soon Cheol
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.1
    • /
    • pp.1-14
    • /
    • 2009
  • Estimating appropriate construction cost at the design phase is judged with one important issue to the efficient security and the execution of budget. Therefore, in this paper, to build fundamental data of appropriate construction cost for steel box bridges, the existing calculated document such as the quantity, unit price document and detail items etc.. was analyzed and the basic specification of the bridges was investigated. Also, by estimating the relationship between predetermined cost and construction items on the bridges, the paper is intended to produce basic data for the calculation of appropriate construction cost in planning phase. From the result, it was calculated ratio of construction item in the total construction cost and unit cost. And then it was deduced effect factor of construction cost in steel box bridge.