건축물의 비상전원 적용실태 및 자가발전설비의 안전 운전 모델에 관한 연구 (Analysis on Emergency Power Supplies in Buildings and a Model for Safe Operation of the Emergency Power System)

  • 이원강;최충석
    • 한국안전학회지
    • /
    • 제27권3호
    • /
    • pp.49-56
    • /
    • 2012
  • The purpose of this paper is to present a model for operating an emergency power system(EPS) that can secure a sufficient power supply used in case of a fire by analyzing the status of power supplies for emergency and firefighting operations. Investigations on the one of the causes of the operational failure of firefighting systems show evidence of EPS. Generally, when power to a building is interrupted, EPS supplies the emergency load(excepted firefighting load) first. When a power outage and a fire occur simultaneously, the EPS must be able to supply both the emergency load and the firefighting load, especially the firefighting load to the end. However, in order to save construction costs, emergency power generators in apartment, commercial, and business buildings can satisfy only one of the required loads. In cases like this, when a power outage and a fire occur simultaneously, there is a danger of firefighting equipment not operating due to insufficient power supply from the emergency generator. Therefore, an EPS must have a reserved firefighting power that can supply both the firefighting and the emergency load. Such EPS, when faced with a danger of an overload, will shut down the supply to all or part of the emergency load, thus securing a continuous power supply to the firefighting equipment. The generator power system with reserved firefighting power (RFP) will also have an indicator to show that the selective control is being used. General power generation systems for emergency load and firefighting load were found to have a demand factor of 50-60% with a lump. However, when installing an EPS, the builders must choose the higher demand factor suggested according to the official approval demand factor of the building.

소방전원보존형 발전기(RFP)의 작동 방법에 관한 연구 (A Study on the Operation Method of Emergency Power System with Reserved Firefighting Power (RFP))

  • 이원강;최충석
    • 한국화재소방학회논문지
    • /
    • 제26권3호
    • /
    • pp.29-34
    • /
    • 2012
  • 본 논문에서는 소방전원 및 소방전원 부족시 용량 보완을 위한 인터록 시스템의 한계점 등을 분석하고 소방전원 보존형 발전기(RFP)의 작동방법 등을 제시하여 화재와 같은 상황에 효율적으로 대응할 수 있는 방법을 제시하는데 있다. 소방전원보존형 발전기에서 일괄제어방식은 발전기에 과부하가 걸리면 소방전원보존용 제어기에서 신호를 발신하여 소방부하는 남겨두고 비상부하용 주차단기를 일괄 차단하고, 발전기가 마지막까지 소방부하에 전원이 공급되도록 한 시스템이다. 순차제어방식은 과부하가 걸리면 소방전원보존용 제어기에서 1차 신호를 발신하여 설정된 비상부하의 1단계 부하를 차단한다. 그리고 지속적인 감시 상태에서 소방부하가 증가하여 발전기가 다시 과부하가 걸리면 제어기에서 2차 신호가 발신하여 비상부하의 2단계 부하를 차단하는 시스템이며 각각의 작동 상태를 표시하는 표시장치를 가진다.

소방용 비상발전기의 현장부하시험을 위한 20 kW급 ESS 부하시험장치 모델링과 구현에 관한 연구 (A Study on the Implementation and Modeling of 20kW Scale ESS Load Test Device for Emergency Generator)

  • 최승규;이후동;최성식;페레이라 마리토;노대석
    • 한국산학기술학회논문지
    • /
    • 제20권9호
    • /
    • pp.541-550
    • /
    • 2019
  • 소방용 비상발전기는 화재 시 인명과 재산을 보호하는 소방 시설에 전원을 공급하는 중요한 설비이다. 이러한 중요성에 따라 관련 법규에서는 의무적으로 비상발전기에 비상용 부하를 연결하여 시험하도록 규정하고 있다. 그러나 실 계통에서는 비상전원계통의 부하운전 시험을 위해 상용 전원을 차단하는 경우 저압기기의 파손, 병원과 같은 중요시설의 응급부하 정지 등 심각한 문제점이 발생할 수 있어, 무부하로 비상발전기를 형식적으로 시험하고 있는 실정이다. 따라서, 본 논문에서는 상기의 문제점을 개선하기 위하여, 상용 전원의 차단 없이 비상발전기에 전기저장장치를 연계하여, 비상용부하의 동작특성과 동일하게 ESS가 충전동작을 수행함으로서 비상발전기의 성능 및 상태를 시험할 수 있는 방안을 제시한다. 또한, 배전계통 상용 해석 프로그램인 PSCAD/EMTDC를 이용하여, 비상발전기, 비상용부하, ESS 부하시험장치로 구성된 비상전원계통의 모델링을 제시하고, 20kW급 ESS 부하시험장치를 구현하여, 이를 바탕으로 다양한 시나리오에 따른 시뮬레이션과 시험을 수행하여 본 논문에서 제안한 ESS 부하시험 장치와 모델링의 유용성을 확인한다.

