• Title/Summary/Keyword: Environmental Impact Investigation

Search Result 273, Processing Time 0.025 seconds

The Study on the Improvement of Environmental Assessment Method through Analysis of Environmental Investigation Results of Taean Thermal Power Plant (환경영향평가와 사후환경조사의 비교에 관한 연구 - 태안화력발전소 사례분석 -)

  • Chun, Sang-Ki;Lee, Sung-Chul
    • Journal of Environmental Impact Assessment
    • /
    • v.9 no.1
    • /
    • pp.61-74
    • /
    • 2000
  • This study compares the results of environmental impact assessment with the results of post-environmental investigation, using the case of Taean thermal power plant construction. The atmospheric and water qualities were not greatly changed before and after the construction of the power plant. However, the site of the highest concentration predicted by the atmospheric quality modeling in environmental impact assessment was different from that after operation of 4 power plants. There was also a difference in the diffusion range of thermal discharge water between the measured result(1km) and the predicted value(1.5km) with the model. Thus, environmental impact evaluation should be based on long-term (more than a year) environmental monitoring data. For the modeling of atmospheric quality and numerical thermal discharge water diffusion, appropriate models for each plant should be selected and the numerical modeling should be accompanied by computer simulation, wind tunnel test, etc. Moreover, environmental evaluation should focus more on the degree of impact on surroundings than the prediction of changes in surroundings caused by operation of plants.

  • PDF

A Case Study on the Comparison and Assessment between Environmental Impact Assessment and Post-Environmental Investigation Using Principal Component Analysis (주성분분석을 이용한 환경영향평가와 사후환경조사의 비교 및 평가에 관한 사례연구)

  • Cho Il-Hyoung;Kim Yong-Sup;Zoh Kyung-Duk
    • Journal of Environmental Health Sciences
    • /
    • v.31 no.2 s.83
    • /
    • pp.134-146
    • /
    • 2005
  • Environmental monitoring system has been adopted and supplemented as inspection measures for the quantitative and qualitative changes of environmental impact assessment (EIA). This study compares the results of environmental impact assessment with the results of post-environmental investigation using a correction and principal component analysis (PCA) in the housing development project. Correlation analysis showed that most of air quality variables including TSP, $PM_{10},\;NO_2$, CO were linearly correlated with each other in the environmental impact assessment and the post-environmental investigation. In the water quality, pH and BOD were well correlated with the DO and SS, respectively. As a result of correlation analysis in the noise and vibration, noise in day and night and vibration in day and night were related to each other between EIA and the post-environmental investigation. From the results of analysis of soil, Cu with Cd, Cu with Pb, and Cd with Pb were related to each other in EIA. Principal component analysis (PCA) showed a powerful pattern recognition that had attempted to explain the variance of a large dataset of inter-correlated variable with a smaller set of independent variables (principal components). Principal component (PC1) and principal component (PC2) were obtained with eigenvalues> 1 summing almost $90\%$ of the total variance in the all of the items(air, water, noise, vibration and soil) in EIA and post-environmental investigation.

A Study on Determinations of Survey Station in Marine Ecosystems Based by Impact Prediction of Environment Impact Assessment in Coastal Development Projects (연안개발사업 환경영향평가 영향예측 결과에 근거한 해양생태계 조사정점 선정방안에 관한 연구)

  • Cho, Beom-Jun;Maeng, Jun-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.5
    • /
    • pp.767-779
    • /
    • 2012
  • In case of executing surveys in marine ecosystems, the most important things are scientific selection measures of survey stations that can represent various ecosystems characteristics in subjected areas. The situations show a lot of differences that understand characteristics of marine ecosystems in targeted areas according to selection methods and positions in survey stations. Investigation ranges and station numbers in marine ecosystems are classified according to project characteristics and scales. But, currently a clear divisions or objective standards are not. Therefore, this study tried to provide selection measures of survey station in scientific and objective marine ecosystems through precise analysis among environmental impact statements of coastal development projects until now. In this study, impact scopes of marine ecosystems correspond to physical impact predictions by undertaking projects. Impact ranges were divided into three(physical impact ranges) coastal waters. In case of proposing numbers of survey stations according to this survey ranges, numbers of investigation stations due to minimum survey scopes in targeted projects applied 20~30% of all numbers in survey stations. Number of survey stations due to average investigation scopes within physical impact ranges applied 60~70% of all numbers in investigation stations. Numbers of survey stations due to maximum survey ranges within physical impact scopes applied 10~20% of all numbers in survey stations. So, improvement measures were deducted. Finally, according to prediction ranges in impact of various coastal development projects, several kinds of conclusions are suggested. And, it is thought to be able to use as fundamental database to select investigation stations in marine organisms through this study.

