A Study on the Improvement of the Arithmetic for Emergency Generator Capacity

비상발전기용량 산정식 개선에 관한 연구

  • Lee, Jong-Hyuk (Electrical Engineering of Hanyang University) ;
  • Kim, Jin-O (Electrical Engineering of Hanyang University)
  • Received : 2018.09.13
  • Accepted : 2018.10.17
  • Published : 2018.11.01

Abstract

This paper describes the improvement of the arithmetic for emergency generator capacity. This formula which calculates emergency generator is dependent on the Korean Design Standard of building electrical equipment issued by the Ministry of Land, Infrastructure and Transport, and the technical data related to the generator. when appling the formula, the capacity of the generator is insufficient at the starting conditions of the load facility. In case of emergency, the generator is not operated normally. $PG_2$ of the formula ($PG_1$, $PG_2$, $PG_3$) applied in determining the capacity of the emergency generator is selected by calculating the capacity of the generator based on only biggest one motor among the load equipment and $PG_3$ may not be able to start the generator normally in case of emergency because there is an error such that the power factor is applied at the last start of the motor having the maximum capacity of the load. We analyze the problem of capacity calculation of emergency generators used for general purposes. As a consequence, the improved formulas have been presented for safety of electrical installation.

Keywords

References

  1. Ministry of land, Infrastructure and Transport, "Korean Design Standard 31 60 20", pp.13-17, 2016.
  2. H. G. Choi, Y. J Song, and S. W Park, and et al., "Design of the latest power facilities", BM Sung an Dang, 1st Ed, pp. 210-212, 2011.
  3. Korea Occupational Safety & Health Agency, "Guidelines for the selection and installation of emergency generators", pp. 6-8, 2004.
  4. Korea Land & Housing Corporation, "Guidelines for the design of housing and electricity and information and communication", pp.95-98, 2010.
  5. Seoul Housing & Communities Corporation, "Electricity and information communication design standard", pp. 54-59, 2016.
  6. J. H. Lee., "A Study on Calculation Method for Fire Load (PG) of Calculating generator capacity of building electrical design standard", Electric Engineers Magazine, Vol. 406, pp. 44-47, 2016.06
  7. D. H. Kwon, "A study on improvement method of generator capacity calculation method considering engine output for generator", M.Sc. Thesis, Department of Electrical Engineering and Computer Science Graduate School of Hanyang University, pp. 33-37, 2017.
  8. S. J. Lee, "Study on Emergency Generator Capacity Selection considering Large Motor Starting", M.Sc. Thesis, Department of Electrical Engineering Graduate School of Soongsil University, pp. 22-43, 2016.
  9. "IEEE Recommended Practice for Industrial and Commercial Power System Analysis", The Institute of Electrical and Electronics, Inc IEEE Std 339, 1997.
  10. IEEE Standards Board, "IEEE Design Guide for Electric Power Service Systems for Generating Stations", IEEE Std 666-1991, pp. 231, 1991.
  11. J. H. Lee, D. W. Seo, and J. O. Kim, "A Study on Emergency Generator Capacity Calculation (PG)", 49th KIEE Conference on Power System, pp. 291-292, 2018. 7.
  12. J. T. Kim.. and W. Rhee, "Some Considerations on the Capacity Estimation of Emergency Electric Generator in Apartment Complex", Journal of the Korean Institute of Illuminating and Electrical Installation Engineers, pp. 68-77, 1996.8.
  13. S. J. Lee, M. Y. Choi, S. Y. Kim, and Y. T. Kim, and et al., "Study on Emergency Generator Capacity Selection (PG3) in the Chemical Plant", Journal of the Korean Institute of Illuminating and Electrical Installation Engineers, pp. 55-60, 2015.12.