• 제목/요약/키워드: Evaluation Schedule

검색결과 268건 처리시간 0.03초

수술수가의 적정성에 관한 연구 - 상대가격체계와 항목분류를 중심으로 - (A Study on the Propriety of the Medical Insurance Fee Schedule of Surgical Operations - In Regard to the Relative Price System and the Classification of the Price Unit of Insurance Fee Schedule -)

  • 오진주
    • 한국보건간호학회지
    • /
    • 제2권2호
    • /
    • pp.21-44
    • /
    • 1988
  • In Korea, fee-for service reimbursement has been adopted from the begining of medical insurance system in 1977, and the importance of the relative value unit is currently being investigated. The purpose of this study was to find out the level of propriety of the difference in the fees for different surgical services, and the appropriateness of the classification of the insurance fee schedule. For the purpose of this study, specific subjects and the procedural methodology is shown as follows: 1. The propriety of the Relative Price System(RPS). 1) Choice of sample operations. In this study, sample operations were selected and classified by specialists in general surgery, and the number of items they classified were 32. For the same group of operations the Insurance Fee Schedule(IFS) classified the operations into 24 separate items. In order to investigate the propriety of the RPS, one of the purpose of this study, was to examine the 24 items classified by the IFS. 2) Evaluation of the complexity of surgery. The data used in this study was collected The data used in this study was collected from 94 specialists in general surgery by mail survey from November I to 15, 1986. Several independent variables (age, location, number of bed, university hospital, whether the medical institution adopt residents or not) were also investigated for analysis of the characteristics of surgical complexity. 3) Complexity and time calculations. Time data was collected from the records of the Seoul National University' Hospital, and the cost per operation was calculated through cost finding methods. 4) Analysis of the propriety of the Relative Price System of the Insurance Fee Schedule. The Relative Price System of the sample operation was regressed on the cost, time, comlexity relative ,value system (RVS) separately. The coefficient of determination indicates the degree of variation in the RPS of the Insurance Fee Schedule explained by the cost, time, complexity RVS separately. 2. The appropriateness of the classification of the Insurance Fee Schedule. 1) Choice of sample operations. The items which differed between the classification of the specialist and the classification of medical, Insurance Fee Schedule were chosen. 2) Comparisons of cost, time and complexity between the items were done to evaluate which classification was more appropriate. The findings of the study can be summarized as follows: 1. The coefficient of determination of the regression of the RPS on-cost RVS was 0.58, on time RVS was 0.65, and on complexity RVS was 0.72. This means that the RPS of Insurance Fee Schedule is improper with respect to the cost, time, complexity separately. Thus this indicates that RPS must be re-shaped according to the standard element. In this study, the correlation coefficients of cost, time, complexity Relative Value System were very high, and this suggests that RPS could be reshaped I according to anyone standard element. Considering of measurement, time was thought to be the most I appropriate. 2. The classifications of specialist and of the Insurance Fee Schedule were compared with respect to cost, time, and complexity separately. For complexity, ANOVA was done and the others were compared to the different values of different classifications. The result was that the classification of specialist was more reasonable and that the classification of Insurance Fee Schedule grouped inappropriately several into one price unit.

  • PDF

층간분리 방지를 위한 인발공정 패스설계 (Pass Design of Drawing Process to Prevent Delamination)

  • 이상곤;고대철;김병민
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2008년도 추계학술대회 논문집
    • /
    • pp.46-49
    • /
    • 2008
  • Drawing process of the high carbon steel wire with high speed is usually performed at room temperature using multi pass. Tn the multi pass drawing, temperature rise affects the mechanical properties of the final product. The excessive temperature rise during the deformation promotes the occurrence of delamination, and deteriorates the torsion property and durability of wire. This paper investigates the occurrence of delamination in the wire through the torsion test and the evaluation of wire temperature. The excessive wire temperature ieads to the occurrence of delamination. Based on the calculation of the wire temperature, a new pass schedule, that can prevent the delamination due to the excessive wire temperature rise, is designed through the isothermal pass schedule.

  • PDF

EVALUATING THE FEASIBILITY OF THE HIGHWAY ENGINEERING SCHEDULE USING SIMULATION TECHNIQUE

  • Liu Weijun;Yuan Jianbo;Zhang Jianren
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.897-901
    • /
    • 2005
  • In the highway engineering, the performance, quantity and status of machines available for the project have direct impact on the project time. For instance, the status of machines, such as working or in trouble, have great influence on the activity execution. Therefore, while scheduling the project, the project manager always increases the spare machines or prolong the activity time to avoid delaying the project time when some of the machines are in trouble in construction site. However, how many are the spare machines and how long are the prolonged activity time, which are estimated subjectively by the manager. This subjective estimation has been criticized for systematically overestimating or underestimating quantity of the machines and the activity time. In the paper, we propose and prototype a model to simulate the status of the machines in construction site, and then to evaluate the schedule feasibility considering the performance, quantity and statues of the machines involved.

  • PDF

R & D 프로젝트의 위험분석모형의 연구 (A Risk Analysis Model Using VERT for R & D Project Management)

  • 황홍석
    • 한국경영과학회지
    • /
    • 제20권1호
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

The Scheduling of Real-Time tasks using Performance Evaluation through fuzzy-random in Real-Time Systems

  • Cho, H-G;Kim, H-B
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.487-487
    • /
    • 2000
  • The scheduling of real-time tasks needs both correctness and timeliness. But it is not easy to schedule real-time tasks having different characteristics in a single system. In this paper we solve the problem through an approach using the performance evaluation of real-time tasks through fuzzy-random variables. Using the performance evaluation through fuzzy-random variable, we can achieve flexible and efficient scheduling for real-time systems.

