• Title/Summary/Keyword: Estimated Cost

Search Result 1,865, Processing Time 0.025 seconds

The Development on the Estimate method for the Cost-Effect Analysis of the Electrical Safety Management (전기안전 업무의 비용효과 분석을 위한 전기화재 손실비용 추정방법 개발)

  • Yoo, Jae-Geun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.349-352
    • /
    • 2015
  • This paper estimates electrical fire damage cost-effect to analyze electrical safety efficiency by applying a cost-benefit analysis method for analyzing the efficiency of a business public interest. Electrical fire loss statistics data was presented as direct costs and casualties, including deaths due to an electrical fire, this paper adds overhead "Incidental Cost of Accidents to the Employer" by W. H. Heinrich was applied to estimate the cost of economic loss. Also wounded, including the loss of human deaths by referring to the car accident insurance claims costs and human development estimated the losses caused by an electrical fire. And to perform a cost-benefit analysis of the electrical safety as a result of future work. In this paper, the economic effect of the electric field of safety and public interest work to systematically presented.

Methods and Applications to estimate the Conversion Factor of Resource-based Relative Value Scale for Nurse-Midwife's Delivery Service in the National Health Insurance (조산원(助産院)의 분만간호서비스에 대한 건강보험수가 산출방법과 적용방안)

  • Kim, Jin-Hyun;Jung, Yoo-Mi
    • Journal of Korean Academy of Nursing
    • /
    • v.39 no.4
    • /
    • pp.574-583
    • /
    • 2009
  • Purpose: This paper analyzed alternative methods of calculating the conversion factor for nurse-midwife's delivery services in the national health insurance and estimated the optimal reimbursement level for the services. Methods: A cost accounting model and Sustainable Growth Rate (SGR) model were developed to estimate the conversion factor of Resource-Based Relative Value Scale (RBRVS) for nurse-midwife's services, depending on the scope of revenue considered in financial analysis. The data and sources from the government and the financial statements from nurse-midwife clinics were used in analysis. Results: The cost accounting model and SGR model showed a 17.6-37.9% increase and 19.0-23.6% increase, respectively, in nurse-midwife fee for delivery services in the national health insurance. The SGR model measured an overall trend of medical expenditures rather than an individual financial status of nurse-midwife clinics, and the cost analysis properly estimated the level of reimbursement for nurse-midwife's services. Conclusion: Normal vaginal delivery in nurse-midwife clinics is considered cost-effective in terms of insurance financing. Upon a declining share of health expenditures on midwife clinics, designing a reimbursement strategy for midwife's services could be an opportunity as well as a challenge when it comes to efficient resource allocation.

Estimating the Benefit-Cost Ratios by Applying Life-Expectancies of National Pension Old-Age Pensioners (국민연금 노령연금 수급자의 기대여명과 이를 적용한 수익비 산출)

  • Choi, Jang Hoon
    • The Korean Journal of Applied Statistics
    • /
    • v.28 no.4
    • /
    • pp.621-641
    • /
    • 2015
  • Benefit-cost ratios are estimated using life-expectancies of the national pension old-age pensioners in Korea and a compared to whole nation. To obtain the ratios, future mortalities are estimated by multiplying the ratios of experienced mortalities for old-age pensioners to those of the whole nation and the future mortalities of the whole nation projected on an expanded CBD model. The results indicate that the life expectancies of old-age pensioners are longer than the whole nation that lead to higher benefit-cost ratios for old-age pensioners.

