Recently, local governments have recognized river zones as leisure spaces and local festival venues, and hence, the pressure for developing these zones has increased significantly. However, given the unique functionalities of river zones and the time and costs associated with maintaining facilities and restoring damaged areas, a development plan must be selected carefully. To preserve river zones and to facilitate nature-friendly space utilization, this study focused on improving environmental impact assessment (EIA), which is an institutional implementation procedure for project plans. This study prepared a draft guide for EIA by providing an overview of the research background and survey outcomes, including the status of laws and regulations on river zones, development plans, and opinions on EIA. The results showed that because strategic EIA of basic river plans is important for district designation of river zones and the scope and direction of space utilization, it is necessary to establish a more meticulous business plan before reviewing and evaluating the mini EIA linked to the future implementation of a plan to derive a reasonable assessment. Additionally, this study provides a draft guide for EIA to evaluate the suitability of water-friendly facility construction plans considering the location characteristics and to reflect the factors that can reduce the environmental impacts during the mini EIA stage. In the future, we expect that the results of this study will serve as a foundation for establishing instructions and guides for the development of nature-friendly and water-friendly facilities in river zones during the establishment of plans.
In order to establish mainstreaming of climate change adaptation in policy, plan, program or project, we set up three kinds of implementation methods. The first is preparation of new law(tentatively called "Act on Climate Change Response") and independent implementation, the second is preparation of new law and two kinds of implementation in existing Environmental Impact Assessment system, and the third is integrated assessment in Environmental Impact Assessment system without new legal base. And we analyzed merits and demerits of suggested schemes, and specific contents of each method. Furthermore, we suggested overview of contents of new law and revised Environmental Impact Assessment law and related regulations.
Kim, Jong Sung;Kim, Choong Ki;Yoo, Keunje;Hwang, Sang-Il
Journal of Environmental Impact Assessment
/
v.26
no.6
/
pp.457-469
/
2017
In order to conserve soil functions to the highest degree in development projects, it is necessary to identify and manage specific area (so called soil management area) including soils with good or excellent functions. Therefore, in this work, we conducted a preliminary study how to identify soil management area in environmental impact assessment on development projects. To do this, quantitative evaluation was carried out on two example projects, using InVEST model considering a couple of soil functions, i.e., erosion control and carbon sequestration functions. Then, soil management area was identified through overlay analysis. The methodology developed in this study is able to be used widely for more detailed analysis with high resolution and furthermore overlay anaysis with other assessment items. For more perfect assessment, other soil fuctions needed to be taken into account into our methodology.
This paper proposes an improvement to differentiate assessment procedure for projects in consideration of their environmental impact as a means to improve efficiency in environmental impact assessment ("EIA") procedure. The targets of analysis were limited to lower impact projects. The current EA system in Korea has already attempted to introduce separate proceedings for certain projects.Tangible results from these efforts, however, have been limited. Other countries have adopted a "screening" system to determine whether EIA is applicable to a particular project, and if so, what procedure will be used therein. Therefore, this study suggests the screening as the process wherein need for EIA is determined with respect to projects which have undergone Prior Environmental Review System(PERS) and which appear to have comparatively negligible environmental impact. In this case, EIA can be omitted and the developer can then draft a mitigation plan instead. This study found that exempting certain projects deemed as having low environmental impact can considerably shorten the duration required for both environmental assessment and consultation, thereby improving efficiency. Other expected effects from the adoption of this screening include reduction in delays in project execution due to environmental assessments and reduced red tape through the provision of increased autonomy to developers and the approving authorities.
Actually, prediction formula of road traffic noise for EIA(Environmental Impact Assessment) has been used that proposed by National Institute of Environmental Research in 1999. The prediction formula, however, was calculated predicted noise level according to noise level producing on first floor, then needs to correct noise level at each floor in the case of apartment building. The investigation was carried out to calculate the correction coefficient for commonly using in EIA of large scaled apartment development areas. The noised level at each floor were measured from August 2001 to March 2002 at 31 investigation points of large scaled apartment development area in national wide. Measured data were divided and treated with 4 types as 3th floor, 5th floor, 7th floor and 10th floor and then the correction coefficients of each floor were calculated using by correlation formula according to each floor.
Kim, Tae Heum;Park, Sun Hwan;Hwang, Sang Il;Yang, Jihoon;Lee, Jai-Young;Hwang, Joung Bae
Journal of Environmental Impact Assessment
/
v.25
no.1
/
pp.51-62
/
2016
Recently, soil has been recognized as a crucially important resource that even can change the quality of life. Also, recent studies have gradually mentioned the importance of assessing soil impact induced by development plans and projects. In this study, after detailed soil assessement items were selected from our national environmental policies and international agreements, they were tested for the long-term dam construction planning in order to ensure more suitable implementation of strategic environment assessment(SEA). We found that soil resources can be impacted by diverse factors such as soil erosion, soil organic matters, soil moving, soil biodiversity, and others. Such detailed factors are found to be overlapped with the pervious EIA factors. Accordingly, additional studies would be required for finding out more reasonable connection between assessment factors during any SEA progress.
