• 제목/요약/키워드: Estimating Work Time

검색결과 120건 처리시간 0.026초

ROBUST ESTIMATION USING QUASI-SCORE ESTIMATING FUNCTIONS FOR NONLINEAR TIME SERIES MODELS

  • Cha, Kyung-Yup;Kim, Sah-Myeong;Lee, Sung-Duck
    • Journal of the Korean Statistical Society
    • /
    • 제32권4호
    • /
    • pp.385-399
    • /
    • 2003
  • We first introduce the quasi-score estimating function and applied the quasi-score estimating function to nonlinear time series models. We proposed the M quasi-score estimating functions bounded functions for the quasi-score estimating functions. Also, we investigated the asymptotic properties of quasi-likelihood estimators and M quasi-likelihood estimators. Simulation results show that the M quasi-likelihood estimators work better than the least squares estimators under the heavy-tailed distributions

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.

  • PDF

A New Algorithm for Automated Modeling of Seasonal Time Series Using Box-Jenkins Techniques

  • Song, Qiang;Esogbue, Augustine O.
    • Industrial Engineering and Management Systems
    • /
    • 제7권1호
    • /
    • pp.9-22
    • /
    • 2008
  • As an extension of a previous work by the authors (Song and Esogbue, 2006), a new algorithm for automated modeling of nonstationary seasonal time series is presented in this paper. Issues relative to the methodology for building automatically seasonal time series models and periodic time series models are addressed. This is achieved by inspecting the trend, estimating the seasonality, determining the orders of the model, and estimating the parameters. As in our previous work, the major instruments used in the model identification process are correlograms of the modeling errors while the least square method is used for parameter estimation. We provide numerical illustrations of the performance of the new algorithms with respect to building both seasonal time series and periodic time series models. Additionally, we consider forecasting and exercise the models on some sample time series problems found in the literature as well as real life problems drawn from the retail industry. In each instance, the models are built automatically avoiding the necessity of any human intervention.

우리나라 부부의 가계에 대한 경제적 기여도 평가를 위한 총노동시간 및 노동분담률 분석 (Total Labor Tune and The Ratio of Labor Division for Estimating of Economic Contribution to Household on Korean Married Couples)

  • 윤소영
    • 대한가정학회지
    • /
    • 제40권8호
    • /
    • pp.23-36
    • /
    • 2002
  • The purpose of this study is to analyze the actual condition of labor during the marriage by estimating the total labor-time of husband and wife and to prove the contribution of labor-time to household. The statistical life-time research data of Bureau of Statistics were used to prove the overwork of wives compared with husbands during the marriage. The result of the study can help to prove the wife's contribution of labor-time to household.

이동식 임목파쇄기 시공능력 산정 개선방안 (The Estimating Method of Construction Workable-quantity per Unit Time for Tub Grinder)

  • 안방률;태용호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.169-171
    • /
    • 2012
  • Although work-efficiency of construction machinery is a critical factor for estimating its workable-quantity per unit time, the coefficient figure table presented in the Poom-Sam that is used for Construction Cost Estimation of public sectors in Korea is very subjective for practical usage. In order to suggest objective work-coefficient table for a Tub Grinder, domestic and overseas documentary records were investigated and on-going construction sites were also visited. The research found that the table can be revised by means of detailing down by several factors. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

  • PDF

수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로 (Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target)

  • 박홍태;이양규
    • 한국재난정보학회 논문집
    • /
    • 제8권4호
    • /
    • pp.328-335
    • /
    • 2012
  • 건설공사의 표준품셈에 의한 자원기반 적산방식은 정부고시 노임단가와 기자재의 공시가 격에 표준적이고 보편적인 공법 및 공종에 대한 단위작업당 재료량, 노무량, 장비사용시간 등을 수치로 표시한 품을 곱하여 견적하였다. 그러나 자원기반 적산방식은 실제 거래가격을 적절히 반영하지 못하는 한계점이 발생하였다. 따라서 본 연구는 이러한 한계점을 극복하기 위하여 새로운 시도로 수로터널 현장을 대상으로 Cutter 점검/교환, TBM 정비, TBM 점검/급유, 후속설비, 광차, 운영교대, 갱내보강/낙반보강, 안전/회의의 작업 공종 별로 TBM 굴진 생산성을 분석하고, 이를 근거로 순굴진속도를 분석하여 실적 공사비를 분석하였다. 본 연구에서 제시하는 실적공사비 산정 접근법은 TBM 수로터널 현장에서 실적 공사비를 예측하는데 유용한 도구로 활용할 수 있을 것으로 확신한다.

가사노동의 경제적 가치평가에 관한 연구 (Estimates of the Economic Value of Houshold Work by Fulltime Home Makers)

  • 김선희
    • 대한가정학회지
    • /
    • 제28권2호
    • /
    • pp.73-89
    • /
    • 1990
  • The aim of the present study is to estimates the economic value of household work done by fulltime home makers, using alternative methods of valuation household work in Pusan Korea. Eight findings, five different methods -Self Estimation by Home Makers, Reservation Wage, Opportunity Cost, Individual function Cost, Replacement Cost(Visiting Housekeeper, Housekeeper, General Managemet, Housekeeper & General Management)- are tried for the estimation of economic value of household work. The results of this study can be outlined as follows : 1) The economic value of household work varies substantially by the methods of estimating. The averages are : 2) The economic value of household work varies with the level of education, ages, the number of children, the stage of FLC in all method of estimation, and the level of income in self estimation by home makers, Reservation wage. Specially, FLC revealed good explanation variable in method of estimation as input household work time. 3) The gap between two-day survey and three-day survey in household work time questionaire didn't so much.

  • PDF

가사노동 가치인정을 위한 정책적 과제 (The Matter of Policy for Estimating the Household Work)

  • 정영금
    • 가정과삶의질연구
    • /
    • 제14권3호
    • /
    • pp.21-32
    • /
    • 1996
  • The purpose of this study is to suggest the solutions for policy related to estimating the household work to be set up. In this study the damages to housewife are compared in the viewpoints of the insurance company and the victim. And this study criticizes the unfairness in judging wife's contribution to matrimonial property in case of divorce. So for the future studies decisions to the concept of housewife the survey method for time-use data and the substitute wage are needed. And for setting up the policy continuous and objective discussion about the matter interest of the parties concerned and consensus of public opinion and the reform of image about the family nd household work are needed.

  • PDF

공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구 (A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects)

  • 유용환;이규현;김종원;최인성
    • 한국건축시공학회지
    • /
    • 제4권4호
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Kim, Yukyong
    • 한국소프트웨어감정평가학회 논문지
    • /
    • 제16권1호
    • /
    • pp.21-26
    • /
    • 2020
  • The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.