Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project - (갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 -)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.87-94
    • /
    • 2012
  • The apartment reconstruction projects have the proper functions such as residential environment improvement and the new housing allocation system; however, intention of the projects are distorted by the combination of factors, like failure of relocation of the original occupants and income redistribution, speculation in real estate, sharp rise in housing price, disputation between various interested parties, inadequate system and etc and it makes the projects unable to go well. Disputations and litigations are due to spread of the small conflict. As a result of the problems, it could not going smoothly and that lead to increase or stop the period and cost. This study is to estimate the period and cost using the conflict index so as to prevent and solve the problem which is among the conflict in the reverse functions. The conflict index has estimated focus on the conflict impact and the period and cost has been estimated using an variable independent including the conflict index. Also, estimated the conflict index and estimate of the period and cost are able to succeed with a minimum of disputation and money.

Estimating software development cost using machine-learning approach (학습이론을 이용한 소프트웨어 개발비 예측 모형)

  • Park, Chan-Kyoo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.345-355
    • /
    • 2005
  • As the portion of information systems(IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for quantitative and efficient management of IS budget. The primary concern in the cost estimation of IS projects is to estimate software development cost. In this paper, we propose a new method to estimate software cost using support vector regression(SVR), which has attracted considerable attention because of its good performance and theoretical clearness. The paper is the first study which apply SVR to software cost estimation.

  • PDF

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

A Study on the Development of PMO Cost Estimation Model (PMO 대가 산정모형의 개발)

  • Seo, Yong Won;Lee, Duck Hee
    • Journal of Information Technology Services
    • /
    • v.13 no.4
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

A Value-oriented System Integration Project Sizing and Cost Estimation Model (가치중심의 SI (System Integration) 사업 규모 및 비용산정 모형 구축 연구)

  • Kim, Hyun-Soo
    • Asia pacific journal of information systems
    • /
    • v.8 no.3
    • /
    • pp.101-118
    • /
    • 1998
  • The purpose of this study is to construct a value-oriented sizing and cost estimation model for system integration projects. In particular, this study is to build a system architecture design and integration cost model, and a network design and implementation cost model. Unlike software development projects, system integration projects include knowledge-intensive professional services on system architecture and network design areas. Because of these work's high invisibility, the cost of these services is hard to estimate and measure. Therefore, we need to develop value-oriented cost models. This study presents 6 value-oriented cost models, and tests statistical significance of these models with real system integration project data. The results show that cost factors on these models are valid, and models are statistically significant. Future work is needed to integrate various cost models and apply the whole model to field projects to increase model's prediction accuracy.

  • PDF

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

Improved Methods of Cost Sharing in Apartment Remodeling Projects (공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안)

  • Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.