• Title/Summary/Keyword: Excavation face

Search Result 254, Processing Time 0.024 seconds

A preliminary study for numerical and analytical evaluation of surface settlement due to EPB shield TBM excavation (토압식 쉴드 TBM 굴착에 따른 지반침하 거동 평가에 관한 해석적 기초연구)

  • An, Jun-Beom;Kang, Seok-Jun;Kim, Jung Joo;Kim, Kyoung Yul;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.3
    • /
    • pp.183-198
    • /
    • 2021
  • The EPB (Earth Pressure Balanced) shield TBM method restrains the ground deformation through continuous excavation and support. Still, the significant surface settlement occurs due to the ground conditions, tunnel dimensions, and construction conditions. Therefore, it is necessary to clarify the settlement behavior with its influence factors and evaluate the possible settlement during construction. In this study, the analytical model of surface settlement based on the influence factors and their mechanisms were proposed. Then, the parametric study for controllable factors during excavation was conducted by numerical method. Through the numerical analysis, the settlement behavior according to the construction conditions was quantitatively derived. Then, the qualitative trend according to the ground conditions was visualized by coupling the numerical results with the analytical model of settlement. Based on the results of this study, it is expected to contribute to the derivation of the settlement prediction algorithm for EPB shield TBM excavation.

A Study on the Safety Assessment Technique of a Tunnel Using Critical Stain Concept (한계변형률 개념을 활용한 터널 안정성 평가에 관한 연구)

  • Park, Si-Hyun;Shin, Yong-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.5
    • /
    • pp.29-41
    • /
    • 2007
  • An assesment technique for the quantitative evaluation of tunnel safety during tunnel excavation was newly proposed in this study using displacement measurements. First of all, field measurement guidelines used at tunnel construction sites in Korea and other countries were investigated. It was found out that the criteria of the guidelines were not clear and varied depending on the construction sites. The practical use of field measurement data for the evaluation of tunnel safety was very limited due to uncertainties of the guidelines related to the interpretation of measured data during the excavation. Critical strain concept is introduced in this study for the assesment of tunnel safety during the tunnel excavation. Moreover, the characteristics of tunnel displacements caused by the tunnel excavation were investigated in detail in order to investigate the practical application of the critical strain concept. The total tunnel displacements can be subdivided into three parts: displacements occurring ahead of tunnel face, displacements occurring prior to measurements, and displacements occurring after the installation of instruments. The characteristic of each portion of displacements is analysed in this study. Finally, a general method on the use of the displacement measurement data for the critical strain concept was suggested in the concrete manner, considering the field measurement practice in Korea.

Prediction of Geological Condition Ahead of Tunnel Face Using Hydraulic Drilling Data (유압 천공데이터를 이용한 터널 굴진면 전방 지질상태 예측)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Kim, Kwang-Sik;Yim, Sung-Bin;Seo, Kyoung-Won
    • The Journal of Engineering Geology
    • /
    • v.19 no.4
    • /
    • pp.483-492
    • /
    • 2009
  • During construction of a tunnel and underground structure, it is very important to acquire accurate information of the rock mass will be excavated. In this study, the drill monitoring method was applied for rapid prediction of geological condition ahead of the tunnel face. Mechanical data(speed, torque and feed pressure) from drilling process using a hydraulic drilling machine were analyzed to assess rock mass characteristics. Rock mass information acquired during excavation from drilling monitoring were compared with results from horizontal boring and tunnel seismic profiling(TSP). As the result, the drilling monitoring method is useful to assess rock mass condition such as geological structures and physical properties ahead of the tunnel face.

Perforation optimization of hydraulic fracturing of oil and gas well

  • Zhu, Hai Yan;Deng, Jin Gen;Chen, Zi Jian;An, Feng Chen;Liu, Shu Jie;Peng, Cheng Yong;Wen, Min;Dong, Guang
    • Geomechanics and Engineering
    • /
    • v.5 no.5
    • /
    • pp.463-483
    • /
    • 2013
  • Considering the influences of fluid penetration, casing, excavation processes of wellbore and perforation tunnels, the seepage-deformation finite element model of oil and gas well coupled with perforating technique is established using the tensile strength failure criterion, in which the user-defined subroutine is developed to investigate the dynamic evolvement of the reservoir porosity and permeability. The results show that the increases of perforation angle and decreases of perforation density lead to a higher fracture initiation pressure, while the changes of the perforation diameter and length have no evident influences on the fracture initiation pressure. As for initiation location for the fracture in wellbore, it is on the wellbore face while considering the presence of the casing. By contrast, the fractures firstly initiate on the root of the tunnels without considering casing. Besides, the initial fracture position is also related with the perforation angle. The fracture initiation position is located in the point far away from the wellbore face, when the perforation angle is around $30^{\circ}$; however, when the perforation angle is increased to $45^{\circ}$, a plane fracture is initiated from the wellbore face in the maximum horizontal stress direction; no fractures was found around perforation tunnels, when the angel is close to $90^{\circ}$. The results have been successfully applied in an oilfield, with the error of only 1.1% comparing the fracture initiation pressure simulated with the one from on-site experiment.

The Case Studies on Application of Mat Foundation System to Building Structure Founded on Weathered Ground (풍화대지반에 지지된 건축구조물의 전면기초 적용에 관한 사례 연구)

  • Choi, Yongkyu;Kim, Sungho;Lee, Minhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.6
    • /
    • pp.5-18
    • /
    • 2009
  • In construction of buildings in Korea, the buildings are frequently founded on the weathered ground (weathered soil/rock, fractured rock). In this case, to make a full use of a bearing capacity of a weathered ground for economic design, the shallow mat foundation system could be used. In this study, we have researched three cases of mat foundations on the weathered ground in Korea, and analyzed and considered the design procedures and the reinforcing methods. That is, we have considered the detail design, analysis proceedings, the ground settlement evaluation proceedings, the rock face mapping evaluations after excavation and reinforcing methods of the mat foundation on the weathered ground. And large scale plate load tests on the weathered ground supporting the mat foundation were performed and also load bearing capacity and settlement of actual mat foundation, considering the scale effect, were evaluated.

