• 제목/요약/키워드: Estimated Construction Cost

검색결과 307건 처리시간 0.029초

도로 종류와 도로생애주기별 탄소배출량, 에너지소모량 및 비용에 대한 거시적 분석방법 (Macro-level Methodology for Estimating Carbon Emissions, Energy Use, and Cost by Road Type and Road Life Cycle)

  • 허혜정;백종대
    • 한국도로학회논문집
    • /
    • 제17권2호
    • /
    • pp.143-150
    • /
    • 2015
  • PURPOSES : The authors set out to estimate the related carbon emissions, energy use, and costs of the national freeways and highways in Korea. To achieve this goal, a macro-level methodology for estimating those amounts by road type, road structure type, and road life cycle was developed. METHODS : The carbon emissions, energy use, and costs associated with roads vary according to the road type, road structure type, and road life cycle. Therefore, in this study, the road type, road structure type, and road life cycle were classified into two or three categories based on criteria determined by the authors. The unit amounts of carbon emissions and energy use per unit road length by classification were estimated using data gathered from actual road samples. The unit amounts of cost per unit road length by classification were acquired from the standard cost values provided in the 2013 road business manual. The total carbon emissions, energy use, and cost of the national freeways and highways were calculated by multiplying the road length by the corresponding unit amounts. RESULTS: The total carbon emissions, energy use, and costs associated with the national freeways and highways in Korea were estimated by applying the estimated unit amounts and the developed method. CONCLUSIONS: The developed method can be employed in the road planning and design stage when decision makers need to consider the impact of road construction from an environmental and economic point of view.

S대학교 교육연구동 LCC분석 사례 연구 (A Study of on the Case Study of LCC Analysis for the Education and Research Building of S University)

  • 서민구;하한기;박태근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.329-332
    • /
    • 2003
  • 건설교통부는 건설사업의 경제성 제고와 시설물의 안전 및 유지관리에 관한 의사결정을 지원하는 LCC예측 기술이 저조하다고 판단하고 건축물의 타당성조사와 기본설계단계에서 LCC기법을 도입하고 있다. 최저초기비용으로 결정되던 건축물의 계획, 설계단계를 LCC분석절차 및 기법의 도입으로 장래 건물경영적, 유지보전적, 기술평가적, 건물이용자적으로 보다 합리적인 결정을 할 수 있다. 본 연구에서는 한 LCC기법을 이용하여 건축물을 대상으로 건축계획요소와 구조시스템의 계획안 및 대안을 제시하고, 경과년수에 따른 수명주기비용의 절감을 비교${\cdot}$분석하였다.

  • PDF

연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로 (Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City)

  • 허강국;박형근;안병철;민병욱
    • 대한토목학회논문집
    • /
    • 제36권4호
    • /
    • pp.705-713
    • /
    • 2016
  • 연약지반 공사는 설계단계에서 고려하지 못한 변수들이 시공단계에서 발생되어 구조물의 안정성과 설계변경에 따른 공사비 증가의 원인이 된다. 본 연구는 충청북도 오창지역에 조성되는 산업단지 진입도로 조성구간을 연구대상으로 하며, 연약지반 처리공법으로 암버럭을 이용한 치환공법 및 사용하중을 고려한 과재성토를 연약지반 처리대책으로 선정, 구조물의 안정성 및 공기 단축으로 공사비 절감효과 분석에 목적이 있다. 연구구간의 연약지반 두께는 사질토 및 점성토 연약지반으로 2.4~5.5m로 규모가 작으나 지표하 1.5~5.9m의 지층사이에 불균등하게 분포하며, 침하발생은 크지 않으나 장래 부등침하와 단차 발생이 예상되어 연약지반 처리후 현장 계측결과를 분석하여 장래 침하거동을 예측하였다. 또한, 치환재료는 지역특성 및 경제성을 고려하여 양질토사를 암버럭으로 치환하여 안정성 증가, 공기단축 등으로 공사비 29%를 절감하였다. 본 연구를 바탕으로 향후 제체내 간극수압 소산, 지하수위 변동 등의 예측과 실제 계측된 연약지반의 압밀과의 관계 등에 대한 추가적인 연구를 수행할 경우, 다양한 현장조건에서 연약지반 거동을 정확히 예측할 수 있을 것으로 기대된다.