The Status Quo and Direction of Development of Environmental Impact Assessment System in Korea (우리나라 환경영향평가제도의 현주소와 발전방향에 관한 연구)

  • Choi, Joon-Gyu
    • Journal of Environmental Impact Assessment
    • /
    • v.9 no.2
    • /
    • pp.155-161
    • /
    • 2000
  • Environmental impact assessment(EIA), the only preventive system to manage development projects destroying the nature and ecosystem systematically, has been accomplished since the late 1970. EIA connotes intrinsic limits predicting uncertain future with the aid of present data. Furthermore, EIA has been used as not decision-making tools but regulatory means. Therefore, EIA has been criticized severely. In order to present direction of development of EIA, we analyzed problems of management of EIA, and concluded measures as follows are needed. 1. Control of investigation of environmental impact statements 2. Development of evaluating methods and publication 3. Fostering of institute for research and investigation of EIA 4. Construction of harmony of environment and development 5. Upgrade of state of proxy executing EIA.

  • PDF

Study on Promotion Plan of Railroad Construction Considering Environment (환경을 고려한 철도건설 추진방안에 관한 연구)

  • Sun, Hyo-Sung;Choi, Sang-Ki;Park, Young-Min
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1927-1930
    • /
    • 2007
  • This study describes the consideration of environmental impact in the preliminary environment investigation and EIA of railroad work. In the stage of preliminary environment investigation, it is important to choose the railroad line and location which minimizes the environmental impact due to the operation of railroad work, and EIA includes the prediction and reduction plan of environmental impact according to the construction and management of railroad.

  • PDF

Problems and Amelioration Measures of the Assessment on Terrestrial Ecosystem Field in Environmental Impact Statement (환경영향평가서에 나타난 육상생태분야의 평가에 대한 문제점과 개선방안)

  • Koh, Kang-Suk;Suh, Min-Hwan;Kang, In-Goo
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.1
    • /
    • pp.37-46
    • /
    • 1995
  • This study was carried out to find the problems of assessment on terrestrial ecosystem part in environmental impact analysis(EIA) and to suggest the proper amelioration measures by analyzing 19 environmental impact statements(EIS) published during the period from 1991 to 1994. The results obtained from this study were as follows. Field survey for the investigation of fauna and flora in project areas should be conducted at least 3 times a year and name of investigator should be written on the EIS clearly. Increase or decrease in degree of green naturality and productivity cannot be an absolute criteria for expressing the amount of changes in ecosystem. Evaluation for the ecosystems and their composition in project area is more important than presenting merely the increase or decrease in degree of green naturality and productivity. Alleviation measures in 19 EISs analyzed in this study were summarized into 6 types: They are establishment of landscape plan, transplanting of useful trees preservation of big tree and protected species, restoration and preservation of existent vegetation, establishment of soil conservation measures and diminution of the impact on animal. However, they were somewhat insufficient because they wouldn't suggest the alleviation measures in detail. The more positive counter-proposals are needed to decrease the impact of the project on terrestrial ecosystem.