  • PDF

EPB tunneling in cohesionless soils: A study on Tabriz Metro settlements

  • Rezaei, Amir H.;Shirzehhagh, Mojtaba;Golpasand, Mohammad R. Baghban
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.153-165
    • /
    • 2019
  • A case study of monitoring and analysis of surface settlement induced by tunneling of Tabriz metro line 2 (TML2) is presented in this paper. The TML2 single tunnel has been excavated using earth pressure balanced TBM with a cutting-wheel diameter of 9.49 m since 2015. Presented measurements of surface settlements, were collected during the construction of western part of the project (between west depot and S02 station) where the tunnel was being excavated in sand and silt, below the water table and at an average axis depth of about 16 m. Settlement readings were back-analyzed using Gaussian formula, both in longitudinal and transversal directions, in order to estimate volume loss and settlement trough width factor. In addition to settlements, face support and tail grouting pressures were monitored, providing a comprehensive description of the EPB performance. Using the gap model, volume loss prediction was carried out. Also, COB empirical method for determination of the face pressure was employed in order to compare with field monitored data. Likewise, FE simulation was used in various sections employing the code Simulia ABAQUS, to investigate the efficiency of numerical modelling for the estimating of the tunneling induced-surface settlements under such a geotechnical condition. In this regard, the main aspects of a mechanized excavation were simulated. For the studied sections, numerical simulation is not capable of reproducing the high values of in-situ-measured surface settlements, applying Mohr-Coulomb constitutive law for soil. Based on results, for the mentioned case study, the range of estimated volume loss mostly varies from 0.2% to 0.7%, having an average value of 0.45%.

The Application of GPS (Global Positioning System) Technology into Geotechnical Information System with better Accuracy (지반정보시스템 정밀도 향상을 위한 GPS 기술의 국내 적용 사례 연구)

  • 김정한;황덕호;전해영;박성민;기창돈;장윤섭;윤서연;박형동
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.297-302
    • /
    • 2000
  • This paper reports the application of GPS (Global Positioning System) technique into the geotechnical information system. Typical example of such application can be the database of logging data. Other examples can be found from the surveying for road work, excavation work, landslide mapping and image processing of slope face. This paper also reports the enhancement method of the accuracy. The results from this study confirms that GPS could be a powerful tool for the future geotechnical investigation works in Korea.

  • PDF

Modes and Causes of Collapse of Subway Tunnels (도심지 지하철 터널의 붕괴유형과 원인)

  • 박광준;이인근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.41-48
    • /
    • 1993
  • The 2nd phase of Seoul Subway, Lines 5,6,7 and 8, is in progress. To reduce the surface traffic congestion during construction the greater part of the system has been engineered by bored tunnelling. The current tunnelling methodology is based on the New Austrian Tunnelling Method. Serveral collapses have been reported to date. Most of the collapses took place in the area forwed with soft ground. The modes and causes of the collapses were progressive failures in the unsupported surface and sliding failures due to the unfavourable joint direction. The major causes turned out to be the weakness of ground and the sudden influx of ground water from the surface. Some measures to prevent the failures are also presented. To ensure the safe tunnelling ghrough the soft ground the unsupported excavation area has to be minimized and closed as early as possible. Additional support measures such as supporting core, sealing shotcrete, forepoling, spread footing, face rock bolting and grouting should be employed as well depend on ground conditions.

  • PDF

A Case Study on Construction and Design of the Wedge Type Removable Soil Nailing System (쐐기형 제거식 쏘일 네일링 시스템의 설계 및 시공사례)

  • Han, Yeon-Jin;Park, Si-Sam;Kwon, Hyuk-Jun;Kim, Hong-Taek;Park, Ju-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.240-247
    • /
    • 2010
  • The soil nailing system is becoming common as reinforcement method of slope face in soil. It has application to obtain slope stability method and scaffolding system. It has some troubles when the soil nailing system is applied to the downtown because it could be invaded someone's private area. Thus, in this paper, wedge type removable soil nailing system which can easily remove deformed bar in final excavation step is developed. Field pull-out test is performed to evaluate deformed bars removal and pullout resistance characteristics. According to this result, application of Wedge Type Removable Soil Nailing System is performed.

  • PDF

Cases of Tunnel Monitoring of Anisotropic/Heterogeneous Rock Masses (이방성/비균질 암반의 터널 계측 사례 분석)

  • Kim, Chang-Yong;Hong, Sung-Wan;Kim, Kwang-Yeom;Baek, Seung-Han
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1299-1306
    • /
    • 2005
  • The introduction of geodetic methods of absolute displacement monitoring in tunnels has improved the value of the measurements significantly. By using this method, structurally controlled behavior and influences of an anisotropic rock mass can be determined and the excavation and support adjusted accordingly. In this study cases of tunnel monitoring in anisotropic/heterogeneous rock masses are analyzed, and various anisotrpic behavior of tunnel can be estimated. Because rock anisotropy and heterogeneity can have great influence on tunnel behavior, tunnel design considering rock anisotropy and heterogeneity is needed. Also under construction, feedback must be performed by using face mapping and monitoring to prevent over-deformation and tunnel collapse.

  • PDF