In this study, we individualize the clauses to sort out the troubled ones, draw up a interrelation model in order to visually organize the relations, and finally, suggest the desirable application idea. The interrelation model suggested in this study has been made based on the matrix method. On this matrix, we arranged the environmental factors on horizontal and vertical axis, and when we describe the relation of each factors, we set the horizontal axis as the base and divided the content into three grades : Fine, Medium, and Poor. In addition to that, we expressed those three grades into numerical value like 3 points for Level Fine, 2 points for Level Medium, and 1 point for Level Poor and then, we converted this numerical values into index numbers. We could classify the index numbers such as AS, PS, Q-index, P-index. AS is an index numerically shows the degree of giving environmental effect, PS is an index numerically shows the degree of receiving environmental effect, Q-index is an index shows the aggravate degree, and P-index shows the relation degree. The Q/P-index with large numbers has considerable effect on the environmental system, while the small numbered Q/P-index barely effect on the environmental system. Moreover, we classified the environmental factors into 5 levels(I~V) according to the relations between the Q-index and P-index. Level I is less affected by the environment and has more giving effect, while Level V is more sensitively affected by the environment and has more receiving effect, which we considered important. Therefore, we could come up with the result that if we consider the each level of factors when we evaluate the EIA, the result would be far more accurate and reliable since it contains mutual relation aspect of EIA. The suggested interrelation model in this thesis is presentable as one of those scoping system. We highly believe the need of scoping system in EIA and suggest the interrelation model as the alternative idea for scoping system.
Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.
Kim, Kyu Rang;Koo, Hae Jung;Kwon, Tae Heon;Choi, Young-Jean
Journal of Environmental Impact Assessment
/
v.20
no.3
/
pp.337-348
/
2011
Urban environmental problem became one of major issues during its urbanization processes. Environmental impacts are assessed during recent urban planning and development. Though the environmental impact assessment considers meteorological impact as a minor component, changes in wind environment during development can largely affect the distribution pattern of air temperature, humidity, and pollutants. Impact assessment of local wind is, therefore, a major element for impact assessment prior to any other meteorological impact assessment. Computational Fluid Dynamics (CFD) models are utilized in various fields such as in wind field assessment during a construction of a new building and in post analysis of a fire event over a mountain. CFD models require specially formatted input data and produce specific output files, which can be analyzed using special programs. CFD's huge requirement in computing power is another hurdle in practical use. In this study, a CFD model and related software processors were automated and integrated as a microscale wind environmental impact assessment system. A supercomputer system was used to reduce the running hours of the model. Input data processor ingests development plans in CAD or GIS formatted files and produces input data files for the CFD model. Output data processor produces various analytical graphs upon user requests. The system was used in assessing the impacts of a new building near an observatory on wind fields and showed the changes by the construction visually and quantitatively. The microscale wind assessment system will evolve, of course, incorporating new improvement of the models and processors. Nevertheless the framework suggested here can be utilized as a basic system for the assessment.
Brominated flame retardants have the market share of 40%, comparing others because of their low cost and highly effective retardation against the flame. However, their toxic effects in human and properties of the accumulation in the environments have been issued among the international organization such as EU, OECD and etc. It, therefore, was surveyed the classification, toxic effects, and the usage of Brominated flame retardants, the trends for their managements in the world and Korea, and their contaminated levels in Korean Peninsula. In addition, the management directions for them were proposed. Penta, octa, and deca-BDE among brominated retardants will seem to be prohibited by the regulation as a flame retardants for plastics in Europe because of their toxic effects. Although Penta and Octa BDEs was used marginally in Korea, deca-BDE was 27% of brominated flame retardants (49,050 ton) which had been used in 2002. However, risk assessment for brominated retardants might not launched in Korea, yet. These reports demonstrate that toxic brominated retardants such as PBDEs will be assessed for their usage and the level of contamination in the environment in the area of the point sources like the industrial areas, incinerators and etc. However, the law to regulate the hazardous chemicals seems not to be dictated the monitoring of their contamination in the environment. We, therefore, suggest how to evaluate and to monitor the toxic contaminants with EIA (Environmental Impact Assessment) and LCA (Life Cycle Assessment) system. Further, to establish the management system of BFRs (such as the monitering of contamination levels in environments, life cycle assessment, and risk assessment for the toxic chemicals), It can be recommended the law to deal with the method analyzing chemicals will be established, which contains QA/QC (Quality Assurance and Quality Control) to evaluate the analytic capability of the companies to prepare EIS (Environment Impact Statement) or other institutes for analyzing chemicals.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.