  • PDF

Improvement Plan of Ocean Physics Assessment Technique for Power Plant Thermal Effluent (발전소 온배수에 의한 해양물리학적 평가기법 개선방안 연구)

  • Kim, Myeong-Won;Jo, Gwang-Woo;Maeng, Jun-Ho;Kang, Tae-Soon;Kim, Jongkyu
    • Journal of Ocean Engineering and Technology
    • /
    • v.28 no.3
    • /
    • pp.245-253
    • /
    • 2014
  • This research analyzed the current situation and problems with an environmental impact assessment to provide a rational ocean physics assessment technique for power plant thermal effluent. This research also tried to create an improvement plan for heated effluent diffusion impact assessment by examining the reporting regulations for environmental impact assessment, national and international evaluation guidelines, etc. In the case of evaluating the oceanographic impact of heated effluent discharged from power plants, a pre-investigation is necessary before a full-scale presentence investigation, to accurately predict and minimize power plant construction effects on the surrounding environments. Before this presentence investigation, moreover, an integrated presentence plan, which agrees with the business plan, effect prediction, and post-investigation, needs to be established. A sufficient summit investigation must be made, which considers climate changes, and new and additional power plant construction. For accurate long-term oceanic environmental change prediction, the credibility of effect prediction must be elevated by presenting an evaluation method that is categorized by numerical organization models, verification methods, result presentation, and other things. Furthermore, unproductive conflicts between the people involved in heated effluent evaluation should be reduced by these improvement plans.

A Method of Improving Air Quality Impact Assessment and Prediction (대기질 영향평가와 예측방법에 대한 개선방향)

  • Park, Jong-Kil;Won, Gyeong-Mee;Kim, Seong-Su
    • Journal of Environmental Science International
    • /
    • v.3 no.2
    • /
    • pp.77-88
    • /
    • 1994
  • When we conduct environmental impact assessment, main contents consist of summary, project outline, environmental conditions, environmental impacts due to the project, mitigation devices, and alternative measures of harmful impact on environment. In this Paper, to understand how they really conduct air quality impact assessment and prediction and examine their effectiveness, we considered the provisions and actual case of environmental impact assessment in Korea with that in Japan. As a result, we propose a method of improving air quality impact assessment and Prediction, such as reflection of the result in environmental impact assessment, detailed assessment focused on relatively important environmental impact elements, field measurement investigation over four season and seven sucessive days, the uniformity of units, the proper model development to predict environmental concentration and a biennial environmental impact assessment for ex post management.

  • PDF

Status and Improvement of the Mitigation Option to the Suspended Sediments in Coastal Development Projects - Focused on Silt Protector - (해안개발사업의 부유토사 저감방안의 현황 및 개선방안 - 오탁방지막을 중심으로 -)

  • Maeng, Jun-Ho;Cho, Kwang-Woo;Joo, Yong-Jun
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.5
    • /
    • pp.289-297
    • /
    • 2006
  • The study investigates the problems of silt protector used for mitigation measure of suspended sediments (SS) during coastal construction and provides their improvements based on the field investigation and analysis of the environmental impact assessment reports for the coastal development projects of Korea. The field investigation along west, east and south coasts of Korea reveals a variety of problems in the installation and management of silt protector solely used for the SS mitigation in Korea. Major problems include installation itself, low cost and quality of silt protector, and maintenance. These problems superimpose the effectiveness of silt protector in mitigating coastal environment impact. The present study provides the specific guideline on the project type needed for the installation of silt protector, installation standard and planning, maintenance and management. The study also suggests new mitigation options such as environmental window to limit the construction period and environmental dredger to compensate for the deficits of silt protector.

Overview of Environmental Impact Assessment and Environmental Protection Technology in Tunnel Construction (터널 건설에 따른 환경영향 평가 및 대응기술 개발 방향)

  • Bae Gyu-Jin
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.63-74
    • /
    • 2005
  • The environmental influence in tunnel construction is the drying of the ground water, the drop of the ground water level, and noise and vibration by tunnel excavation. The environmental influence can cause the change of natural ecosystem and the source of popular complaints. In case of popular complaints, the tunnel construction can be stopped or the construction period can be extended. Also, the financial loss may be reached to hundreds of billions won. The technology development to minimize the environmental influence in the tunnel construction is very important in order to control popular complaints and to preserve ecosystem. It should be required the investigation, the evaluation, and the assessment of environmental impact to reduce environmental influence in the tunnel construction. The objective of this research is to review the environmental impact assessment in Korea and to introduce the environmental protection technology which minimizes the environmental influence generated in the tunnel construction.

  • PDF