Research on Line Overload Emergency Control Strategy Based on the Source-Load Synergy Coefficient

  • Ma, Jing;Kang, Wenbo;Thorp, James S.
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권3호
    • /
    • pp.1079-1088
    • /
    • 2018
  • A line overload emergency control strategy based on the source-load synergy coefficient is proposed in this paper. First, the definition of the source-load synergy coefficient is introduced. When line overload is detected, the source-load branch synergy coefficient and source-load distribution synergy coefficient are calculated according to the real-time operation mode of the system. Second, the generator tripping and load shedding control node set is determined according to the source-load branch synergy coefficient. And then, according to the line overload condition, the control quantity of each control node is determined using the Double Fitness Particle Swarm Optimization (DFPSO), with minimum system economic loss as the objective function. Thus load shedding for the overloaded line could be realized. On this basis, in order to guarantee continuous and reliable power supply, on the condition that no new line overload is caused, some of the untripped generators are selected according to the source-load distribution synergy coefficient to increase power output. Thus power supply could be restored to some of the shedded loads, and the economic loss caused by emergency control could be minimized. Simulation tests on the IEEE 10-machine 39-bus system verify the effectiveness and feasibility of the proposed strategy.

부하관리사업자의 비상시 부하제어량 배분 알고리즘 개발 (Development of the Load Curtailment Allocation Algorithm for Load Aggregator in Emergency Demand Response)

  • 정구형;김진호;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권8호
    • /
    • pp.466-471
    • /
    • 2004
  • Electricity industries throughout the world are undergoing unprecedented changes. As a result, these changes lead to the separation of traditional integrated utilities and the introduction of competition in order that increase efficiency in electricity industry. Direct load control (DLC) system in competitive electricity market has a hierarchical interactive operation system, therefore, its control logic is also applied by bilateral interactive method that interchanges information related to interruptible load between operation hierarchies. Consequently, load curtailment allocation algorithm appropriate for new DLC system is required, and based on interchanged information, this algorithm should be implemented by most efficient way for each operation hierarchy. In this paper, we develop the load curtailment allocation algorithm in an emergency for new DLC system. Especially, the optimal algorithm for load aggregator (LA) that participates in competitive electricity market as a main operator for load management is developed.

비상시 선로혼잡 해결을 위한 직접부하제어 (Direct Load Control Scheme for Congestion Problems in Power System Emergency)

  • 신호성;김병수;송경빈;김재철;이학주;권성철
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2005년도 춘계학술대회논문집
    • /
    • pp.307-310
    • /
    • 2005
  • Most of the electric power in the power system of South Korea is flowing from the south area to the north area, Seoul, in the capital of South Korea. Almost of the needs of the electric power in the capital area are about 43% of the total loads and generation plants are mainly located in the south area of South Korea. As mentioned the earlier characteristic, transmission congestion is one of the important research issues. Because of the limits of the power flows from the south to the north which are anticipated to be increased more and more in the future, these congestion situations may cause a serious voltage stability problem in emergency of the power system. Accordingly, we are interested in an interruptible load control program so as to solve this problem in emergency. This problem can be solved by an interruptible load management in emergency, however, the systematic and effective mechanism has not been presented yet. In this paper, the algorithm of interruptible load management plan using the line sensitivity to the loads for the transmission congestion management in emergency is presented. The proposed method is applied to 6-Bus sample system and their results are presented.

  • PDF

환경부하량을 고려한 토목시설물 전과정평가;국내 다목적댐 비상여수로 시설 사례연구 (The Life Cycle Assessment of Infrastructure considering Environmental Load;A Case Study of Emergency Spillway for Korean Multipurpose Dam)

  • 권석현;김상귀;정원지;김상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.519-522
    • /
    • 2006
  • 본 연구는 LCA(Life Cycle Assessment, 전과정평가) 개념을 바탕으로 토목시설의 환경성 평가를 위한 의사결정시 유용한 정보를 제공하기 위하여 사례대상으로 선정된 다목적댐 비상여수로의 위치 및 형식별로 발생 가능한 환경오염물질에 대한 환경부하량을 예측하고자 하였다. 이를 위해 LCA 기법의 이론을 고찰하고, 제안된 토목시설물의 사례대상인 다목적댐 비상여수로에 적용하기 위해 전과정 동안 발생하는 환경오염물질에 대한 환경부하량을 산출하고, 예측결과를 통하여 비상여수로의 환경성을 평가하고 친환경적인 최적대안을 도출하였다.