Life Cycle Cost Estimation for Jangbogo-II Submarines based on Modeling and Simulation Methodologies (M&S기법을 활용한 장보고 II급 잠수함 수명주기비용 추정)

  • Ahn, Jae-Kyoung;Choi, Bong-Wan;Lee, Yong-Kyu
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.221-228
    • /
    • 2010
  • With the development of science and technology, modern submarines are equipped with high technology devices and multi-functioned precise armaments, consequently, acquisition cost as well as maintenance cost of the submarines are getting higher and higher. However, tight defense budget forces navy to significantly reduce military operating and maintenance costs. In this study, the maintenance and operating costs of submarine Jangbogo-II are estimated through M&S (Modeling and simulation) methodologies in order to reasonably and consistently work out the requirement verification system of Jangbogo-II. The maintenance and operating costs of Jangbogo-II along the next 25 years are estimated as 312.65 billion won via engineering analysis methods while 312.69 billion won from PRICE Model, which shows only 0.04 billion won differences as a whole. This study is expected to be able to provide meaningful decision making data for not only short and/or mid term operating planning but military budgeting.

Preliminary cost estimation for large-scale nuclear hydrogen production based on SI process (초고온가스원자로 열원 SI 공정을 이용한 원자력수소생산시스템 비용 예비 분석)

  • Yang, Kyoung-Jin;Choi, Jae-Hyuk;Lee, Ki-Young;Lee, Tae-Hoon;Lee, Kyoung-Woo;Kim, Mann-Eung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.723-726
    • /
    • 2009
  • As a preliminary study of cost estimates for nuclear hydrogen systems, the hydrogen production costs of the nuclear energy sources benchmarking GT-MHR are estimated in the necessary input data on a Korean specific basis. G4-ECONS developed by EMWG of GIF in 2008 was appropriately modified to calculate the cost for hydrogen production of SI process with VHTR as a thermal energy source rather than the LUEC. The estimated costs presented in this paper show that hydrogen production by the VHTR could be competitive with current techniques of hydrogen production from fossil fuels if $CO_2$ capture and sequestration is required. Nuclear production of hydrogen would allow large-scale production of hydrogen at economic prices while avoiding the release of $CO_2$. Nuclear production of hydrogen could thus become the enabling technology for the hydrogen economy. The major factors that would affect the cost of hydrogen were also discussed.

  • PDF

INTEGRATED SOCIETAL RISK ASSESSMENT FRAMEWORK FOR NUCLEAR POWER AND RENEWABLE ENERGY SOURCES

  • LEE, SANG HUN;KANG, HYUN GOOK
    • Nuclear Engineering and Technology
    • /
    • v.47 no.4
    • /
    • pp.461-471
    • /
    • 2015
  • Recently, the estimation of the social cost of energy sources has been emphasized as various novel energy options become feasible in addition to conventional ones. In particular, the social cost of introducing measures to protect power-distribution systems from power-source instability and the cost of accident-risk response for various power sources must be investigated. To account for these risk factors, an integrated societal risk assessment framework, based on power-uncertainty analysis and accident-consequence analysis, is proposed. In this study, we applied the proposed framework to nuclear power plants, solar photovoltaic systems, and wind-turbine generators. The required capacity of gas-turbine power plants to be used as backup power facilities to compensate for fluctuations in the power output from the main power source was estimated based on the performance indicators of each power source. The average individual health risk per terawatt-hours (TWh) of electricity produced by each power source was quantitatively estimated by assessing accident frequency and the consequences of specific accident scenarios based on the probabilistic risk assessment methodology. This study is expected to provide insight into integrated societal risk analysis, and can be used to estimate the social cost of various power sources.

A Complex Sampling Design for the Estimation of Korean Livestock Production Cost (축산물생산비조사를 위한 복합표본설계)

  • Kim, Soo-Taek;Kim, Young-Won
    • The Korean Journal of Applied Statistics
    • /
    • v.21 no.4
    • /
    • pp.675-694
    • /
    • 2008
  • We propose a new sampling design for the Korean Livestock Production Cost Survey. In this sampling design, the survey population is derived from the 2005’s agricultural census of Korea. And coefficient of variation(CV) is estimated from the current livestock production cost survey data, and the estimated CV’s are used to find the optimal sample size which satisfies the predetermined precision of estimation. In order to save the enumeration cost, the agriculture enumeration districts are used as a primary sampling unit(psu). Final sample is selected by double sampling. Also, we propose the estimator which is able to reflect the change of the population of livestock production households.