평양 5만세대 주택건설계획의 경제적 효과 분석 (Economic Effect Analysis of Pyongyang's 50,000 Housing Units Construction Project)

  • 이주영
    • 분석과 대안
    • /
    • 제8권1호
    • /
    • pp.87-109
    • /
    • 2024
  • 북한은 2021년 제8차 당대회를 통해 평양 5만세대 주택건설계획을 발표하였는데 본고는 이 사업의 경제적 효과 및 관련된 비공식 비용을 분석하였다. 현재 평양은 주택부족 현상이 현저하게 나타나고 있다. 1994~2020년중 평양의 세대수가 18.4만세대 증가한 것으로 추정된 반면 기간중 신규 주택공급 추정량은 3만세대에 그치고 있다. 평양 5만세대 주택건설계획은 근로자의 주거여건 개선 목표, 신도시 건설방식 적용, 고난의 행군 이후의 최대규모 국가주도 주택건설 등을 특징으로 한다. 평양 5만세대 주택건설 계획은 노동자의 근로의욕 고취, 관광자원 증대, 연관산업의 소득유발 등의 경제적 효과를 발생시킬 것으로 예상된다. 다른 한편으로는 평양 5만세대 주택건설계획에 소요되는 건설비용의 상당폭이 기업 및 가계에 준조세 및 인력동원이라는 비공식 비용 형태로 전가되며 입주시 발생하는 전력공급, 하수도시설 등에서의 혼잡이 있을 수 있다. 이러한 비공식 비용을 고려하지 않는 경우 주택건설계획의 타당성이 제대로 평가되지 못해 계획추진이 장기적으로 지속되기 어려울 수 있다.

대체비용법을 이용한 수치지형도 갱신사업의 편익분석 모형 연구 (Benefit analysis model of the national map revision program using replacement cost method)

  • 손화민;양성철;가칠오;유기윤;허용
    • 한국측량학회지
    • /
    • 제31권1호
    • /
    • pp.79-87
    • /
    • 2013
  • 본 연구는 대체비용법을 이용하여 수치지형도 갱신사업의 편익을 분석하는 방법을 제안하였다. 대체비용법은 분석하고자 하는 사업의 기능을 기존 시장의 재화 또는 서비스의 기능으로 대체하는데 필요한 최소 비용으로 해당 사업의 편익을 측정하는 방법이다. 따라서 도시군관리계획수립과 같은 지방자치단체의 18개 행정 업무에서 1/5,000 수치지형도의 갱신에 관한 요구를 조사한 후 이들 요구를 현황측량 및 현장조사 용역으로 대체하기 위한 비용 모형을 건설분야 표준품셈과 GIS 기업을 대상으로 수행된 설문 결과를 이용하여 수립하였다. 그 결과 조사대상 지방차지단체에서 갱신사업의 연간 편익은 265,960,999원으로 측정되었다. 또한 0.5년에서 4년까지 갱신주기를 변화하면서 비용편익비를 분석하여 최적 갱신주기를 탐색하였다.

건축물 범죄예방 기준 확대적용에 따른 경제성 분석 (An Economic Analysis by Applying Extended Crime Prevention Standards for Buildings)

  • 현태환;조영진
    • 대한건축학회논문집:계획계
    • /
    • 제35권11호
    • /
    • pp.53-60
    • /
    • 2019
  • Multi-unit house, multi-household house, row house and apartments with less than 500 households were included in the list of anti-crime for buildings following the revision of the "notice of crime prevention building standards" on July 31, 2019. Strengthening the performance of crime prevention buildings is inevitable to increase the cost of building construction, including installation of preventive facilities and use of facilities that have secured performance. Thus an economic analysis on the costs and expected benefits of implementing the standards is required for social consensus. Economic analysis is divided into cost analysis and benefit analysis. This study aims to perform an economic analysis on the installation of crime prevention facilities in the buildings subject to expanded crime prevention obligations. Cost analysis is calculated as the sum of the cost of installation and the price of the crime prevention facilities installed for each target residential building. Benefit analysis is calculated as the social cost of targeted crimes that are expected to decrease due to the installation of crime prevention facilities. Economic analysis shows that the total cost of installing crime prevention facilities in residential buildings is estimated at 107.31 billion won per year, while the total benefit from enhanced crime prevention performance is estimated at 9.38 billion won per year. Considering inflation, benefits are expected to outpace costs in the 28th year since the system was implemented.

유전 알고리즘 - 서포트 벡터 회귀를 활용한 공동주택 공사비 예측에 관한 연구 (A Study on Estimating Construction Cost of Apartment Housing Projects Using Genetic Algorithm-Support Vector Regression)

  • 남군;최재웅;최혜미;김주형
    • 한국건설관리학회논문집
    • /
    • 제15권4호
    • /
    • pp.68-76
    • /
    • 2014
  • 건축 프로젝트에서 초기단계에서의 정확한 공사비 예측은 성공적인 프로젝트의 중요한 요소이다. 기존의 연구에서 공사비를 예측하기 위한 방법으로 통계학적인 방법이 활용되었다. 통계학적 방법 중 서포트 벡터 회기분석은 비용예측 분야에서 뛰어난 일반화 능력으로 많은 주목을 받고 있다. 하지만 서포트 회귀분석은 조정해야 할 파라미터가 단순함에도 불구하고 최적의 파라미터를 결정하는 방법은 시행착오적인 방법을 적용해야 하는 문제점이 있었다. 따라서 최적의 파라미터를 보다 효율적으로 결정하기 위해 본 연구에서는 유전 알고리즘을 적용하고, 이를 통해 서포트 벡터 회귀를 효율적으로 활용한 공사비 예측이 가능 할 것이다. 본 연구의 목적은 유전 알고리즘과 서포트 벡터 회귀를 활용하여 공동주택의 프로젝트 초기 기획단계의 공사비 예측모델을 구축하는 것이다. 유전 알고리즘을 통해 최적의 파라미터를 찾아내고, 이를 서포트 벡터 회귀모델에 적용시켜 공사비를 예측하였다.