  • PDF

철도수송계획의 수익성 평가체계 (Profitability Evaluation System for Railway Transportation Plan)

  • 김동희;홍순흠
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2004년도 춘계공동학술대회 논문집
    • /
    • pp.211-214
    • /
    • 2004
  • In railway system, the transportation plan corresponds to master plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the operation company, and includes several sub-planning activities such as train operation frequency plan, train (schedule) plan, train capacity assignment plan, and rolling stock requirement plan. In this paper, we present profitability evaluation system for current transportation plan. The proposed system can be used for evaluating profitability by estimating train service revenue considering customer demands.

  • PDF

SW 공학수준과 SW 프로젝트 납기성과와의 관계 (Evaluation on the Relationship between Software Engineering Level and Schedule Deviation in Software Development)

  • 김승권;고병선
    • 한국IT서비스학회지
    • /
    • 제10권4호
    • /
    • pp.191-204
    • /
    • 2011
  • Recently, many software companies are trying to improve the software quality and project outcome with more costs and efforts in development time. In the software convergence and integration environments, it is required efforts to gain high quality of software. In other words, it is required to utilize software engineering knowledge and technology for higher software quality and better software project productivity. The Software development productivity can be varied by software process capability according to building a framework for software development, selection and use of appropriate technology, human resource management. Software process capability will influence software project outcome which is the general opinion. This study provides empirical evidence about software engineering efforts and investment approach to lead software project performance. We measured the software engineering efforts by SW engineering level and analyzed the corelation between software engineering level and schedule deviation. And, we verified that this performance is affected by the size of software company. As a result, software process capability is important to build a infrastructure and develop systematically software project. The higher software engineering level can lead to improved software project performance.

외식사업 신규창업을 위한 사업계획서 작성방법 사례와 투자경제성 분석에 관한 연구 (Case Studies on Preparing a Business Plan for the Foundation of Food Service Business and Analysis of Investing Economy.)

  • 홍기운
    • 한국조리학회지
    • /
    • 제3권
    • /
    • pp.385-421
    • /
    • 1997
  • This study was performed as placing stress on business plan preparation and investing economy analysis centered to cases upon presenting the premises of study for new foundation of food service business. The summarized results are as follows: 1. In the aspect of carrying out process of practical project, establishing the promotion strategy, the facility project program, the menu program, the facility and furniture program, organization & manning schedule, the business operation schedule, review of all laws & provisions and the allout promotion schedule in order were deployed. 2. Analysis of investing economy for review of profitability 1) In case of investment, excluding 600million for the real setate lease among the total investment of 1billion, it was required by 161, 235, 000 for interior project, 161, 110, 000 for facility & equipment, 19, 235, 000 for fittings, 27, 600, 000 for menu plate & uniform, 27, 600, 000 for furniture, 13, 800, 000 for sign article. 2) In case of loss & profit presumed the annual turnover is to be 1, 115, 856, 000 the contigent profit(before tax) is to be 148, 966, 000 which is 13.3% in comparson to the sales amount and the net profit(after tax) for this term s to be 104, 276, 000 which is 9.3% against the sales and the profitable ratio to the equity investment( 500 million) is 20.9% and it satisfies 20% of the premises of study. 3) In case of the payback period will be approximately two(2) years which indicated within three(3) years that is standard of new project evaluation term of ordinary enterprise. 4) In case of internal rate of return it will be 21.5% which is favorable profitability as taking into account of 15% that is standard of new project evaluation by ordinary enterprise based on general downtown money interest. That the investing value of Happy Day profitability is hinted as it is sufficient enough as the case under this study based upon such results and considered that securing supremacy is competitive power in case of commitment will be possible.

  • PDF

Proposition and Evaluation of Parallelism-Independent Scheduling Algorithms for DAGs of Tasks with Non-Uniform Execution Time

  • Kirilka Nikolova;Atusi Maeda;Sowa, Masa-Hiro
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2000년도 ITC-CSCC -1
    • /
    • pp.289-293
    • /
    • 2000
  • We propose two new algorithms for parallelism-independent scheduling. The machine code generated from the compiler using these algorithms in its scheduling phase is parallelism-independent code, executable in minimum time regardless of the number of the processors in the parallel computer. Our new algorithms have the following phases: finding the minimum number of processors on which the program can be executed in minimal time, scheduling by an heuristic algorithm for this predefined number of processors, and serialization of the parallel schedule according to the earliest start time of the tasks. At run time tasks are taken from the serialized schedule and assigned to the processor which allows the earliest start time of the task. The order of the tasks decided at compile time is not changed at run time regardless of the number of the available processors which means there is no out-of-order issue and execution. The scheduling is done predominantly at compile time and dynamic scheduling is minimized and diminished to allocation of the tasks to the processors. We evaluate the proposed algorithms by comparing them in terms of schedule length to the CP/MISF algorithm. For performance evaluation we use both randomly generated DAGs (directed acyclic graphs) and DACs representing real applications. From practical point of view, the algorithms we propose can be successfully used for scheduling programs for in-order superscalar processors and shared memory multiprocessor systems. Superscalar processors with any number of functional units can execute the parallelism-independent code in minimum time without necessity for dynamic scheduling and out-of-order issue hardware. This means that the use of our algorithms will lead to reducing the complexity of the hardware of the processors and the run-time overhead related to the dynamic scheduling.

  • PDF