Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • 토지주택연구
    • /
    • 제11권4호
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

협동 제품개발 실습에서 참가자 기여도 평가를 위한 Product Data Analytics 기반 정량적 평가 시스템 적용 (Applying a Product Data Analytics-based Quantitative Contribution Evaluation System for Participants to Collaborative Projects in Product Development Practices)

  • 도남철
    • 공학교육연구
    • /
    • 제22권4호
    • /
    • pp.61-70
    • /
    • 2019
  • As product development process becomes complex, it becomes more important for engineering students to experience collaborative product development. Especially the collaboration experience based on Product Data Management (PDM) systems is useful, since participants are likely to use the same environment for their professional product development. However, instructors have difficulties to evaluate contribution of each participant to their projects during the practices, since it is hard to trace personal activities for collaborative design processes. To solve this problem, this study suggests a data-driven objective method that analyses product data accumulated in PDM databases to evaluate numerically calculated contributions of participants to their class projects. As a result, the quantitative measures provided by the data-driven analysis with qualitative measures for project results can improve the fairness and quality of evaluation of contributions of participants to collaborative projects. This study implemented the proposed evaluation method with an information system and discussed the result of the application of the system to product development practices.

공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구 (Development of the Construction Post-evaluation System in Public Construction Projects)

  • 옥현;양성훈
    • 한국산학기술학회논문지
    • /
    • 제15권12호
    • /
    • pp.7364-7371
    • /
    • 2014
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 건설공사를 계획하는 과정과 공사완료 후의 공사비, 공사기간, 수요, 효과 등에 대한 예측치와 실제치를 종합적으로 분석, 평가하여 시행의 효율성을 도모하는데 목적이 있다. 이를 통해 방만한 사업추진을 방지하고, 유사 건설공사의 품질 및 효율성 향상을 위한 자료로 활용하고 있다. 하지만, 건설공사 사후평가 자료를 유사 건설사업에 참조 및 활용하기 위해서는 건설공사 사후평가 결과정보에 대한 체계적인 관리가 필요하다. 따라서 본 연구는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 활용할 수 있도록 국토교통부에서 고시한 건설공사 사후평가 시행지침을 기초로 하여 건설공사 사후평가시스템을 구축하였다. 이를 통해 공공 건설사업의 수행 시 유사 건설사업의 수요 증감, B/C 비율 등 결과정보의 참조 활용을 통해 품질 향상 및 효율적인 사업 추진이 가능한 기반을 마련하였으며, 향후 사후평가 결과정보의 체계적인 관리를 통해 종합적인 분석 및 평가 등 유용한 도구로 활용될 수 있으리라 기대된다.

구조방정식모델을 이용한 자연재해예방사업의 사후 평가 지수 산정 (Estimation of Post Evaluation Index of Natural Disaster Prevention Projects using Structure Equation Modeling)

  • 허보영;송재우;윤세의;이승오
    • 대한토목학회논문집
    • /
    • 제34권6호
    • /
    • pp.1807-1814
    • /
    • 2014
  • 자연재해는 발생 자체를 막는데 한계가 있기 때문에 피해저감을 위해서는 예방사업을 통해 재해발생을 사전에 예방하는 것이 중요하다. 자연재해발생의 증가와 함께 자연재해와 관련된 예방사업에 대한 관심이 높아지고 있으며, 이와 관련된 투자도 증가하고 있다. 이와 함께 자연재해예방사업에 대한 투자 시, 그 파급효과 등을 검증할 수 있는 평가 역시 중요한 과제로 대두되고 있다. 자연재해예방사업과 같은 국가 공공투자사업을 평가하기 위해서 비용편익분석과 같은 정량적 분석을 통한 연구는 지속적으로 수행되고 있다. 정량적 분석방법만으로 사업의 효과를 충분히 설명하지 못한다는 문제점에도 불구하고 재해관련 분야에서 효과분석이나 평가를 위한 다양한 방법이 제시되지 못하고 있는 것이다. 본 연구에서는 정성적 분석을 통한 자연재해예방사업의 사후평가를 위해서 자연재해예방사업의 사후평가에 영향을 미치는 항목들을 도출하고, 구조방정식모델(SEM : structural equation modeling)을 통해 사후 평가항목과 사업효과 간 인과관계 분석 및 가중치를 산정하였다. 이를 바탕으로 자연재해예방 사업에 대한 사후평가지수 산정식을 제시하였다.

