Browse > Article
http://dx.doi.org/10.5345/JKIBC.2013.13.5.506

A Quantity Prediction Model for Reinforced Concrete and Bricks in Education Facilities Using Regression Analysis  

Lee, Jong-Kyun (Department of Architectural Plant, Youngsan University)
Kim, Boo-Young (School of Architecture, University of Ulsan)
Kim, Jang-Young (Department of Education Facility, Anyanggwacheon Office of Education)
Kim, Tae-Hui (Department of Architectural Engineering, Mokpo National University)
Son, Kiyoung (School of Architecture, University of Ulsan)
Publication Information
Journal of the Korea Institute of Building Construction / v.13, no.5, 2013 , pp. 506-512 More about this Journal
Abstract
Since the amendment of the law on the private sector investment in social infrastructure in January of 2005, the government has been actively promoting Build-Transfer-Lease (BTL) projects. Notably, most new educational facilities have been built as BTL projects. For these facilities, the unit cost per unit area has been applied to predict construction costs. However, since construction costs are mostly managed after the detailed design phase, the costs can be estimated incorrectly. For this reason, cost management is needed in the planning phase, with a sound approximate estimate to prevent the wasteful use of funds. To address this shortcoming, this study aims to develop a quantity prediction model for education facilities using regression analysis in the planning phase. The developed model is focused on the required quantities of reinforced concrete and bricks. In order to achieve the objective, the data of 44 educational facility projects collected from Gyeonggi-do was used in the regression model. This study can be utilized by major stakeholders to accurately predict construction costs by estimating the appropriate quantities of reinforced concrete and bricks in the planning design phase.
Keywords
build-transfer-lease; educational facilities; quantity takeoff; regression analysis;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Ministry of Strategy and Finance. Social overhead capital status and improvement [Internet]. Sejong: Ministry of Strategy and Finance; 2013 May 31[cited 2013 June 16]. 166 p. Available from: http://www.mosf.go.kr/policy/policy01. jsp.htm
2 Kim CY, Son JH. A study on the model of artificial neural network for construction cost estimation of educational facilities at conceptual stage. Journal of the Architectural Institute of Korea. 2006 Jun;7(4):91-9.
3 Kim SM, Cho JH, Lee JS, Chun JY. Cost estimating model of structural elements using approximate quantity survey in preliminary building design phase. Journal of the Architectural Institute of Korea. 2009 Dec;25(12):155-64.   과학기술학회마을
4 Jeon YI. A study on the analysis and the prediction of the cost for the school construction [master's thesis]. [Daejeon (Korea)]: Mokwon University; 2004. 133 p.
5 Park YJ, Won SK, Han CH, Lee JB. A study on 3D BIM collaborative approximate estimating model of structural work for apartment projects. Journal of the Architectural Institute of Korea. 2011 Jun;27(6):123-30.   과학기술학회마을
6 Seong JH, Kim GH. A study on the development of BIM guideline for apartment house. BIM conference. 2012 May;2(1):5-6.
7 Lee MK, Chin SY. A study on the accuracy of BIM-based quantity take-off of apartment interior. Journal of the Korea Institute of Construction Engineering and Management. 2013 Jan;14(1):12-22.   과학기술학회마을   DOI   ScienceOn
8 Kwon OB, Son JH, Lee SH. Study on the application of 3D-base BIM for school facilities to increase cost management efficiency. Journal of the Korea Institute of Building Construction. 2010 Dec;10(6):49-60.   과학기술학회마을   DOI   ScienceOn
9 Kim JH, Lee MH, Lee HK. The estimation of construction cost by using the actual information in the educational building projects. Journal of the Regional Association of Architectural Institute of Korea. 2005 Nov;7(4):89-96.
10 Lee CK, Cho BH, Park TK. A survey on the persons in charge for economic estimation analysis and improvement of BTL projects. Journal of Korea Institute of Construction Engineering and Management. 2007 Aug;8(2):73-80.   과학기술학회마을
11 Seo CS. Financing of educational lnfrastructure in private investment(Build-Transfer-Lease). Journal of the Architectural Institute of Korea. 2006 Feb;50(2):89-91.
12 Lee CK, Cho BH, Jung YH, Park TK. A study on developing the calculation system of disbursement for government on the BTL projects. Journal of Korea institute of Construction Engineering and Management. 2009 Mar;10(2):93-101.   과학기술학회마을
13 Kim JW, Lee BR, Kim JH, Kim JJ. A study on construction cost estimation model according to the spatial planning of educational facilities using regression analysis. Journal of Architectural Institute of Korea. 2011 Aug;27(10):103-10.   과학기술학회마을