• Title/Summary/Keyword: Energy generator

Search Result 1,837, Processing Time 0.038 seconds

A comparison of speed control of various turbines according to power plant types (발전방식별 여러 가지 터빈의 속도제어 비교)

  • Choi, I.K.;Jeong, C.K.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2314-2316
    • /
    • 2001
  • The steam gererator which produces thermal energy from coal or gas is a very important device in power plants, including the turbine driving synchronous generator which transforms kinetic energy into electrical energy. The turbine and the generator are driven by many kinds of media according to the types of which power plants are classified into steam turbine generator, gas turbine generator, water turbine generator and so on. This paper introduces the overspeed protection as well as the various speed and load control methods of some types of turbines.

  • PDF

Development of a Small Sized Generator by Low Caloric Synthetic Gas from Coal Gasification (저발열량 석탄가스화 연료에 의한 소형발전시스템 개발)

  • 장준영;김태권;유영돈;윤용승;정석우
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2004.05a
    • /
    • pp.293-298
    • /
    • 2004
  • This paper presents the applicability of low caloric synthetic gas from coal gasification to small sized generator. Measurements on the combustion characteristics of synthetic gas from coal gasification as compared with LPG in constant volume combustion chamber have been conducted. A commercial LPG engine and generator are modified to use the low caloric synthetic gas from coal gasification as the engine fuel. We have demonstrated that the generator is well operated with various loads.

  • PDF

Optimal Design of Direct-driven PM Wind Generator for Maximum Annual Energy Production (연간 최대 에너지 생산량을 위한 직접구동 영구자석 풍력 발전기의 최적설계)

  • Cho, Myung-Soo;Lee, Cheol-Gyun
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.3-5
    • /
    • 2006
  • In this paper, annual energy production(AEP) of the wind generator system is analogized considering the regions of a variable wind speed and it is applied to optimal design of the PM wind generator for capturing maximum energy in the operating regions. In addition, internet parallel computing is used to loose excessive calculation times through optimization of the finite element analysis(FEA).

  • PDF

A vacuum tube based pulse generator for gas lasers (기체 레이저용 진공관식 펄스 전원)

  • Jin, Jeong-Tae;Cha, Byung-Heon;Nam, Sung-Mo;Lee, Heung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.221-223
    • /
    • 2002
  • This paper describes a vacuum tube based high voltage pulse generator for pulsed gas lasers. The pulse generator delivers 20 kV, 300 A pulse outputs with more than 10 kHz pulse repetition rates It can be controlled its Pulse width from 30 ns to 80 ns continuously without any hardware change.

  • PDF

Modeling of an Once Through Helical Coil Steam Generator of a Superheated Cycle for Sizing Analysis

  • Kim, Yeon-Sik;Sim, Yoon-Sub;Kim, Eui-Kwang
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.10a
    • /
    • pp.558-563
    • /
    • 1997
  • A thermal sizing code, named as HSGSA (Helical coil Steam Generator Sizing Analyzer), for a sodium heated helical coil steam generator is developed for KALIMER (Korea Advanced LIquid MEtal Reactor) design. The theoretical modeling of the shell and tube sides is described and relevant correlations are presented. For assessment of HSGSA, a reference plant design case is compared to the calculational outputs from HSGSA simulation.

  • PDF

Production of SCC Flaws and Evaluation Leak Behavior of Steam Generator Tubes (누설 및 파열실험용 SCC 결함 전열관 제작 및 누설거동 평가)

  • Hwang, Seong-Sik;Jung, Man-Kyo;Park, Jang-Yul;Kim, Hong-Pyo
    • Corrosion Science and Technology
    • /
    • v.8 no.5
    • /
    • pp.188-192
    • /
    • 2009
  • A forced outage due to a steam generator tube leak in a Korean nuclear power plant was reported.1) Primary water stress corrosion cracking has occurred in many tubes in the plant, and they were repaired using sleeves or plugs. In order to develop proper repair criteria, it is necessary to understand the leak behavior of the tubes containing stress corrosion cracks. Stress corrosion cracks were developed in 0.1 M sodium tetrathionate solution at room temperature. Steam generator(SG) tubes with short cracks were successfully fabricated with a restricted solution contact method. The leak rates of the degraded tubes were measured at room temperature. Some tubes with 100 % through wall cracks showed an increase of leak rate with time at a constant pressure.