오브젝트-파라미터기반 건축마감공사비 개산견적 모델 (Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings)

  • 구교진;박성호;박성철;송종관
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.175-184
    • /
    • 2008
  • 건설 프로젝트의 수익성 및 타당성을 판단하기 위한 기준으로 설계초기단계에 활용되는 개산견적은 설계의사결정 업무와 밀접한 연계성을 가지고 수행되어야 할 뿐만 아니라, 정확하고 신뢰성 있는 견적결과를 도출해야 한다. 설계초기단계에서 설계자의 의사결정 지원과 설계변경에 대한 즉각적인 대처를 위해 프로토타입기반 개산견적 시스템이 개발되었지만, 파라미터에 의해 산정되는 공사항목 및 사용자에 의한 추가공사에 대한 공사비 고려가 미흡하였다. 따라서 본 연구에서는 견적의 정확도를 향상시키기 위해 실제 고층 오피스 빌딩 프로젝트의 실적자료 분석을 통해 기본설계단계에서 오브젝트-파라미터기반 건축마감공사비 산정 모델(Object & Parameter based Schematic Estimation Model, OPSEM)을 개발하였다. 모델 개발을 위해 공사비 내역서, 도면으로부터 얻은 작업항목에 대한 정보를 분석 및 분류하고, 각 작업항목 속성에 맞는 공사비 산정 방식을 제안하였다. 본 연구의 실무 효용성 검증을 위해 유사 사례 프로젝트를 바탕으로 기존의 견적방식과 제시된 모델을 활용한 견적방식의 오차율을 분석하여 정확도 비교를 실시하였다.

Feasibility Analysis on Ground-level Stations and Wireless Power Transfer Technology Applications for Monorail System

  • Hwang, Karam;Chung, Jong-Duk;Lee, Kibeom;Tak, Junyoung;Suh, In-Soo
    • International Journal of Railway
    • /
    • 제7권3호
    • /
    • pp.71-79
    • /
    • 2014
  • Subway systems have been a proved method of public transport and are widely used in major cities around the world. However, the time and cost it takes to construct such systems are very high, as it requires underground tunnels. Cities in various countries have implemented monorail systems as public railway transport as it can be more economical and quicker compared to subway systems in terms of construction. In addition, it provides more convenience towards the public as it is not affected to traffic, and also provides an aerial view of the city. However, the overall construction cost for monorail systems is still significantly high, and as a possible solution to further reduce the overall cost, implementation of ground-level stations and wireless power transfer technology has been proposed in this paper. A concept application layout of ground-level stations and wireless power transfer systems has been discussed, using the Daegu monorail Line 3 system as a simulation base. The expected cost for monorail systems implementing ground-level stations and/or wireless power transfer technology has been estimated based on literature survey, and was compared with the current construction cost of Daegu monorail system. Based on comparison, it has shown that implementation of ground-level stations are the most economical, and can be easily implemented for either starting or expanding the monorail line. Implementation of wireless power transfer technology is also economical, but is more feasible when starting a new monorail line as it requires components which will alter the configuration of the train and infrastructure.

유리창 청소작업의 자동화 장비 도입에 대한 타당성 분석 (Feasibility Study for Introducing Window Cleaning Device)

  • 김균태
    • 한국산학기술학회논문지
    • /
    • 제21권12호
    • /
    • pp.612-618
    • /
    • 2020
  • 최근에 외부 유리창 청소에 대한 수요는 증가하고 있으나, 이 청소는 매우 위험한 인력 의존형 작업이다. 또한 청결을 중시하는 업장에서 원하는 빈도로 자주 청소하는 것도 용이하지 않다. 따라서 이 작업을 자동화 할 필요가 있다. 본 연구에서는 특정 유리창에 부착하여, 그 유리창을 지속적으로 청소하는 장치의 개념을 제시하고, 이 장치의 경제적 타당성을 분석하였다. 분석 결과, 장비의 예상 제작비 1천만 원 수준이나, 투자 가능비용은 내구연한 5년 기준으로 최소 9.8백만 원, 내구연한 10년 기준으로 최소 103백만 원 수준이었다. 따라서 장비비 보다 예상 절감액이 충분히 커서, 경제적 타당성이 있는 것으로 평가 되었다. 본 연구에서는 정량적 지표만으로 분석하여, 안전성 향상에 의한 노무자 안전 사고 감소, 생산성 향상, 공기 단축, 품질 향상 등으로 인한 원가 절감 기대 값은 고려되지 않았다는 한계가 있다. 따라서 향후 고려되지 않은 기대 값을 추가하여 자동화 장비에 의한 원가절감 효과를 산출하면 경제성이 보다 정확하게 산정될 것으로 예상된다.