플랜트 프로젝트 일정위험 예외상황 예측 및 평가 (Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants)

  • 성홍석;정종윤;박철순
    • 산업경영시스템학회지
    • /
    • 제39권4호
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

도시재생 사례에 대한 공공디자인 특성 평가에 관한 연구 (A Study on the Evaluation of Public Design Characteristics in Urban Regeneration Cases)

  • 류혜지
    • 한국산업융합학회 논문집
    • /
    • 제27권1호
    • /
    • pp.47-55
    • /
    • 2024
  • The purpose of this study is to provide basic data on effective urban regeneration projects and development directions for improving the quality of life of local residents by analyzing urban regeneration projects that have been carried out so far according to evaluation items on public design characteristics. The research method was divided into literature review and case study. The research results are as follows. First, through analysis of previous research, seven evaluation items for public design characteristics were derived: publicness, accessibility, regional identity, aesthetics, communication, functionality, and sustainability. The research subjects were four urban regeneration project cases carried out across the country. Second, among the seven evaluation items for public design characteristics, publicness was all highly applied, but the other six items were applied differently in each case. Third, to increase sustainability, we must use eco-friendly materials and consider sustainable maintenance methods, functionality must be strengthened in terms of functionality and comfort of public facilities and public spaces, and communicability must be improved for local tourists. We actively look for ways to communicate with the public, accessibility involves incorporating more universal design, aesthetics focuses on adding beauty to spaces and facilities, and regional identity focuses on the unique and unique characteristics of each region. We suggest finding a theme and actively using it in urban regeneration projects. Lastly, for an urban regeneration project to be successful, it is necessary to effectively apply not only publicness but also accessibility, local identity, aesthetics, communication, functionality, and sustainability. In the future, public design characteristics should be more actively applied and considered in urban regeneration projects.

PMO 대가 산정모형의 개발 (A Study on the Development of PMO Cost Estimation Model)

  • 서용원;이덕희
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

Joint bibliometric analysis of patents and scholarly publications from cross-disciplinary projects: implications for development of evaluative metrics

  • Gautam, Pitambar;Kodama, Kota;Enomoto, Kengo
    • Journal of Contemporary Eastern Asia
    • /
    • 제13권1호
    • /
    • pp.19-37
    • /
    • 2014
  • In an attempt to develop comprehensive evidence-based methods for evaluation of the R&D performance of cross-disciplinary projects, a joint bibliometric analysis of patents and publications was performed for two industry-university-government collaborative projects aimed at commercialization: Hokkaido University Research & Business Park Project (2003-2007; 63 inventors; 176 patents; 853 papers), and Matching Program for Innovations in Future Drug Discovery and Medical Care - phase I (2006-2010; 46 inventors; 235 patents; 733 papers). Besides the simple output indicators (for five years period), and citations (from the publication date to the end of 2012), science maps based on the network analysis of words and co-authorship relations were generated to identify the prominent research themes and teams. Our joint analysis of publications and patents yields objective and mutually complementing information, which provides better insights on research and commercialization performance of the large-scale projects. Hence, such analysis has potential for use in the industry-university project's performance evaluation.

연구개발과제의 직후평가항목에 대한 인식도 조사: 기업부설 연구소를 대상으로 (Perceived fitness of the ex-post evaluation items of R&D projects: In the case of private R&D centers)

  • 이무신;손병호;엄기용;신원준;전현곤
    • 기술혁신연구
    • /
    • 제3권1호
    • /
    • pp.55-83
    • /
    • 1995
  • This paper addresses three central decision-making problems frequently encountered in developing evaluation checklists for ex-post evaluation of R&D projects at private R&D centers: 1) what kind of evaluation elements and factors should be included in the evaluation forms\ulcorner 2) how much weight should be assigned to each evaluation factor and element\ulcorner and 3) could the same evaluation elements and factors with weights be applied all the project type(research, development, and engineering)\ulcorner To answer these questions, we identified the evaluation elements/factors based on the review of relevant literature and measured the perceptions of researchers, R&D managers, and top managements of the three private R&D centers to get the information about the importance levels of the elements and the weights of the factors for each of the three project types. The findings include that 1) all the evaluation elements derived from the literature exhibited high importance levels, and 2) the importance levels of the elements and the weights of the factors were quite varied along the project types. Theoretical and practical implications of the findings for ex-post evaluation of R&D projects are discussed.

  • PDF

A Review of Stream Assessment Methodologies and Restoration: The Case of Virginia, USA

  • Bender, Shera M.;Ahn, Chang-Woo
    • Environmental Engineering Research
    • /
    • 제16권2호
    • /
    • pp.69-79
    • /
    • 2011
  • Rapid population growth and land use changes have severely degraded streams across the United States. In response, there has been a surge in the number of stream restoration projects, including stream restoration for mitigation purposes. Currently, most projects do not include evaluation and monitoring, which are critical in the success of stream restoration projects. The goal of this study is to review the current status of assessment methodologies and restoration approaches for streams in Virginia, with the aim of assisting the restoration community in making sound decisions. As part of the study, stream restoration projects data from a project in Fairfax County, Virginia was assessed. This review revealed that the stream assessment methodologies currently applied to restoration are visuallybased and do not include biological data collection and/or a method to incorporate watershed information. It was found from the case study that out of the twenty nine restoration projects that had occurred between 1995 and 2003 in Fairfax County, nineteen projects reported bank stabilization as a goal or the only goal, indicating an emphasis on a single physical component rather than on the overall ecological integrity of streams. It also turned out that only seven projects conducted any level of monitoring as part of the restoration, confirming the lack of evaluation and monitoring. However, Fairfax County has recently improved its stream restoration practices by developing and incorporating watershed management plans. This now provides one of the better cases that might be looked upon by stakeholders when planning future stream restoration projects.