• Title/Summary/Keyword: Evaluation of design projects

Search Result 283, Processing Time 0.021 seconds

A Study on the Application Characteristics of Environment-Friendly Design Guidelines at Outdoor Spaces in Apartment Complexes - Focused on Turn-Key Projects of Han River New Town Construction - (아파트단지 외부공간의 친환경적 설계지침 적용특성에 관한 연구 - 김포 한강 신도시 아파트 건설공사 턴키(turn-key) 안을 중심으로-)

  • Han, Su-Ae;Kim, Shin-Won
    • KIEAE Journal
    • /
    • v.11 no.5
    • /
    • pp.97-106
    • /
    • 2011
  • This study has been conducted focusing on the analysis of the turn-key proposal for Gimpo-Han River New City. The study expected that it would come up with design trends and introduction properties of each plan for the eco-friendly development of an apartment house. The concept of environment-friendly design was thought in four parts: 'Land use and transportation,' 'Ecological environment', 'Energy resource and environmental impact' and analysis factors of each part were chosen by specific items from the prospective researches and guidelines that already given on the projects. In conclusion, a proper development of the environmental-friendly apartment house will not be achieved unless the designers try to overcome their prejudice against eco-friendly planning elements applications. Along with the designers' attempt, it is also necessary to review the evaluation articles of the certification system for the existing environmental-friendly structures as well as to compensate and establish detailed evaluation standards. As the problems are being worked on, an integrated, effective evaluation standard for the eco-friendly planning elements will be determined. This way, an environmental-friendly residential development with a better quality will be eventually realized.

User Interface Design & Evaluation of Mobile Applications

  • Samrgandi, Najwa
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.1
    • /
    • pp.55-63
    • /
    • 2021
  • The design functionality put forward by mapping the interactiveness of information. The presentation of such information with the user interface model indicates that the guidelines, concepts, and workflows form the deliverables and milestones for achieving a visualized design, therefore forming the right trend is significant to ensure compliance in terms of changing consideration and applying evaluation in the early stages. It is evidenced that prototype design is guided by improvement specifications, includes modes, and variables that increase improvements. The study presents five user interface testing methods. The testing methods are heuristic evaluation, perspective-based user interface testing, cognitive walkthrough, pluralistic walkthrough, and formal usability inspection. It appears that the five testing methods can be combined and matched to produce reasonable results. At last, the study presents different mobile application designs for student projects besides the evaluation of mobile application designs to consider the user needs and usability.

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.

Application and evaluation of design projects: A case study in a mechanics of materials course (디자인 프로젝트의 적용과 평가: 재료역학 수업의 사례연구)

  • Kim Ju-Hu
    • Journal of Engineering Education Research
    • /
    • v.6 no.1
    • /
    • pp.15-21
    • /
    • 2003
  • This paper reports the results of course restructuring employing design projects in an introductory mechanics of materials course at Pennsylvania State University. Unlike traditional lecture courses, students were encouraged to learn the rudiments of mechanical design and how materials standards, economics, manufacturing, environmental, legal (liability) and societal (safety) concerns relate to design. Through conducting collaborative design projects, the instructors helped students to acquire more advanced skills such as team-based decision making, integration and establishment of criteria, use of modern design theory, consideration of alternative solutions, and application of realistic constraints. In order to examine the impact of new course changes on students' learning, a survey was conducted in 1998 Fall semester. According to the results of survey analyses, students reported high values on this introductory mechanics of materials course. However, they did not give high values on the design projects. Rather, they preferred lecture sessions. Additionally, it was also found that students who earned higher grades from a prerequisite course(statics) showed lower values on the design projects. Implications for engineering educators and suggestions for future research studies were discussed.

An Establishment of Guideline and Evaluation Items for Before-and-After Study in Railroad Construction Projects (철도건설공사 사후평가 항목 및 지침 수립방안)

  • Kim, Yeon Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.315-322
    • /
    • 2011
  • The Korea government set a Act called as Before and After Study for a huge SOC projects in order to check their feasibility again at the time of design, construction and completion period. However, the evaluation items and analysis method are so vague that its effectiveness has been challenged. Especially railroad projects need to be evaluated differently by railroad construction types and rolling stocks. This paper suggests the evaluation items as a common items and exclusive items on the type of construction and rolling stocks. Also data collection in the standardized form and GIS techniques and are introduced to analyze evaluation items effectively.

Systematization of Evaluation Indicators for Integrated Safety Performance Verification of Buildings in the Early Design Stage (초기설계단계에서 건축물 통합 안전성능 검증을 위한 평가요소 체계화에 관한 연구)

  • Seo, Ji-Hyo;Choo, Seung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.3
    • /
    • pp.53-60
    • /
    • 2018
  • When planning buildings, safety should be considered as a priority over any other performance. The study aims to derive and systematize elements that can be reflected in the design stage, which affects the safety of construction workers and building users. The elements for safety of workers are classified by type of work, and the elements for safety of users are classified by fields. Elements that are difficult to be reflected in design stage or those whose effects are insignificant are excluded. In addition, application scenarios have been proposed for each element so that the elements created in this study can be directly applied and utilized in practice. This will contribute to lowering the accident rate of construction projects by evaluating the harmful risks of construction projects at the design stage.