Estimating Consumer Surplus for Recreational Sea Fishing using Individual Travel Cost Method (개별여행비용법을 이용한 바다 유어 낚시의 소비자 잉여추정)

  • Pyo, Hee-Dong;Park, Cheol-Hyung;Chung, Jin-Ho
    • Ocean and Polar Research
    • /
    • v.30 no.2
    • /
    • pp.141-148
    • /
    • 2008
  • This paper aims at estimating consumer surplus for recreational sea fishing in Tongyeong coastal area using individual travel cost method. A Poisson model (PM), a negative binomial model (NBM), a truncated Poisson model (TPM), and a truncated negative binomial model (TNBM) are applied for individual travel cost method in order to account characteristics of count data (non-negative discrete data.) The survey was conducted for 462 inshore anglers using personal interview method in Tongyeong during July and October 2007. Respondents were asked about how often they do fishing, travel costs, catch, income, and so on. Because of over-dispersion problem in PM and TPM, NBM and TNBM were considered to be more appropriate statistically. All parameters estimated are statistically significant and theoretically valid. As the results based on TNBM, consumer surplus per trip was estimated to be 183,486 won, total consumer surplus per person and per year 3,399,658 won, and the marginal effect of consumer surplus on % changes in catch rate is 185,372 won.

Does Paid Sick Leave Induce Welfare Burden?

  • Namhoon KIM
    • Asian Journal of Business Environment
    • /
    • v.14 no.2
    • /
    • pp.11-18
    • /
    • 2024
  • Purpose: The purpose of this study is to empirically evaluate the unintended welfare losses induced by paid sick leave, examine the severity of the unintended moral hazard loss caused by paid sick leave, and evaluate how much moral hazard cost society can accept to obtain paid sick leave benefits. Research Design, Data and Methodology: We examine the Medical Expenditure Panel Survey data collected in 2013 and 2014 by employing a panel probit analysis to control for individual heterogeneity. Results: The estimation result shows that the probability of absence due to paid sick leave increases from 4.91% to 7.84%. Among them, excluding the probability of increasing absence from 1.29% to 2.69% due to the actual disease, the probability of absence due to the moral hazard was estimated to be 2.41% to 6.49% in the proposed models. Based on the result, if we evaluate the increase in absence caused by moral hazard as a social cost, the estimated cost is approximately $174 to $297 per worker per year. Conclusion: Considering these expected costs, our society can obtain the access benefit from paid sick leave if we are willing to accept the moral hazard cost.

Environmental Cost and Benefit Analysis Pollutant Reduction Facilities of the using the Emergy (Emergy를 이용한 오염물질 저감시설의 환경 비용/편익 분석)

  • Kim, Jin Lee;Hwang, Ha-Sun;Kim, Sang-Soo;Lee, Jae Kwan
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.5
    • /
    • pp.591-597
    • /
    • 2013
  • The input emergy of an advanced treatment plant for reducing the 1 kg of TN and TP was estimated 4.14E+14 sej/kg, 5.02E+15 sej/kg, respectively. In addition, the input emergy of constructed wetland for reduction of the 1 kg of TN and TP reduction was estimated to be 2.48E+14 sej/kg, 3.38E+15 sej/kg, respectively. The cost reducing 1 kg of TN and TP for an advanced treatment plant was estimated 197,466 won and 2,388,739 won respectively and constructed wetland was estimated 117,976 won and 1,609,213 won respectively. As a result, All of the emergy source of constructed wetland for reducing non-point source is renewable resource. If we use the constructed wetland, it results in enhancing economic value by reducing of non-point pollution, controlling a flood and providing the habitat of animals or plants. Improving water quality program in the Nakdong River Basin should be changed into an ecological treatment facilities from expansion of the sewage treatment facilities and advanced treatment plant using high cost and non-renewable energies.