상수관망의 수리해석 방법은 demand-driven analysis와 pressure-driven analysis로 구분할 수 있으며, 급작스런 용수수요증가, 관거파괴 등과 같이 비정상운영상태인 용수공급시스템의 수리모의에 demand-driven analysis를 사용할 경우 비현실적인 결과를 줄 수 있다. 특히 현재 국내에서는 비상상황에 대한 비상급수계획 수립 시에 demand-driven analysis를 사용하고 있으나, pressure-driven analysis의 적용을 통한 비상급수계획의 적정성 평가가 수행되어야 할 것이다. 본 연구에서는 pressure-driven analysis를 위해 최근 개발된 WaterGEMS모형을 이용하여 2007년 수도정비 사업을 계획한 J시의 비상급수계획의 적정성을 평가하였다. 적용 결과 소블럭의 용수공급 안정성 향상을 위한 방안 제시가 가능하였으며, 수립된 비상급수계획이 적합한 것으로 판단되었다.
As the water supply facilities are recently getting larger, the domestic waterworks become multi-regional water supply system. Large water supply facilities generally consist of the intake pumping station, water treatment plant and water supply/distribution facilities. Although the pumping stations and the pipeline systems are used to pump up water, it often happens pipeline damage and flooding accident by the water hammer. In this paper, the intake pumping station is guaranteed by both the computer simulation and the field test analysis. This study is contributed to the safe operation program for the pumping station in which results of the adjustment on the safety plan of the pumping station, the air valve and the valve closing time.
Water supply facilities are recently getting larger according as domestic waterworks become multi regional water supply system. Large water supply facilities generally consist of the intake pumping station, water treatment station and water supply & distribution facilities. Although pumping stations and pipeline systems are used to pump up water, it often happens pipeline damage and flooding accident by the water hammer. As a result of this study, a pumping station is guaranteed by the computer simulation and field test analysis. Therefore these are contributed safety operation in pumping station through adjustment of the pumping station safety plan, air valve and valve closing time.
상수관망시스템의 운영목적은 탄력성을 높여 각종 비정상상황에 유연하게 대처할 수 있는 방향으로 점차 변화하고 있으며 이에 따라 비정상상황에 따른 단수구역 발생에 대한 사후대책 대비를 통한 탄력성 향상이 필수적이다. 이를 위한 가장 효율적인 방법은 수계전환에 따른 비상공급 수원확보이며, 비상관로를 통하여 인접 배수블록으로부터 단수된 구역에 용수를 공급할 수 있다. 성공적인 비상연계 운영을 위해서는, 수리학적 해석을 통하여 시공간적인 측면에서의 공급성능을 평가해야 한다. 비상연계 시, 공간적인 범위를 결정하는 주요 요소는 관경, 위치 및 관저고와 같은 비상관로에 해당하는 제원이며, 시간적인 범위를 결정하는 주요 요소는 연계배수지의 용량과 정수장에 공급 가능한 추가수량이다. 본 연구에서는 A시의 상수관망에 대하여 배수지 1지에 문제가 발생하여 타 배수지들로부터 비상연계를 받는 시나리오에 대하여 모의를 진행하였다. 배수지의 저류량 및 유입량에 대한 모의를 위하여 Advanced-Pressure Driven Analysis 모형을 사용하였으며, 수리해석 결과를 바탕으로 공급범위기준지표 및 공급시간기준지표를 산정하여 연계공급성능에 대한 다각도적인 평가를 진행하였다. 이에 비상연계에 대하여 소비자들이 실제 체감하는 공급성능을 시공간적인 측면에서 파악할 수 있었으며, 설계제원의 타당성에 대한 검토가 가능하였다. 이는 비상연계 성능향상을 위한 구조적 대책 및 비구조적 대책 수립에 대한 의사결정에 용이하게 활용될 수 있을 것으로 기대한다.
The goal of the present research was to develop a mean to determine indices of drought warning and emergency necessary to manage drought and establish water supply contingency plan for the municipal and industrial water supply system in urban areas. To do this, we worked on the Sayun catchment which is the main water source of Ulsan and used measured hydrologic data (storage, inflow, supply, outflow) from 1980 to 1996. The indices of drought calculated by the method of Phillips drought index based only on monthly precipitation do not pertinently represent drought phenomena in case water supply is from dam or reservoir in an urban area. Therefor, we developed the drought index technique including inflow, storage, outflow and supply which are the chief factors of drought management. The result showed that the method of Phillips drought index considering the capacity of water supply was excellent when applied to practical drought phenomena.
