• 제목/요약/키워드: Erection System

검색결과 98건 처리시간 0.024초

보강상세에 따른 RC 전단벽과 강재 보 전단접합부의 비탄성 거동 (Inelastic behavior of RC shear wall and steel girder shear connection on reinforcement details)

  • 송한범;이정한;양원직;강대언;이경훈;이원호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계학술발표회 논문집(I)
    • /
    • pp.138-141
    • /
    • 2006
  • Shear wall-frame system is one of the most, if not the most, popular system for resisting lateral loads. The core is the primary lateral load-resisting systems, the perimeter frame is designed for gravity loads, and the connection between perimeter frame and core is generally a shear connection. Specially, single plate shear connection have gained considerable popularity in recent years due to their ease of fabrication and erection. Single plate shear connection should be designed to satisfy the dual criteria of shear strength and rotational ductility. An experimental program was undertaken to evaluate seismic behavior of single plate shear connection. The main test variable is the reinforcing detail of connection. Through the experimental program, the cyclic behavior of typical and reinforcing single plate shear connection was established.

  • PDF

벌크헤드 플레이트가 부착된 강바닥판교의 피로상세 개선 연구 (A Study on Improvement of fatigue Details in Orthotropic Steel Deck Bridge with Bulkhead Plate)

  • 공병승
    • 한국해양공학회지
    • /
    • 제18권1호
    • /
    • pp.22-27
    • /
    • 2004
  • An orthotropic steel deck system is widely adapted form for a long-span bridge. It has many advantages, such as the big reduction of dead weight, the simplicity for erection, and the reduction of the construction period. However, an orthotropic steel deck system requires a lot of welding work, which may result in defects and deformation of connection. Therefore, the research for the general behavior and fatigue strength of the several details in orthotropic steel deck bridge is necessary. The fatigue failure with distortion results from secondary stress by out-of-plane deformation; these kinds of cracks are very difficult to measure, and can not be precisely calculated through finite element analysis. This stress concentration phenomenon generates the fatigue failure around the lower scallop of the transverse rib. This paper presents improved details of the intersection between the longitudinal rib and the transverse rib of an orthotropic steel deck bridge by the third dimensional hit size test, and the finite element method, which can minimize local stress through parametric study.

제약이론을 적용하여 설계된 선각건조공정 모니터링 시스템 개발 (Development of Monitoring System for Hull Construction Processes Using TOC Analysis)

  • 윤훈희;신동목
    • 대한조선학회논문집
    • /
    • 제45권3호
    • /
    • pp.315-321
    • /
    • 2008
  • A large ship usually consists of 300 to 500 blocks, for which it is extremely difficult to monitor the whole manufacturing processes from assembly to erection. In an effort to unify all the data and procedures, shipbuilding companies are installing ERP systems, which have brought great improvement throughout the company as a whole. In some departments, however, the ERP systems are not being fully utilized. This paper analyzes and solves the problems revealed especially at the production departments after an ERP system is installed. In this research, firstly a TOC(Theory of Constraints) analysis is done to find out the best solution for those problems. Secondly, based on the solution found, a Monitoring System for hull construction processes is developed with an improved user interface. The visualization of data is designed to reflect the needs of the production departments. The new system supplements the ERP system in that it selectively utilizes the unified data base and is operated under ERP environment. The system is installed in the production departments and its usefulness is verified.

조선소 생산물류 시뮬레이션 결과 정도 향상을 위한 생산정보시스템 기간 정보 검증 (Quality Verification of Legacy Data of Manufacturing Information System to Improve Results of Shipyard Manufacturing Logistics Simulation)

  • 이종학;이필립;윤경원;남종호
    • 대한조선학회논문집
    • /
    • 제51권6호
    • /
    • pp.510-520
    • /
    • 2014
  • Unlike other mass production in small variety, shipbuilding process is a project-based method in single variety, which causes unpredictable volatility in the planning system. In shipyards, series of manufacturing processes from fabrication to erection is sequentially carried out. In order to predict unfavorable changes such as overload or low load of working volume, computerized simulation has been being gradually adopted. The data used in the simulation are processed from the database of the main scheduling and planning system. Thus the quality of those data is very crucial for the meaningful results. Unfortunately, research on the verification of data quality is very rare and hardly known to the authors. In this work, using the database of scheduling and product information system of a large domestic shipyard, the data required for the simulation are qualitatively analyzed and verified.

