• Title/Summary/Keyword: Erection Method

Search Result 124, Processing Time 0.03 seconds

The Erection Method of Starter Segment for Cable Stayed Bridge using Asymmetric System and Cable (케이블과 비대칭 구조를 이용한 사장교 주두부 시공 방법)

  • Cho, Seo-Kyung;Yoon, Tae-Seob;Jeong, Seung-Wook;Lee, Jea-Chan;Eo, Jun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1031-1038
    • /
    • 2002
  • In this paper the erection method of the Seohae Bridge starter is presented. The erection method of starter for cable stayed bridge was changed from conventional bracket supported erection to heavy lifting supported directly by stays. There was the need to reduce the erection time drastically. The cost saving was obtained as a bonus.

  • PDF

The Case Study on the Erection Method of Large Span Structures (대공간 건축물 Erection 공법에 관한 사례 조사 연구)

  • Jung, Hwan-Mok;Lee, Seong-Yeun;Jee, Suck-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.2 s.24
    • /
    • pp.97-104
    • /
    • 2007
  • Recently, the demand of the large span structures has been increasing. The large span structures include such a large scaled structures such as: the shell structure, the space frame structure, the membrane structure and the cable structure, etc. The large span structures are supposed to be confirmed and issued carefully at the initial process of the design besides the construction engineering aspects because of the structural specific cause that should solve and accomodate those large and wide space without columns. In the field of the large span structure construction, the erection construction method has been regarded as a major affected aspects on the construction cost, construction term, and stability. In the field of the large span structure construction, there are various construction method and system could be applied depends on the condition of the construction site and other circumstances such a major construction method as: the element method, the block method, the sliding method, the lift-up method and complexed method, etc. In this study, as the case study of the erection construction method of the large span structures, after survey and study that those existing large span structures construction cases which had applied and adopted the election construction method and analysis and classify into the Uoups by the size, span, ceiling height, structural system in odor to supply and suggest the data for the enhancement and development in the field of the erection construction method as a efficient structural solution of the large span structure construction.

  • PDF

A Study on the Erection Scheduling in the Shipbuilding Using Constraint Satisfaction Technique (제약 만족 기법을 이용한 조선 산업에서의 탑재 일정 생성에 관한 연구)

  • Kim, Ki-Dong;Jang, Yong-Sung
    • Journal of Industrial Technology
    • /
    • v.19
    • /
    • pp.91-99
    • /
    • 1999
  • The dock is the most important resource in shipbuilding yard. Among the shipbuilding schedules, the ship erection schedule in a dock is preferentially built. As results of it, the other schedules(machining in plants, block assembly, pre-painting, pre-rigging, painting and etc) are made. In this study, ship erection scheduling is formulated using ILOG Scheduler. This study is to develop a new problem solving method for ship erection to make an effective schedule based on Constraint Satisfaction Technique(CST).

  • PDF

The Case Study on the Erection Construction Method for Soft Retractable Roof Structures (연성개폐 지붕구조물 Erection 시공법에 관한 사례 연구)

  • Park, Keum-Sung;Kim, Hyung-Do;Kwak, Myong-Keun
    • Journal of Korean Association for Spatial Structures
    • /
    • v.16 no.4
    • /
    • pp.101-108
    • /
    • 2016
  • Lifting plan in the large spacial structure is an important factor influencing the efficiency and economy of the construction process. The purpose of this study was deriving the requirements for lifting techniques as the basic research in the double spoke wheel roof structure construction. In the lift up erection method, management plan of the interference error in the column and outer-ring was needed that occur during lifting roof structure. In the bent erection method, material usage reduction plan was required by the structural design of the temporary bent. In the hybrid erection method, lifting plan was needed that minimizes weather condition and crane usage. All lifting techniques were required Value Engineering model for reduction of cost and construction period.

A Study on the Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection (선체 블록의 물량 정보 생성 및 블록 탑재 시뮬레이션에 관한 연구)

  • Lee K.Y.;Roh M.I.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.2
    • /
    • pp.115-127
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed by using 2D drawings, data of parent ships, and design experiences. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection using the 3D CAD model, which was generated from the initial hull structural design system early developed by us, were proposed in this study. For this, a 3D CAD model for a whole hull structure was generated first, and the block division method for dividing the 3D CAD model into several building blocks was proposed. The generation method of the production material information for calculating the weight, center of gravity, painting area, joint length, etc. of a building block was proposed as well. Moreover, the simulation method of the block erection was proposed. Finally, to evaluate the efficiency of the proposed methods for the generation of the production material information and the simulation of the block erection, these methods were applied to corresponding processes of a deadweight 300,000 ton VLCC (Very Large Crude oil Carrier). As a result, it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

Load Leveling of Block Erection Network Using Diminution of Maximum Load Based on Constraint Satisfaction Technique (제약만족기법 기반의 최대부하감소를 통한 탑재 네크워크의 부하평준화)