Simulation Analysis and Development of Matlab/Simulink Model for Stand-alone Operation of Emergency Diesel Synchronous Generator-based Hybrid Energy System (비상용 디젤동기발전시스템기반 독립운전 하이브리드에너지시스템 모델 설정 및 시뮬레이션 분석에 관한 연구)

  • Hong, Won-Pyo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.1
    • /
    • pp.70-79
    • /
    • 2015
  • In this paper, enhanced stand-alone operation and development of Matlab/Simulink model of emergency diesel based hybrid energy system is presented. Simulations based on the remote community or islands were performed for PV-diesel-battery hybrid system. Modeling of PV-diesel-battery integrated system is done to perform under the solar radiation and load conditions on Matlab/Simulink platform. The models of diesel generator unit, battery energy storage system, PV and frequency-power control are developed and simulation studies have been carried out under various conditions using Matlab/Simulink and SimPowerSystem. It is demonstrated that the proposed system can provide reliable and good quality power to the customers in diesel synchronous generator-based hybrid energy systems.

Stand-Alone Wind Energy Conversion System with an Asynchronous Generator

  • Singh, Bhim;Sharma, Shailendra
    • Journal of Power Electronics
    • /
    • v.10 no.5
    • /
    • pp.538-547
    • /
    • 2010
  • This paper deals with a stand-alone wind energy conversion system (WECS) with an isolated asynchronous generator (IAG) and voltage and frequency (VF) control feeding three-phase four-wire loads. The reference generator currents are estimated using the instantaneous symmetrical component theory to control the voltage and frequency of an IAG system. A three-leg voltage source converter (VSC) with an isolated star/delta transformer is used as an integrated VSC. An integrated VSC with a battery energy storage system (BESS) is used to control the active and reactive powers of the WECS. The WECS is modeled and simulated in MATLAB using the Simulink and the Sim Power System (SPS) toolboxes. The proposed VF controller functions as a voltage and frequency regulator, a load leveler, a load balancer and a harmonic eliminator in the WECS. A comparison is made on the rating of the VSC with and without ac capacitors connected at the terminals of an IAG. Simulation and test results are presented to verify the control algorithm.

Status of 3 MW PM Synchronous Generator Development Project for Off-shore WECS (3MW 해상풍력용 영구자석 동기발전기 개발현황)

  • Kim, Dong-Eon;Han, Hong-Sik;Lee, Hong-Gi;Jung, Yung-Gyu;Suh, Hyung-Suck;Chung, Chin-Wha
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.423-426
    • /
    • 2007
  • Pohang Wind Energy Research Center (PoWER-C) is developing a 3 MW Radial Flux Permanent Magnet (RFPM) Synchronous Generator for offshore Wind Energy Converter (WEC). The rotor rpm is 15.7 and the gear ratio is set to be 92.93. The nominal generator rpm at the rated load is about 1459. To reduce the switching loss in the power electronics, the maximum frequency is limited to 100 Hz. This requirement limits the number of pole to six or eight. Permanent magnet excitation is assumed for higher energy yield and higher efficiency. In this report, the requirements and the first efforts for the physics design are described.

  • PDF

Optimal Design of Permanent Magnet Wind Generator for Maximum Annual Energy Production (최대 연간 에너지 생산을 위한 영구자석형 풍력발전기의 최적설계)

  • Jung, Ho-Chang;Jung, Sang-Yong;Hahn, Sung-Chin;Lee, Cheol-Gyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.12
    • /
    • pp.2109-2115
    • /
    • 2007
  • The wind generators have been installed with high output power to increase the energy production and efficiency. Hence, Optimal design of the direct-driven PM wind generator, coupled with F.E.M(Finite Element Method) and Genetic Algorithm(GA), has been performed to maximize the Annual Energy Production(AEP) over the whole wind speed characterized by the statistical model of wind speed distribution. Particularly, the parallel computing via internet web service has been applied to loose excessive computing times for optimization. The results of the optimal design of Surface-Mounted Permanent Magnet Synchronous Generator(SPMSG) are compared with each other candidates to verify the usefulness of the maximizing AEP model.