제약이론을 기반으로 한 최적제품조합 의사결정 지원 방법론 및 시스템 (Decision Supporting Methodology and System Based on Theory of Constraints for Optimal Product Portfolio Strategy in Shipbuilding Industry)

  • 김인일;한성환;권민철
    • 대한조선학회논문집
    • /
    • 제46권3호
    • /
    • pp.362-371
    • /
    • 2009
  • Shipbuilding is a typical 'build to order' industry. It has a business model that generates revenues from building various ships and offshore products in accordance with owner's requirements at each production stage. Under uncertainty in shipping market, it is very essential for the shipbuilder to prepare the fast and competitive decision for product portfolio strategy in order to maximize contribution margin by exploiting production facilities and constraints. In this study, we introduce the unique decision supporting methodology for the optimal product portfolio sets based on Theory of Constraints(TOC). This methodology is established by adopting the concept of Drum Buffer Rope(DBR) in constraints planning and Throughput Accounting (TA) in management accounting of TOC. In addition, Decision Supporting System(DSS) is implemented. This DSS system provides a throughput estimator with reflecting the cost structure of shipbuilding industry and a resource simulator built on heuristic algorithms to operate major constraint-resources in shipyard such as dock, quay and pre-erection area etc. Several examples are presented to show that the proposed methodology and system can effectively support the strategic decision-making process of a global shipbuilding company.

런던아이의 디자인 전개와 건립과정에 관한 연구 (A Study on the Design Development and Construction Process in British Airways London Eye)

  • 우대성
    • 건축역사연구
    • /
    • 제15권1호
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

선박건조공정의 미세 통합 일정 관리 체계 구축에 관한 연구 (A Study on the Construction of Detail Integrated Scheduling System of Ship Building Process)

  • 김용섭;이대형
    • 대한조선학회논문집
    • /
    • 제44권1호
    • /
    • pp.48-54
    • /
    • 2007
  • Higher productivity and less cost during the manufacturing process of ships are required to maintain international competitiveness of modern shipbuilding industries. The integrated hull/ outfitting/ painting scheduling(IHOP) process is a final point, where logistics are finally being integrated and upcoming schedules are made. Therefore, more profits are expected from IHOP by effective management. In this thesis, IHOP is proposed in order to solve how to choose block erection date with IHOP scheduling logic. The result of IHOP scheduling is highly advised to utilize fabrication, outfitting shops. A standardized operation and load of resource will eventually be applied in long-term time span point of view for this will make it easy to enable capacity planning and workforce planning. It is also expected to eliminate inefficiency in overtime work and efficiently utilize manpower in short-term.

Eurocode 4: A modern code for the design of composite structures

  • Stark, Jan
    • Steel and Composite Structures
    • /
    • 제5권4호
    • /
    • pp.327-343
    • /
    • 2005
  • The European Standards Organisation (CEN) has planned to develop a complete set of harmonized European building standards. The Eurocodes, being the design standards, form part of this total system of European standards, together with standards for fabrication and erection and product standards. After a period of experimental use of the ENV(European Pre Standard)-versions of the Eurocodes, these are now converted into official EN's (European Standards). Design of composite steel and concrete buildings and bridges is covered by Eurocode 4. An overview will be given of the historic development of Eurocode 4, the structure and contents of the EN version and the present status and planning for completion. The Eurocode treatment of some selected technical items will be presented in more detail.

4층(層)1절(節) 기둥을 이용한 MRS(Multi Ribbed Slab)공법 적용 (Application of MRS(Multi Ribbed Slab) System with 4Story-1Piece Columns)

  • 김정택;임주혁;전병갑;김용남
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.85-88
    • /
    • 2011
  • 우리나라의 주택환경에 적합하게 개발된 MRS공법을 기본으로 하여, 현장의 여건에 맞추어 4층1절 기둥을 활용함으로써 원가절감, 공기단축 등의 유형적 성과와 함께 현장의 작업환경 개선을 통한 시공성 향상이라는 무형의 성과를 함께 얻을 수 있었다.

  • PDF

Mechanism and Behavior Characteristic of Space Truss Unit for Post-tensioning

  • Kim, Jin-Woo;Kim, Sang-Jin
    • International Journal of Ocean Engineering and Technology Speciallssue:Selected Papers
    • /
    • 제6권1호
    • /
    • pp.38-43
    • /
    • 2003
  • This paper presents the results of a post-tensioning test and analysis of a pyramidal unit structure that is basic element for space structures. The behavior characteristics was analyzed and compared with the numerical analysis and the mechanism in test model was confirmed with geometrical analysis. The results of this paper show that the behaviors of space structures can be predicted in multi-directional Mero joint system. And the authors suggest the possibility of erection and shaping formation with comparatively small post-tensioning, and space structure with the mechanism should consider the nonlinear behavior due to large deformation.

  • PDF