  • Ryu, Ji-Sung;Kim, Hong-Tae;Park, Jin-H.;Lee, Byung-No;Shin, Jong-Gyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.41 no.5
    • /
    • pp.55-62
    • /
    • 2004
  • The logistics of entire shipbuilding process are integrated during the block erection process and the schedules for the erection process are made prior to. the schedules of any other processes. Therefore, efficient scheduling of the block erection process are one of most important issues in shipbuilding. There are only a few studies published regarding block erection scheduling methods because of its complexity and variability. This paper proposes an algorithm for diminution of maximum load based on constraint satisfaction technique. it is developed primarily for the efficiency in load leveling and applicability to the actual block erection process. The proposed algorithm is applied to actual block erection process and the results shows improvements in load leveling. It can also be used for the scheduling of fabrication, sub-assembly, and assembly to improve load leveling.

A Study on Economic Evaluation Method of Steel Erection Work using by Self-supported Steel Joint (자립형 철골 접합부를 이용한 철골설치 방식의 경제성 평가에 관한 연구)

  • Kim, Changki;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.3-7
    • /
    • 2009
  • Construction projects are being the skyscraper and the large size by limited site condition and developing construction technology. Therefore, Steel structure work is steadily increasing caused by easy to work and structural safety. However, steel-frame work has the large incidence of heavy accident potentially. Recently a research group has recently developed newly designed self-supported steel joint for enhancing safety of steel erection work. Before applying the steel joint in a construction site, economic evaluation should be performed. Thus, we proposed the method for measuring economic efficiency of the new steel joint and verified economic feasibility of the steel joint method through a case study. As a result, Steel erection method using by self-supported steel joint showed economic rather than the one using by H-beams.

  • PDF

A Basic Study of Crane Trajectory Distance Calculation for Sustainable PC Members Erection of Large Logistic Building (대형물류센터 PC부재 양중을 위한 크레인 궤적거리 산정 기초 연구)

  • Lim, Jeeyoung;Oh, Jinhyuk;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.77-78
    • /
    • 2023
  • As large logistics buildings have high floor heights and long spans, these buildings are designed as PC structures, and large cranes are used to lift PC members. PC erection planning can generally cause errors depending on the field engineer's experience. To solve this problem, a basic analysis method is needed to establish a systematic PC member erection plan. Crane work can be minimized if the trajectory is easily and quickly calculated according to the location of the crane and applied to the site. Therefore, the objective of this study is a basic study of crane trajectory distance calculation for sustainable PC members erection of large logistic building. In this study, a crawler crane commonly used for lifting PC members is limited. The trajectory distance for the PC erection plan was automatically calculated using the algorithm.

  • PDF

Experimental Investigation of Rotation-Up Erection for Keel Truss Spatial Structures (Rotation-Up 공법에 의한 킬 트러스 대공간 구조물의 Erection 실험에 관한 연구)

  • Kim, Cheol-Hwan;Chae, Won-Tak;Baek, Ki-Youl;Jung, Hwan-Mok
    • Journal of Korean Association for Spatial Structures
    • /
    • v.13 no.2
    • /
    • pp.57-66
    • /
    • 2013
  • There are a number of construction methods to build spatial structures such as erection method, Element method, Block method, Sliding method, Lift-up method and Push-up method. These methods are uneconomical and low accuracy, and require long construction duration because of a need of a scaffold or a tower crane to build spatial roof frame. In this study, the construction method to erect a truss structure was proposed as an economical and easy installation method. The proposed method has end hinges of keel truss and winches with horizontal cable. This method makes safe and accurate production and reduces construction duration because trusses are built on the floor or supporter. The goal of this study is to verify the validity of construction method by building scale model using the proposed method.

Study on Erection Block Positioning Using Genetic Algorithm (유전자 알고리즘을 이용한 탑재블록 위치제어에 관한 연구)

  • Shin, Sung-Chul;Lee, Jae-Chul;Kim, Soo-Young
    • Journal of Ocean Engineering and Technology
    • /
    • v.25 no.5
    • /
    • pp.76-81
    • /
    • 2011
  • In the shipbuilding industry, accuracy management is one of the keys for strengthening competitiveness. However, ship block errors are unavoidable in the block erection stage because of the deformation of the blocks. Currently, accuracy managers decide whether or not block corrections are needed, based on measured and designed point data. They adjust the locations of hull blocks so that the blocks are aligned with other assembly blocks based upon the experience of production engineers. This paper proposes an optimization process that can adjust the locations of ship blocks during the erection stage. A genetic algorithm is used for this optimization scheme. Finally, the feasibility of the proposed method is discussed using several case studies. We found that the proposed method can find the optimized re-alignment of erection blocks, as well as improve the productivity of the erection stage.