An Analysis of the Urban Regeneration Priority Regions Project Using Quantitative Evaluation Indicators - In Case study of Cheonan Priority Regions - (정량적 평가지표를 활용한 도시재생 선도지역 사업효과 분석 - 천안시 선도지역을 사례로 -)

  • Lyu, Shin-Hyun;Lim, Nam-Gi
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.10
    • /
    • pp.83-90
    • /
    • 2019
  • The purpose of the present study is to confirm, through quantitative indices, changes arising with the implementation of urban regeneration projects, with a specific focus on the case of Dongnam-gu, Cheonan, one of the 13 priority rgions in urban regeneration. By utilizing quantitative data including resident population, floating population, revenue, number of small business persons, number of startup companies, and number of licensed buildings, the study confirmed changes in Dongnam-gu and other urban regeneration areas. The study compared monitoring results and implemented project policies to confirm changes within the area as a result of project implementation. Additionally, resident perception toward business districts was surveyed to confirm changes in perception and opinion, and monitoring indices were used to confirm changes as a result of project implementation. Accordingly, the study presented a plan to carry out the assessment of urban regeneration projects, which can be employed as data for conducting future urban regeneration projects. Urban regeneration projects are carried out for the long-term. Therefore, based on monitoring and investigative data, they require constant policy suggestions and periodic monitoring in accordance with changes resulting from project implementation. With regards to the effective range of urban regeneration projects, the study confirmed the possibility of an effect not only in the area of project implementation but also in surrounding areas. However, because the study merely confirms changes in Dongnam-gu, Cheonan, additional research is necessary to ascertain assessment plans suitable to the different types and regional characteristics of urban regeneration projects.

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

ABET Assessment of a Mechanical Engineering Program through Senior Capstone Design Courses at University of the Pacific

  • Lee, Chi-Wook;Watson, Kyle;Weick, Brian
    • Journal of Engineering Education Research
    • /
    • v.13 no.3
    • /
    • pp.18-33
    • /
    • 2010
  • This paper describes two capstone senior design courses for the Mechanical Engineering program at University of the Pacific. The first course taught in the Fall semester is entitled "Engineering Design/Senior Project I." The second course taught in the Spring semester is entitled "Engineering Design/Senior Project II." All Mechanical Engineering students with senior standing are required to take these two classes in this sequence. At the end of every Spring semester, industrial advisors are invited to assess the final senior projects during an annual Senior Project Day. This assessment is performed using the Program Outcomes and Program Educational Objectives established for Pacific's Mechanical Engineering program. Since all Mechanical Engineering students are required to complete senior projects, this is a 100% evaluation process. After the evaluations are done, the data sets are compiled and reviewed by the faculty for assessment purposes. It is important to note that the industrial advisors perform the evaluations, but the faculty members assess the information to determine if modifications need to be made to the program or courses. In addition to the senior project evaluations, general feedback from Mechanical Engineering Industrial Advisory Committee (MEIAC) members is also useful for the outcomes-based assessment process in addition to the definition and evaluation of Program Outcomes and Program Educational Objectives.

  • PDF

The Residents' Perceptions on the Revitalization Project of Rural Centers Utilizing IPA - The Case of Janggye-myeon of Jangsu-gun - (IPA를 활용한 농촌중심지 활성화 사업에 대한 거주민 인식 - 장수군 장계면을 중심으로 -)

  • Kim, Young-Jin;Son, Yong-hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.3
    • /
    • pp.133-145
    • /
    • 2017
  • The purpose of this study is to assess residents' perception of the revitalization projects of the rural center and to evaluate their views of the projects' importance and their levels of satisfaction with how they have been carried out. In this study, we measured the residents' perceptions and preferences regarding these projects by using Importance-Performance Analysis (IPA). Results showed that residents' perceptions and satisfaction were the highest for the projects providing welfare facilities, even though this project has little relevance to the overall project goal. Residents were dissatisfied with construction projects such as the building of cultural facilities and urban parks, even while recognizing their importance. It is necessary to establish what problem the people perceive and to manage them appropriately. Next, the residents did not appreciate the community empowerment projects, nor did they evaluate the contents of the program positively. It can therefore be seen that the community empowerment projects have not been carried out well. Finally, the street landscape improvement project was not successfully implemented compared to other projects. The residents have negatively perceived the installation of facilities that they do not want, rarely use, or are poorly operated. this shows that the evaluation of residents is significant. They become the users of the revitalization project for the rural center. It is necessary to overcome problems such as project items chosen by professionals without local consultation and obvious design in the revitalization project of the local center. There is a need to ascertain the residents' opinion of each project and to encourage them to participate directly in the management operation.