A Study on the Investigation into Obstacles in Construction Budget Estimating  

Koo, Kyo Youn (Department of Architecture, Graduate School, Sejong University)
Kim, Han Soo (Department of Architecture, Sejong University)
Publication Information
Korean Journal of Construction Engineering and Management / v.17, no.3, 2016 , pp. 81-89 More about this Journal
Abstract
Under the circumstances where the profitability has become a more critical issue for general contractors, the objective of the study is to identify and discuss obstacles and their key characteristics in the construction budget estimating. Through the questionnaire survey and interviews with experienced estimators of general contractors, the study identified 18 obstacles by 6 groups. It discussed that although various obstacles exist, there are key obstacles to which general contractors should pay attention for the realistic construction budget estimating. In particular, improving subcontractors' estimating competency and incubating estimating experts are identified as the key issues to overcome obstacles in the construction budget estimating.
Keywords
Construction Budget Estimating; Obstacles; AHP Analysis; Cost Management;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Lai, Y. Y., Wang, W. C., and Wang, H. H. (2007). "AHP-and simulation-based budget determination procedure for public construction projects." Automaition in Construction, Elsevier, 17(5), pp. 623-632.
2 Lee, M. H. (2010). "A Study to Establish Measures to Manage costs through an Analysis of Factors that Affect a construction projects of a Construction Work." MS Thesis, Daegu University, Daegu.
3 Leung, M. Y., Skitmore, M., and Chan, Y. S. (2007). "Subjective and objective stress in construction cost estimation." Construction Management and Economics, Tayler & Francis Group, 25(10), pp. 1063-1075.   DOI
4 Momon, A. H., Abdul Rahman, I., Abdullah, M., and Azis, A. (2010). "Factors Affection Construction cost in Mara Large Construction Project: Perspective of Project management consultant." International Journal of Sustainable Construction Engineering and Technology, UTHM, 1(2), pp. 42-54.
5 Moon, J. Y., Jung, Y. S., and Kim, Y. S. (2000). "Factor s for Improving Construction Cost Control on Job Sites." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 137, pp. 77-83.
6 Park, S. W. (2013). "A study on problems and improvement of project financing : focused on PFV (project financing vehicle).", MS Thesis, Chung-Ang University, Seoul.
7 Seo, J. S. (2009). "A study on the Estimate System for cost control of construction industry.", MS Thesis, Hanbat University, Seoul.
8 Shin, C. K. and Lee, S. (2008). "A Rational Maintenance of Cut Slopes Analytic Hierarchy Process." A doctora l Thesis, University of Seoul, Seoul.
9 Yeon, G. H. (2003). "A Study on Job Site of Cost Management and Effective Method for Construction Indestry." Journal of the Korean Association of Tax and Accounting, KATA, 12 pp. 117-144.
10 Yoon, G. C., and Kim. H. S. (2003). "Systematization of Core Knowledge for Construction Project Budget." MS Thesis, Sejong University, Seoul.
11 An, S. H., Suk, S. J. and Lee, M. H. (2011). "Weighting of Key Factors Influencing the Cost Budgeting in Building Construction Projects." Journal of the Architectural Institute of Korea Sturcture & Construction, AIK, 27(5) pp. 119-126.
12 Ahn, Y. K. (2014). "Cost Overrun 142%", Kyeonggiilbo, (April. 19, 2015).
13 Golden. B., and Wasil, E. A (2003). "Celebrating 25 years of AHP based decision making." Computers & Operations Research, Pergamon, 30(10), pp. 1419-1420.   DOI
14 Choi, B. J., Park, J. M., Kwak, J. M., Choi, S. W., and Kim O. K. (2009). "Patterns and Trends in Cost Control Practice of Korean Ceneral Contractors." Proceedings of KICEM Annual Conference, KICEM, 9, pp. 231-236.
15 Choi, E. J., (2015). "Last year, the construction industry growth, reduced profitability, stability improvements." The Journal of Construction & Economy Reserch Institude of Korea, CERIK, pp. 33-34.
16 Choi, M. S., and Kim, Y. D., (2013). "A Study on the Analysis and Strategies for Enhancing the Lowest Bidding." The Focuse of Construction Issue, CERIK, pp. 4-6.
17 Joe, G. T. (2003). Decision Making for Leaders, DongHyun Publisher, 1st ed. Seoul, pp. 50-75.
18 Jung, Y. S. and Joo, M. H. (2011). "Patterns and Trends in Cost Control Practice of Korean General Contractors." Korean Journal of Construction Engineering and management, KICEM, 12(4), pp. 79-87.   DOI
19 Kang, M. S. (2010). "A Study of Developing Criteria for Evaluating Rural Tourism Village leader's Managerial Abilities." MS Thesis, Sejong University, Seoul.
20 Kim, D. H., and Kim, H. .S. (2011). "Identification of Core Competencies." Korean Journal of Construction Engineering and management, KICEM, 121(6), pp. 93-100.
21 Kim, J H., and Kim, H. S. (2013). "A Study on the Investigation into Obstacles in Overseas CM Projects." Korean Journal of Construction Engineering and management, KICEM, 14(5), pp. 113-121.   DOI