• Title/Summary/Keyword: Estimated Construction Cost

Search Result 307, Processing Time 0.027 seconds

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

Optimum Intensity for Seismic Design of Major Man-made Structures in Korea (한반도내(韓半島內) 주요(主要) 인공구조물(人工構造物)의 적정(適正) 내진설계진도(耐震設計震度))

  • Kim, Sung Kyun
    • Economic and Environmental Geology
    • /
    • v.19 no.4
    • /
    • pp.297-304
    • /
    • 1986
  • Earthquake disaster is dependent upon both site intensity and strength of structures. The higher the strength, structures become more safe, which in turn increases the construction cost. Therefore, it is necessary to decide an optimum design intensity in which the safety is balanced with the cost. Such an optimum design intensity for major man-made structures in Korea is determined in the present study from a simulation model as follows. 1) Hypothetical earthquake time series are generated from the probability distribution to represent appropriately the seismicity of Korea. 2) The strength of structures constructed with a certain design intensity is assumed to exponentially decrease with the elapsed time. The construction cost is also expressed as a function of design intensity. 3) Comparing the seismic intensity generated from the earthquake time series with the strength of structures, the safety of structures is examined. Then the time until the structure is damaged by an earthquake is obtained within the designed life time. 4) The above simulation is iterated several hundred times and hence the mean life time of structures having a certain design intensity is obtained. 5) After all, the optimum design intensity to minimize the annual mean loss, the ratio of construction cost to mean life time, is estimated. The major conclusions obtained from the above simulation model are as follows. 1) Depending upon the designed life time ($T_p$), the optimum design intensities are appeared to be 0. 05-0. 10g for $T_p=50yr$ and 0. 08-0.13g for $T_p=100yr$. 2) According to the sensitivity analysis, the optimum design intensity increases with the rapid strength decrease of structure and decreases with the increase of initial construction cost.

  • PDF

System Structure and Reliability Optimization of VVVF Urban Transit Brake System Through Cost Function Construction (비용함수를 이용한 VVVF 전동차 제동장치의 시스템 구조 및 신뢰도 최적화)

  • Kim, Se-Hoon;Kim, Hyun-Jung;Bae, Chul-Ho;Lee, Jung-Hwan;Lee, Ho-Yong;Suh, Myung-Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.15 no.3
    • /
    • pp.63-71
    • /
    • 2007
  • During the design phase of a product, reliability and design engineers are called upon to evaluate the reliability of the system, The question of how to meet target reliability for the system arises when estimated reliability or cost is inadequate. This then becomes a problem of reliability allocation and system structure design. This study proposes the optimization methodology to achieve target reliability with minimum cost through construction of the cost function of system. In cost function, total cost means the sum of initial cost, repair cost and maintenance cost. This study constructs optimization problem about system structure design and reliability allocation using cost function. This problem constructed is solved by Multi-island Genetic Algorithm(MIGA), and applies to urban transit brake system. Current brake system of the urban transit is series system. Series system is the simplest and perhaps one of the most common system, but it demands high reliability and maintenance cost because all components must be operating to ensure system operation. Thus this study makes a comparative study by applying k-out-of-n system to brake system. This methodology presented can be a great tool for aiding reliability and design engineers in their decision-makings.

A Quantity Prediction Model for Reinforced Concrete and Bricks in Education Facilities Using Regression Analysis

  • Lee, Jong-Kyun;Kim, Boo-Young;Kim, Jang-Young;Kim, Tae-Hui;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.506-512
    • /
    • 2013
  • Since the amendment of the law on the private sector investment in social infrastructure in January of 2005, the government has been actively promoting Build-Transfer-Lease (BTL) projects. Notably, most new educational facilities have been built as BTL projects. For these facilities, the unit cost per unit area has been applied to predict construction costs. However, since construction costs are mostly managed after the detailed design phase, the costs can be estimated incorrectly. For this reason, cost management is needed in the planning phase, with a sound approximate estimate to prevent the wasteful use of funds. To address this shortcoming, this study aims to develop a quantity prediction model for education facilities using regression analysis in the planning phase. The developed model is focused on the required quantities of reinforced concrete and bricks. In order to achieve the objective, the data of 44 educational facility projects collected from Gyeonggi-do was used in the regression model. This study can be utilized by major stakeholders to accurately predict construction costs by estimating the appropriate quantities of reinforced concrete and bricks in the planning design phase.

Cost Analysis for the Carcass Burial Construction (가축매몰지 조성비용 평가)

  • Kim, Mihyung;Kim, Geonha
    • Journal of Soil and Groundwater Environment
    • /
    • v.18 no.1
    • /
    • pp.137-147
    • /
    • 2013
  • A lot of burial sites for the disposal of the contagious livestock slaughtered by foot and mouth disease were constructed in a short time for preventing the rapid spread of the virus. More than 4,700 carcass burial sites were constructed in 2011. Approximately 7 million poultry and 3.5 million livestock including head of cattle and swine were buried in farm land. However, the available cost data for a burial site was not provided. This study was to performed in order to understand the economic issues related to carcass burial disposal. The data from a local government was analyzed and the assumption data web based was constructed to evaluate the cost for constructing a carcass burial. The results showed that the local government paid KRW 5,386 for the burial disposal of a mortality (swine). It was estimated that the cost could be reduced through an appropriate measures.

