• Title/Summary/Keyword: Estimated Construction Cost

Search Result 307, Processing Time 0.023 seconds

Estimation method of Overhead Costs for Historical Costs Estimation System of the Electrical Construction Works in Korea (국내 전기공사 분야 실적공사비 적산제도 도입시 간접공사경비의 산정방안)

  • Sohn, H.K.;Lee, H.K.;Park, M.Y.;Park, I.P.;Kwon, Y.M.;Seo, S.S.;Kim, K.G.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2004.05b
    • /
    • pp.148-151
    • /
    • 2004
  • When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system fur building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is supposed to reasonable estimation methods of overhead costs and profits.

  • PDF

Role of Quantity Surveyor and Activities of reeled Associations in Historical Construction Costs Estimation System of Foreign Countries (외국의 실적공사비 제도에서 적산사의 역할과 적산사 협회의 활동현황)

  • Sohn, H.K.;Lee, H.K.;Park, I.P.;Park, M.Y.;Kwon, Y.M.;Seo, S.S.;Kim, K.G.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2004.05b
    • /
    • pp.176-179
    • /
    • 2004
  • When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system fur building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is summarized to roles and systems of quantity surveyor. And we investigated to activities and organizations of its associations.

  • PDF

Integration of BIM and Simulation for optimizing productivity and construction Safety

  • Evangelos Palinginis;Ioannis Brilakis
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.21-27
    • /
    • 2013
  • Construction safety is a predominant hindrance in in-situ workflow and considered an unresolved issue. Current methods used for safety optimization and prediction, with limited exceptions, are paper-based, thus error prone, as well as time and cost ineffective. In an attempt to exploit the potential of BIM for safety, the objective of the proposed methodology is to automatically predict hazardous on-site conditions related to the route that the dozers follow during the different phases of the project. For that purpose, safety routes used by construction equipment from an origin to multiple destinations are computed using video cameras and their cycle times are calculated. The cycle times and factors; including weather and light conditions, are considered to be independent and identically distributed random variables (iid); and simulated using the Arena software. The simulation clock is set to 100 to observe the minor changes occurring due to external parameters. The validation of this technology explores the capabilities of BIM combined with simulation for enhancing productivity and improving safety conditions a-priori. Preliminary results of 262 measurements indicate that the proposed methodology has the potential to predict with 87% the location of exclusion zones. Also, the cycle time is estimated with an accuracy of 89%.

  • PDF

Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers (저층·고층 아파트가 혼합배치된 단지에서 공기단축이 건설사업비에 미치는 영향 분석)

  • Bang, Jong-Dae;Chun, Young-Soo;Jun, Myoung-Hoon;Kim, Sa-Rang;Lee, Do-Heun
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.415-421
    • /
    • 2012
  • In case of Korean housing complex, there became more mixed arrangement of buildings with different number of layers for a variety of urban skyline, recently. For example, around 33% of the construction sites of 'A' public corporation have gaps of more than 4 layers between high-rise buildings and low-rise ones in the same site, according to the survey. Generally, construction duration of the housing complex is estimated based on the layers of the highest building. Due to this baseline, whole construction duration could be extended so that the project cost could be increased. Therefore, framework duration of higher-rise buildings should be reduced to secure the feasibility of the project. On the other hands, these shortenings could adversely harm the feasibility in some cases because there are a wide range of combinations of the buildings with different number of layers in designing housing complex. Therefore, this study shows the results of analysis on effects of framework time shortening on the cost in housing complex project. Moreover, this could set the baseline of checking possibilities in condensing the construction duration of projects with buildings of different layers by supplying comprehensive database.

Case Study for Telecommunication Network Design based on Optimal Path Algorithm (최적경로 알고리듬을 활용한 경제적인 통신망 설계 적용 사례)

  • Jung, Ju-Young;Choi, Yun-Soo;Jun, Chul-Min;Cho, Seong-Kil
    • Journal of Korea Spatial Information System Society
    • /
    • v.8 no.1 s.16
    • /
    • pp.107-118
    • /
    • 2006
  • In this paper, several network algorithms were tested to find an optimal one for telecommunication network design. Algorithms such as Dijkstra's shortest path algorithm, Ford-Bellman's shortest path algorithm, Prim's minimum spanning tree algorithm, and Kruscal's minimum spanning tree algorithm were reviewed and compared in terms of feasibility and resulted network construction cost. Then an optimal algorithm that is most suitable for telecommunication network design was selected. For more specific and quantitative analysis of the selected algorithm, it was implemented to a real telecommunication network construction site. The analyzed results showed that the suggested design method when compared with the conventional one, reduced the network construction cost considerably. The total network length estimated by the conventional method were 5267 meters while the suggested method resulted in 4807 meters. Thus the new method reduced the total network length by 8.7 percent which is equivalent to 97,469,000 Won of construction cost. Considering the frequent telecommunication network constructions, due to new urban developments in the nation, the economic benefit of the suggested telecommunication network design method will be significant. In addition to the construction cost savings, the suggested telecommunication network design procedure possesses several other economic benefits. Since the design procedure can be standardized and automatized, it can reduce the design cost itself and the skill acquirement periods required for new or inapt design crews. Further, due to the standardized and automatized design procedure, any telecommunication network design results can accessed more objectively.

