• Title/Summary/Keyword: Energy Plus simulation

Search Result 120, Processing Time 0.026 seconds

Characteristics and Modeling Analysis of Entrained Flow Gasifiers (분류층 가스화기 특징 및 공정모사 분석)

  • Yoo, Jeongseok;Kim, Youseok;Paek, Minsu
    • New & Renewable Energy
    • /
    • v.9 no.3
    • /
    • pp.20-28
    • /
    • 2013
  • The gasification process has developed to convert coal into the more useful energy and material since decades. Despite the numberous design of ones, entrained flow gasifier of the major companies has had an advantage on the market. Because it has a merit of full-scale and high performance plant. In this paper, the gasification technologies of GE energy, Phillips, Siemens and Shell have been reviewed to compare their characteristics and a high performance gasification process was suggested. And the simulation model of gasifiers using Aspen Plus offered the quantitative comparison data for difference designs. The simulation results revealed the poor performance of the slurry feed than dry design. The corresponding cold gas efficiency of 77% is much lower than the 80.3% for the dry feed cases. The exergy analysis of the difference syngas quenching system showed that chemical quenching is superior to another. The results of analysis recommend the two stage gasifier with dry multi-feeder as the energy effective design.

A Study on the Application of Simulation-based Simplified PMV Regression Model for Indoor Thermal Comfort Control (실내 온열환경 쾌적 제어를 위한 단순 PMV 회귀모델의 적용에 관한 시뮬레이션 연구)

  • Kim, Sang-Hun;Yun, Sung-Jun;Chung, Kwang-Seop
    • Journal of Energy Engineering
    • /
    • v.24 no.1
    • /
    • pp.69-77
    • /
    • 2015
  • The PMV regression analysis was conducted for this model based on a database of the PMV variables. PMV regression model simplification was completed through sensitivity and data analysis. The simplified PMV regression model's and Fanger PMV model was confirmed through MAE and RMSE. And the EMS in EnergyPlus was used to establish a simplified PMV regression analysis-based thermal comfort control. Also, the thermal comfort controls based on simplified PMV model and the Fanger PMV model were applied to the building model, it was confirmed that both controls met the thermal comfort range in more than 90% of cases during the air conditioning period.

Joint Transceiver Design for SWIPT in MIMO Interference Channel (MIMO 간섭채널에서 정보와 전력의 동시 전송 (SWIPT)을 위한 송수신기 설계)

  • Seo, Bangwon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.5
    • /
    • pp.55-62
    • /
    • 2019
  • In this paper, we consider K-user multiple-input multiple-output (MIMO) interference channel and present a transceiver design for simultaneous wireless information and power transfer (SWIPT) systems. In addition, we consider a SWIPT system where an information decoding receiver and an energy harvesting receiver are co-located at the same receiver. In the proposed scheme, signal-to-leakage plus noise ratio (SLNR) is used as a cost function and a transceiver is designed to satisfy the threshold of the harvested energy. More specifically, transmitter precoding vector, receiver filter vector, and power spitting factor are simultaneously designed to maximize SLNR with a constraint on the harvested energy. Through computer simulation, we compare the signal-to-interference plus noise ratio (SINR) performance of the proposed and conventional schemes. When a special condition among the number of transmit antennas, receive antennas, and users is satisfied, the proposed scheme showed better SINR performance than the conventional scheme at low signal-to-noise ratio (SNR) range. Also, when the condition is not satisfied, the proposed scheme showed better performance than the conventional scheme at all SNR range.

Component Analysis of Thermally Activated Building System in Residential Buildings

  • Chung, Woong June;Lee, Yu Ji;Yoo, Mi Hye;Park, Sang Hoon;Yeo, Myoung Souk;Kim, Kwang Woo
    • Architectural research
    • /
    • v.16 no.4
    • /
    • pp.203-210
    • /
    • 2014
  • The packaged terminal air conditioner, the typical cooling system for the residential buildings, consumes a large amount of electricity in a short period time during peak hours. In order to reduce the peak load and conserve the electricity, the thermally activated building system can be used as a secondary system to handle the partial cooling load. However, the thermally activated building system may cause condensation and under-cooling. Thus, design of both systems should be performed with careful investigation in characteristics of both systems to amplify the advantages. Since the thermally activated building system has the time-delay effect which may cause under-cooling, the system is designed to handle the base load of the building. Hence, simple simulation with EnergyPlus was performed to observe the characteristics of cooling load in residential buildings. Once the possible range of the load handling ratio of the thermally activated building system was decided, characteristics of system was analyzed in terms of hardware component and operation parameters. The hardware components were analyzed in plant and system aspects and the operation parameter was evaluated in the thermal comfort aspect. As the load handling ratio increased, the thermal comfort increased due to the lower radiant mean temperatures. Within the range of thermal comfort, the several adjustments were made in setpoint temperature and electricity consumptions of difference cases were observed to decide which components and parameters were important for designing the systems.

A Study on TPS based on ATO for Driverless LRT (ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구)

  • Lee, Chang-Hyung;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1132-1137
    • /
    • 2008
  • Automatic Operation based on ATO (Automatic Train Operation) is necessary for driverless Light Rail Transit business. When this kind of driverless LRT operation plan is made, TPS (Train Performance Simulation) is traditionally simulated at all-out mode and coasting mode based on manual operation. Commercial schedule speed equals to all-out speed minus $9{\sim}15%$ make-up margin. Coasting mode TPS simulation is also run at commercial schedule speed to calculate run time and energy consumption. But TPS based on manual operation should make an improvement on accuracy in case of driverless LRT operation Plan. In this paper, new fast mode TPS simulation using ATO pattern is proposed and show near actual ATO result. The actual ATO pattern can be accurately simulated with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. Normal mode TPS simulation for commercial schedule speed can be designed to have fast mode trip time plus 3 seconds/km margin recommended by korean standard LRT specification.