수자원 시스템의 중요한 기능 중 하나는 갈수 피해를 방지하는 것이다. 그러나 댐에 의한 용수공급계획은 이용 가능한 자료의 한계, 조사 자료의 부정확, 해석 방법의 부적합 그리고 기후변화 등의 요인에 의해 불확실성이 존재한다. 실제 운영과정에서는 이수안전도를 초과하는 이상가뭄 발생 시 용수부족이 발생하여 제한급수 등 정상적인 물이용이 불가능해진다. 그러나 우리나라는 가뭄에 의해 물부족이 발생할 경우 대체수원개발 등 딱히 마땅한 대처수단이 없으며, 갈수대책을 위한 수원확보도 미미한 실정이다. 특히 이상가뭄에 의한 피해정도를 고려하여 용수공급효과를 평가할 수 있는 기준이 마련되어 있지 못해 현실적인 대책을 마련하기 어려운 실정이다. 본 연구는 기 제시되어 있는 용수부족지표를 이용하여 기존 다목적댐의 저수(低水) 용량을 비상용수 공급원으로 활용하는 방안에 대하여 검토하였다. 기존 다목적댐의 유량자료를 이용하여 용수부족 사상을 분석하고 용수부족 감소효과를 평가하였다. 적용 결과 임하, 대청, 합천 및 남강댐의 경우 이상가뭄에 매우 취약한 것으로 나타났으며 가뭄대비용 비상용수의 추가 확보가 필요한 것으로 나타났다.
기후변화에 관한 정부 간 협의체의 5차 평가보고서에 기술된 바와 같이 기후변화로 인해 이상기후 현상의 발생빈도가 증가하고 있다. 이에 홍수, 가뭄 등 수자원과 관련된 재해의 발생빈도 또한 증가하고 있다. 이 중 가뭄은 용수공급에 가장 큰 영향을 미치는 재해이다. 최근 우리나라의 가뭄피해 사례를 보면 가뭄의 강도와 발생빈도가 증가하는 것을 확인할 수 있다. 따라서 안정적인 용수공급을 위한 수자원 확보 기술이 필요한 시점이다. 수자원장기종합계획에서는 수자원에도 예비율 개념의 대책 도입이 필요하다고 언급한 바 있다. 현재 국내 대부분의 다목적댐들은 평상시 용수공급에 이용되는 이수용량 외에 비상시 활용 가능한 비상용량을 확보하고 있지만 명확한 활용 기준이 없어 이를 활용하지 못하고 있는 실정이다. 따라서 본 연구에서는 안정적인 용수공급을 위해 비상용량을 예비량으로 활용하는 방안에 대해 연구하였다. 기후변화의 영향을 고려하기 위해 AR5 기반 수문시나리오를 저수지 모의운영 모형의 유입량 자료로 이용하였다. 비상용량과 용수공급 조정기준의 활용 조건에 따라 저수지 모의 운영을 실시하였고 모의 결과를 이용하여 다목적댐별 적정 예비율을 산정하였다.
Due to global climate change, mega-droughts have occurred frequently. Since long-term droughts make it difficult to secure the water resources, water supply needs to be restricted in a reasonable manner. In the event of limited water supply, the waterworks need to develop a restricted water supply strategy. This study showed that analyzing daily water supply could be used to respond to the first stage of a drought. According to an analysis of Korea's major water authorities, there was about 7~21% of room for daily minimum water supply in case of a drought. Restricting the water supply by lowering pressure is a good strategy for local water authorities with high water leakage rate since leakage is inversely dependent with pressure. For this method, it is necessary to quantify water deficiency and pressure at each node using a simulation. Since DDA-based software is not possible to predict changes in demand at nodes with pressure reduction, WaterGEMS, a PDA software, was used to quantitatively predict water shortages and pressures at each node. Locations where water is deficient need to install booster pumps or to be dispatched with water tank truck and bottled water. Without these support, lowering pressure could not be an option for water works. This paper suggests a method for waterworks to plan a drought by lowering pressure to restrict water supply using daily water supply analysis and PDA based simulation.
In this study, the priority of risk factors in supplying water through water supply pipeline network was evaluated by PROMETHEE and ANP multi-criteria decision analysis. We chose 'corrosion', 'burst' and 'water pollution' in pipe as major reference criteria and selected eight risk factors to evaluate the priority, and then we compared the results of PROMETHEE with those of ANP. We also analyzed the results of the sensitivity analysis by changing the weights and parameters of preference functions in PROMETHEE. We investigated the possibility of integrating two methods by using the results of ANP as the weights of preference function in PROMETHEE. The priority of risk factors for supplying municipal water which is evaluated by this study may provide basic data to establish a contingency plan for accidents, or to establish the specific emergency response procedures.
본 연구에서는 안전하고 원활한 용수공급을 목적으로 하는 상수도관망시스템의 오염예방 및 위험관리를 위한 통합의사결정시스템의 기본구조를 제시하고 유럽과 미국에서 널리 사용되고 있는 다기준 의사결정기법인 PROMETHEE와 ANP를 적용해 상수도관망의 이상징후 판정을 위한 위험요소들의 우선순위를 평가하였다. 문제 구성을 위하여 pH 잔류염소농도, 유량, 수압, 전기전도도, 탁도, 블록누수량, 수온을 자료항목으로 선정하였고 관부식, 관파열, 관내수질오염을 평가기준으로 하여 PROMETHEE와 ANP의 결과를 비교 분석하였다. 본 연구에서 제시한 상수도관망의 위험요소 평가결과는 위기상황 대처방안시스템 구축시 사고대응 제어알고리즘 설계의 기초자료가 될 수 있을 것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.