  • PDF

비상발전기용량 산정식 개선에 관한 연구 (A Study on the Improvement of the Arithmetic for Emergency Generator Capacity)

  • 이종혁;김진오
    • 전기학회논문지
    • /
    • 제67권11호
    • /
    • pp.1517-1522
    • /
    • 2018
  • This paper describes the improvement of the arithmetic for emergency generator capacity. This formula which calculates emergency generator is dependent on the Korean Design Standard of building electrical equipment issued by the Ministry of Land, Infrastructure and Transport, and the technical data related to the generator. when appling the formula, the capacity of the generator is insufficient at the starting conditions of the load facility. In case of emergency, the generator is not operated normally. $PG_2$ of the formula ($PG_1$, $PG_2$, $PG_3$) applied in determining the capacity of the emergency generator is selected by calculating the capacity of the generator based on only biggest one motor among the load equipment and $PG_3$ may not be able to start the generator normally in case of emergency because there is an error such that the power factor is applied at the last start of the motor having the maximum capacity of the load. We analyze the problem of capacity calculation of emergency generators used for general purposes. As a consequence, the improved formulas have been presented for safety of electrical installation.

소방용 비상발전기의 현장부하시험을 위한 ESS 부하시험장치의 경제성평가에 관한 연구 (A Study on Economic Evaluations of ESS Load Test Device for Field Load Test in Fire-fighting Emergency Generator Systems)

  • 최승규
    • 한국산학기술학회논문지
    • /
    • 제21권9호
    • /
    • pp.380-386
    • /
    • 2020
  • 소방용 비상발전기는 화재와 같은 비상상황에서 인명과 재산을 보호하는 소방시설에 비상전원을 공급하는 중요한 시설이다. 이러한 중요성에 따라 비상발전기는 주기적인 부하시험으로 성능과 상태를 확인하여야 한다. 비상발전기의 일반적인 부하시험 방법은 R, L, C 부하로 구성된 Load Bank를 이용하여 시험하고 있다. 최근, 비상발전기의 효율적인 부하시험을 위하여, 시험 중에 발생한 전력을 저장하였다가 전기사업자에게 판매하는 ESS 부하시험장치의 도입이 검토되고 있다. 그러나 리튬이온배터리의 높은 가격으로 인하여, ESS 부하시험장치는 기존의 Load Bank 방식보다 초기투자비가 많이 소요될 수 있어, 상용화가 어려운 실정이다. 하지만, 비상발전기의 부하시험 동안 발전된 전력의 판매를 고려하면, ESS 부하시험장치는 경제적인 사업모델이 될 가능성이 있다. 따라서, 본 논문에서는 ESS 부하시험장치의 정확한 경제성을 평가하기 위하여, ESS 부하시험장치에 충전된 전력의 판매를 고려한 비용요소와 편익요소로 구성된 경제성평가 모델링을 제시한다. 또한, 제시한 모델링을 바탕으로 ESS 부하시험장치와 Load Bank에 대한 투자회수율과 회수년도를 비교 및 분석한 결과, 전력판매를 고려할 경우 ESS 부하시험장치의 상용화가 가능함을 확인하였다.

Preventive and Emergency Control of Power System for Transient Stability Enhancement

  • Siddiqui, Shahbaz A.;Verma, Kusum;Niazi, K.R.;Fozdar, Manoj
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권1호
    • /
    • pp.83-91
    • /
    • 2015
  • This paper presents preventive and emergency control measures for on line transient stability (security) enhancement. For insecure operating state, generation rescheduling based on a real power generation shift factor (RPGSF) is proposed as a preventive control measure to bring the system back to secure operating state. For emergency operating state, two emergency control strategies namely generator shedding and load shedding have been developed. The proposed emergency control strategies are based on voltage magnitudes and rotor trajectories data available through Phasor Measurement Units (PMUs) installed in the systems. The effectiveness of the proposed approach has been investigated on IEEE-39 bus test system under different contingency and fault conditions and application results are presented.