• Title/Summary/Keyword: Estimating

Search Result 9,601, Processing Time 0.034 seconds

Study on validating proper System Requirements by using Cost Estimations Methodology (비용추정방법을 활용한 시스템요구사항 적정성 확인방안 연구)

  • Choi, Sung Kyu;Choi, Eun Ha
    • Convergence Security Journal
    • /
    • v.13 no.5
    • /
    • pp.97-105
    • /
    • 2013
  • It is very important the government project should be supported by enough budget for proceeding. The insufficient budget by poor budget estimating uesd to bring about discontinuing for the project. This is originally caused by inaccuracy for cost estimating about system and evaluating for system requirements on the projet initial phase. The system requirements is technical requirements that converted the user needs and is needs for communicating between stakeholder and developer and manufacturer. Also the system requirements is the primary factor to make the project cost. The cost estimating is not easy due to complication of cost factors and an aberration between cost estimating and actual cost. Specially, on the project initial phase, shortage of detail information for project make more difficult to do cost estimating. This study proposes the architecture for validating proper system requirements by using cost estimations methodology on the project initial phase and shows the computer tool for simulating the proposed architecture.

A Study on the Investigation into Obstacles in Construction Budget Estimating (건설기업 실행예산 편성업무의 애로요인 분석에 관한 연구)

  • Koo, Kyo Youn;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.81-89
    • /
    • 2016
  • Under the circumstances where the profitability has become a more critical issue for general contractors, the objective of the study is to identify and discuss obstacles and their key characteristics in the construction budget estimating. Through the questionnaire survey and interviews with experienced estimators of general contractors, the study identified 18 obstacles by 6 groups. It discussed that although various obstacles exist, there are key obstacles to which general contractors should pay attention for the realistic construction budget estimating. In particular, improving subcontractors' estimating competency and incubating estimating experts are identified as the key issues to overcome obstacles in the construction budget estimating.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

A Method for Estimating a Distance Using the Stereo Zoom Lens Module (양안 줌렌즈를 이용한 물체의 거리추정)

  • Hwang, Eun-Seop;Kim, Nam;Kwon, Ki-Chul
    • Korean Journal of Optics and Photonics
    • /
    • v.17 no.6
    • /
    • pp.537-543
    • /
    • 2006
  • A method of estimating the distance using single zoom camera limits a distance range(only optical axis) in field of view. So, in this paper, we propose a method of estimating the distance information in Stereoscopic display using the stereo zoom lens module for estimating the distance in the wide range. The binocular stereo zoom lens system is composed using a horizontal moving camera module. The left and right images are acquired in polarized stereo monitor for getting the conversion and estimating a distance. The error distance is under 10mm which has difference between optically a traced distance and an estimated distance in left and right range $(0mm{\sim}500mm)$ at center. This presents the system using a function of the zoom and conversion has more precise distance information than that of conversion control. Also, a method of estimating a distance from horizontal moving camera is more precise value than that from toe-in camera by comparing the error distance of the two camera methods.

Size Estimation of Concrete Structures Using the Impact Echo Method

  • Hong, Seong-Uk;Yoon, Sang-Ki;Lee, Yong-Taeg;Kim, Seung-Hun
    • Architectural research
    • /
    • v.22 no.1
    • /
    • pp.23-31
    • /
    • 2020
  • This study aims to verify a method for accurately estimating the sizes of the column, slab, and beam members of concrete structures using the impact echo method, which is a nondestructive testing method. The concrete specimens are designed and fabricated with six single-layer frame specimens composed of columns, slabs, and beam members based on three strengths of 24, 30, and 40 MPa. To estimate the sizes of the members according to the member types of concrete structures, the experiment was performed using the impact echo method. As a result of estimating the sizes of the concrete column members using the impact echo method, the error rate is 2.9%. As a result of estimating the depth of the concrete beam members, the error rate is 9.7%. And, as a result of estimating the thickness of the concrete slab members, the error rate is 2.4%. These results confirmed that quality control of the members of concrete structures is possible by estimating their sizes using a non-destructive testing method.

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

INFLUENCE ANALYSIS FOR GENERALIZED ESTIMATING EQUATIONS

  • Jung Kang-Mo
    • Journal of the Korean Statistical Society
    • /
    • v.35 no.2
    • /
    • pp.213-224
    • /
    • 2006
  • We investigate the influence of subjects or observations on regression coefficients of generalized estimating equations using the influence function and the derivative influence measures. The influence function for regression coefficients is derived and its sample versions are used for influence analysis. The derivative influence measures under certain perturbation schemes are derived. It can be seen that the influence function method and the derivative influence measures yield the same influence information. An illustrative example in longitudinal data analysis is given and we compare the results provided by the influence function method and the derivative influence measures.

A Method for Estimating the Distance Using the Stereo Zoom Lens Module (양안 줌 렌즈 모듈을 이용한 깊이 추정 방법)

  • Hwang, Eun-Seop;Lee, Seung-U;Gwon, Gi-Cheol;Gil, Sang-Geun;Kim, Nam
    • Proceedings of the Optical Society of Korea Conference
    • /
    • 2007.02a
    • /
    • pp.125-126
    • /
    • 2007
  • This paper discussed a method for estimating the distance using the stereo zoom lens module. A method for estimating the distance using single zoom lens is limited in convergence angle. So, we composed horizontal moving camera and estimated the distance. In the experiment, we get the wider convergence angle and more precise distance than single camera's.

  • PDF

A Note on Bootstrapping M-estimators in TAR Models

  • Kim, Sahmyeong
    • Communications for Statistical Applications and Methods
    • /
    • v.7 no.3
    • /
    • pp.837-843
    • /
    • 2000
  • Kreiss and Franke(192) and Allen and Datta(1999) proposed bootstrapping the M-estimators in ARMA models. In this paper, we introduce the robust estimating function and investigate the bootstrap approximations of the M-estimators which are solutions of the estimating equations in TAR models. A number of simulation results are presented to estimate the sampling distribution of the M-estimators, and asymptotic validity of the bootstrap for the M-estimators is established.

  • PDF

Estimating the Queue Length Distribution of ATM multiplexer using Threshold Bootstrap

  • 김윤배
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.62-62
    • /
    • 1999
  • In this paper, we propose a new technique of estimating tail of steady-state queue length distribution; Pr(Q>q), fo ATM multiplexer. Pr(Q>q) is a fundamental measure of network congestion. Assessing Pr(Q>q) properly is crucial for design and control of ATM networks. Data traffic pattern of high-speed networks is highly correlated and bursty. Estimating Pr(Q>q) is very difficult because of correlation and burstiness. We estimate entropy(rate-function) using large deviation principles and threshold bootstrap. Simulation studies are conducted to compare the performance of an existing method and our new method.

  • PDF