Estimation of Cost of Energy for Offshore Wind Turbines (해상 풍력발전의 경제성 분석)

  • Chung, Taeyoung;Moon, Seokjun;Lee, Hanmin;Rim, Chaewhan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.177.1-177.1
    • /
    • 2010
  • Large offshore wind farms have actively been developed in order to meet the needs for wind energy since the land-based wind farms have almost been fully developed especially in Europe. The key problem for the construction of offshore wind farms may be on the high cost of energy compared to land-based ones. NREL (National Renewable Energy Laboratory) has developed a spreadsheet-based tool to estimate the cost of wind-generated electricity from both land-based and offshore wind turbines. Component formulas for various kinds and scales of wind turbines were made using available field data. Annual energy production has been estimated based on the Weibull probability distributions of wind. In this paper, this NREL estimation model is introduced and applied to the offshore wind turbines now under designing or in production in Korea, and the result is discussed.

  • PDF

Development on Reconstruction Cost Model for Decision Making of Bridge Maintenance (교량 유지관리 의사결정 지원을 위한 개축비용 산정모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Lee, Min-Jae;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.533-542
    • /
    • 2016
  • The periodic maintenance of bridges is necessary once they have been constructed and its cost depends on various factors, such as their condition, environmental conditions and so on. To make a decision support system, it is essential to establish a basic reconstruction cost model. In this study, a regression model is suggested for calculating the reconstruction cost for typical cases and influential factors, depending on the type of bridge and its components, by analyzing the basic bridge specifications based on the data of the Bridge Management System (BMS). The details for each case were estimated in consideration of the cost calculation variables. The details for each case were estimated in consideration of the cost calculation variables. The cost model for the new construction of the superstructure, substructure and foundation and the temporary bridge construction and demolition costs were drawn from the regression analysis of the estimation results of typical cases according to the cost calculation variables. The reconstruction costs for different types of bridge were obtained using the cost model and compared with those in the literature. The cost model developed herein is expected to be utilized effectively in maintenance decision making.

A Study on the Calculation Method of GHG Emission in Railroad Construction (철도건설단계에서의 온실가스 배출량 산정방안 연구)

  • Lee, Jae-Young;Jo, Su-Ik;Bae, Joon-Hyung;Jung, Woo-Sung;Lee, Cheol
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2353-2355
    • /
    • 2010
  • Since the efforts in transportation for counteracting Climate Change have been enhanced, it is necessary to reduce GHG emissions from railroad construction. The aim of this study was to develop the calculation method of GHG emissions at the step of railroad construction. Main emission source was the energy consumption from the used heavy equipments. Firstly, GHG inventory including equipments list, energy consumption, and work load was established with the detailed process using standard for the unit cost of construction. Also, the energy consumption of heavy equipments during track construction at A site was collected to compare with the field data. As a result, the GHG emissions between the estimated and the field were a little different, which was caused by the inaccurate field data. Therefore, it is important to manage data efficiently for the calculation of GHG emissions in the field of railroad construction.

  • PDF

An Application of Precast Concrete System for Steel Framed Residential Buildings and PC Framed System for Parking Structure (철골조 아파트의 PC 공법 적용성 및 지하주차장의 골조 PC 공법)

  • 김영수;김정연;임인혁;김두영;장월선
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.903-910
    • /
    • 2000
  • Because the construction type SFRB is completely different in comparison with that of RC apartment the construction and work process, which are currently used, have to be changed. The main purpose of study is to analyze the difficulties of this construction and to apply the technology for other construction area. In this study, it is investigated to the problems of construction for SFRB and the construction method of PC panel fabricated on SFRB in Yongin goosng. Later, it is estimated prefabricated method had an great effect on PC panel System as lower cost and shorter schedule in SFRB. The Precast concrete framed System has many merit than the reinforced concrete structures system at constructability, structural safety and quality, therefore, it will be widely applied at parking structure in the future.

  • PDF

Assessing the Impacts of Project Interfaces in Construction Works in Nigeria

  • Okebugwu, Onyinyechi Francesca;Omajeh, Enoch Oghene-Mairo
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.20-25
    • /
    • 2015
  • Interface management problems inherent in construction projects hamper their successful delivery. Therefore, this study aimed at determining the most important project interfaces in construction works in Nigeria in terms of most significant potential impacts, so that management attention are objectively focused on potential highest impacting project interfaces. From a review of literature, 28 project interfaces management issues were identified and categorized. Structured questionnaires were used to collect data concerning the impact (estimated losses to the project in terms of cost) and probability of occurrence of the identified interfaces. The interfaces were ranked using their computed Matrix Scores (MS). The results reveal that "project-workers interfaces problem manifested in use of inappropriate mixes" is the highest impacting. A ranking of the interface categories also reveal that the interfaces at the execution phase of a project (MS = 1226.79) are those that could result in the highest losses to the project.