  • PDF

Analytical Study on the Optimal Operating Control of A Hybrid Geothermal Plant (지열복합 열원가기 최적운전채어에 관한 해석적 연구)

  • Jeon, Jong-Ug;Park, Jong-Sam;Myung, Woo-Ho;Kim, Young-Ki;Kim, Yong-Chan
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.6 no.2
    • /
    • pp.1-7
    • /
    • 2010
  • The objective of this study is to find the optimal control algorithm of a hybrid Plant, which is combined by renewable energy plant of the GSHP(Geothermal Source Heat Pump) and the normal plant (Chiller, boiler). The work presented in this study was carried out in the EnergyPlus(Version 2.0). The EnergyPlus was modified in order to simulate the hybrid plant. The plant system was controlled by the load-range-based operation in which schemes select a user specified set of equipment for each user specified range of a particular simulation condition. In the use of the load-range-based operation, four kind of control cases were defined and simulated in order to obtain the optimal control algorithm of the hybrid plant. The result showed that the Case 2 was the optimal control algorithm which used the GSHP as a base operating plant and the normal plant as an assistant operating plant. Even though the normal plant was operated in full load and the renewable energy plant of the GSHP was operated in partial load, the annual energy consumption of the normal plant was larger than that of the GSHP plant.

A study on the Optimization of Hydrogen Production and Purification System for PEMFC (PEMFC에 사용되는 수소 생산 및 정화 기술 최적화 연구 )

  • SEOK KYUN KO;SANGYONG LEE
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.34 no.1
    • /
    • pp.1-7
    • /
    • 2023
  • A fuel handling process combined with a pressure swing adsorption system (PSA) was simulated to produce pure hydrogen with a purity greater than 99.97%. The simulation consists of two parts. The fuel processing part consisting of reformer and water-gas shift reaction was simulated with Aspen plus®, and the hydrogen purification part consisting of PSA was simulated with Aspen Adsorption®. In this study, the effect of reformer temperature and pressure on the total hydrogen production yield was investigated. Simulations were performed over a temperature range of 700 to 1,000℃ and a pressure range of 1 to 10 bar. The total hydrogen production yield increased with increasing temperature and decreasing pressure. The maximum hydrogen yield was less than 50% in the simulation and will be lower in the real process.

Performance Model and Fuel Utilization Analysis of 7 kW MCFC using ASPEN-PLUS (ASPEN-PLUS를 이용한 7 kW MCFC의 성능 모델 및 연료 이용률 분석)

  • Kang, B.S.;Ahn, K.S.;Koh, J.H.;Lim, H.C.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07a
    • /
    • pp.55-57
    • /
    • 1998
  • Molten carbonate fuel cell (MCFC) power plant is expected to be one of the most promising future power generation system for the electric utilities because of its high efficiency, environmental suitability and capability of using coal as fuel. To get such attractive performance, it is necessary to consider optimizing operation and gas recycling system. This paper describes the simulation results of 7 kW MCFC stack in KEPRI and the effects of the three possible gas recycling operations, i.e. cathode gas recycling, anode gas recycling, anode gas recycling with catalytic burner.

  • PDF

A study on method for improving renewable energy supply ratio for the school building applied PV system (태양광발전 시스템이 설치된 학교건물의 신재생에너지 공급비율 증가방안에 관한 연구)

  • Kim, Seok-Hyun;Lee, Yong-Ho;Hwang, Jung-Ha;Cho, Young-Hum
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.2
    • /
    • pp.42-49
    • /
    • 2013
  • Recently, the attention to renewable energy has increased globally because of the environmental issue and the global energy crisis. Accordingly, south korea is focused on increasing the renewable energy usage. And the government enforced a law to the public buildings to install the renewable energy facilities. In this study, the building to evaluate renewable energy consumption and supply ratio was selected. This building has 9.79% of renewable energy supply ratio by PV system. In this study, the method for improving renewable energy supply ratio was analyzed using additional PV system. And The 5 methods to increasing electricity were evaluated. The method of increase 4.24 times PV arrays area is most efficient way to increase the renewable supply ratio. The case 1, show that the increasing renewable energy supply ratio of 39.2% compared to exsiting PV system. The result of the above, consider the additional supply of renewable energy.

BUILDING INFORMATION MODELING (BIM)-BASED DESIGN OF ENERGY EFFICIENT BUILDINGS

  • Cho, Chung-Suk;Chen, Don;Woo, Sungkwon
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.1-6
    • /
    • 2012
  • With the increased awareness of energy consumption as well as the environmental impact of building operations, architects, designers and planners are required to place more consideration on sustainability and energy performance of the building. To ensure most of those considerations are reflected in the building performance, critical design decisions should be made by key stakeholders early during the design development stage. The application of BIM during building energy simulations has profoundly improved the energy analysis process and thus this approach has gained momentum. However, despite rapid advances in BIM-based processes, the question still remains how ordinary building stakeholders can perform energy performance analysis, which has previously been conducted predominantly by professionals, to maximize energy efficient building performance. To address this issue, we identified two leading building performance analysis software programs, Energy Plus and IES (IES ), and compared their effectiveness and suitability as BIM-based energy simulation tools. To facilitate this study, we examined a case study on Building Performance Model (BPM) of a single story building with one door, multiple windows on each wall, a slab and a roof. We focused particularly on building energy performance by differing building orientation and window sizes and compared how effectively these two software programs analyzed the performance. We also looked at typical decision-making processes implementing building energy simulation program during the early design stages in the U.S. Finally, conclusions were drawn as to how to conduct BIM-based building energy performance evaluations more efficiently. Suggestions for further avenues of research are also made.