  • PDF

Development of Survey Framework for Prevailing Wage in the Construction Industry (건설분야 적정임금 산정을 위한 임금조사 프레임워크 개발)

  • Lee, Ju-hyun;Baek, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.138-147
    • /
    • 2020
  • The construction field is one of the most representative job creation businesses, but it has been pointed out that the overall quality of the jobs is low because of the nature of the order-made production industry, such as unstable employment structure, aging workforce, etc.. Accordingly, the government plans to implement the "prevailing wage system" that guarantees a minimum wage for construction site workers. In reality, however, only a market wage could be used for a construction cost estimation because there was no standard for the prevailing wage. A comparative analysis of the prevailing wage and market wage was performed. This paper proposes a framework for estimating the reasonable prevailing wage in the construction industry. The results showed that the prevailing wage was estimated to be 4.7% lower than the market wage when the proposed framework is applied to the carpenters' case. This suggests that the proposed model could be used as an alternative for market wage considering the original purpose of the prevailing wage. This study will construct the basic data for scientific analysis on the wage, and finally, help estimate the reliable prevailing wage in the future.

The Direction of Information System Construction for Infrastructure Maintenance & Management (시설물 유지관리의 정보시스템 구축방향)

  • Kim Tae-Hak;Kim Nam-Gon;Ju Ki-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.474-477
    • /
    • 2002
  • Information technology has affected various industries, and the construction industry is one of those. In construction industry, the operating body for maintenance is trying to implement more systematic management skill for public facilities in order to minimize the life cycle cost. For more efficient maintenance system, first, the target facilities were selected and the present condition of their systems was estimated. And, the implementation plan of new system was proposed based on them. Accordingly, the new system managed by working-level personnel can supplement the weak points in the current system.

  • PDF

기후요소를 활용한 철골공사기간 예측 시스템에 관한 연구 - 실시간 진도관리 시스템 적용을 중심으로 -

  • Park, Jung-Lo;Yoo, Seung Kyu;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.213-217
    • /
    • 2009
  • Weather factors affect cost increases and progress management under construction. Because progress schedule is delayed by weather factors, the construction costs are increased. It is an essential element to control the progress schedule applying weather factors to the progress management. This study applies monthly working-day percentages which is estimated by databases of past weather information to RTPM system. Through do progress management in construction projects exactly, will try to minimize risk of process control that do that is to weather factors. Also, will compare calamity in safety supervision side that do that is to weather factors beforehand. Based on the factors and the expected impact of factors together with the weather data during the last 50 years in Seoul region gathered from Korea. Through it, calculated number of month working day of RCA's structural steel work. Studied way that apply to RTPM system.

  • PDF

Estimating the Value of Travel Time for Intercity Leisure Trips (지역간 여가통행의 시간가치 산정 연구)

  • Lee, Jang-Ho
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.6
    • /
    • pp.59-70
    • /
    • 2012
  • The relative importance of leisure trip has been increased after adopting the five-day workweek system and considering the higher income level. Thus, the value of travel time for intercity leisure trips should be estimated to conduct a reasonable benefit/cost analysis for railway construction projects. In this paper, the value of travel time was estimated separately for each trip purpose such as business, leisure, and other non-business than leisure. The estimated values of leisure travel time ranged from 5,310 to 14,185 (won/hr) by altering travel mode, and were increased by 42-107% when comparing with those of non-business travel time. Besides, how to apply the value of intercity leisure travel time for B/C analysis of railway projects was suggested. For the construction case of a railway connecting Chuncheon and Sokcho, the estimated benefit was increased by 2.3%.

Sensorless speed control of DC servo motor (DC 서보모터의 센서리스 속도 제어)

  • 김창세;오정석;하주식
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.203-206
    • /
    • 1997
  • DC servo motors are widely used in many industrial fields as actuator of robot and driving power motors of electrical vehicle. Usually in the speed control systems, of motors, speed sensors are required and this fact results in the increased price and operating cost and the limited application of the motors. In this paper, a new speed control method for DC servo motor is proposed. In the scheme, the rotational speed is estimated by the measurement values of the armature voltage and current, instead of measurement by sensor. Optimal control theory is applied to design of the controller in construction of real system. This paper also report on the results of experiments to prove the validity of the proposed method.

  • PDF