돌관공사 시나리오 기반 공정관리 최적화 방안 (Process Optimization Method Based on Emergency Construction Work Scenario)

  • 이시현;이승학;우미선;손재호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

돌관공사 시나리오 기반 공기-비용 최적화 모델 개발 (Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario)

  • 이시현;이승현;손재호
    • 한국건설관리학회논문집
    • /
    • 제17권3호
    • /
    • pp.43-51
    • /
    • 2016
  • 최근 건설공사의 규모와 복잡성이 현저하게 증가함에 따라 건설비용이 상승하게 되었다. 많은 건설공사가 날씨, 노동력 공급, 장비 구매, 사고 등과 같은 다양한 요소들로 인하여 당초 계획했던 공사기일 내에 완공되지 못하고 있다. 계획된 시간 내에 공사를 완공하기 위하여 돌관공사를 시행하여야 한다. 하지만 돌관공사를 위한 결정들이 현장 소장들의 경험에만 의지하고 있는 실정이다. 그러므로 이 논문은 작업조의 투입과 작업시간의 조합으로 생길 수 있는 다양한 돌관공사 시나리오 중 최적의 대안을 선정할 수 있는 TCTO 모델을 제안하고자 한다. 개발된 모델은 실무적인 제약조건을 만족시키는 최적의 공정계획을 제공할 수 있다. 더 나아가서 제안된 모델에 자원평준기능을 포함하게 되면 보다 실용적인 모델이 될 수 있을 것으로 예상된다.

응급실 초진간호업무 측정도구 개발 (Development of an Instrument to Measure Triage Nursing Work in Emergency Room)

  • 유경희;장금성
    • 한국간호교육학회지
    • /
    • 제21권4호
    • /
    • pp.477-489
    • /
    • 2015
  • Purpose: The purpose of this study was to develop an instrument to assess emergency room nurses' knowledge and performance of triage nursing. Methods: The instrument was developed through the stages of conceptual construction, item development, and validity and reliability testing. For the validity and reliability testing, data collected from 48 emergency room nurses using questionnaires was analyzed through descriptive statistics, factor analysis, and reliability coefficients. Results: The knowledge part consisted of 30 items in nine areas, and its reliability was low (KR-20 =0.50). The correct-answer rate was 71.8%. The performance section derived from the factor analysis was composed of two factors with nine items in the triage domain and three factors with 12 items in the non triage domain. The explanatory powers of these factors for the domains were 66.1% and 70.4%, respectively. The overall reliability (Cronbach's ${\alpha}$) was .95, and the reliabilities for the two domains were .88 and .91, respectively. The nurses' mean performance level was 3.2(${\pm}0.45$). Conclusion: The specific contents of the triage nursing work were identified from the developed scale; further research is necessary to in order to develop a scale capable of higher reliability and validity.

Economic Evaluation of IT Investments for Emergency Management : A Cost-centric Control Model

  • Kim, Tae-Ha;Lee, Young-Jai
    • Journal of Information Technology Applications and Management
    • /
    • 제15권3호
    • /
    • pp.195-208
    • /
    • 2008
  • In an emergency management case, evaluating the economic value of information technology investments is a challenging problem due to the effects of decision making, uncertainty of disasters, and difficulty of measurements. Risk assessment and recovery process, one of the major functions in emergency management, consists of (1) measurement of damages or losses, (2) recovery planning, (3) reporting and approving budgets, (4) auctioning off recovery projects to constructors, and (5) construction for the recovery. Specifically and of our interest, measurement of damages or losses is often a costly and time-consuming process because the wide range of field surveys should be performed by a limited pool of trained agents. Managers, therefore, have to balance accuracy of the field survey against the total time to complete the survey. Using information technologies to support field survey and reporting has great potential to reduce errors and lowers the cost of the process. However, existing cost benefit analysis framework may be problematic to evaluate and justify the IT investment because the cost benefit analysis often include the long-run benefit of IT that is difficult to quantify and overlook the impact of managerial control upon the investment outcomes. Therefore, we present an alternative cost-centric control model that conservatively quantifies all cost savings to replace benefits in cost benefit analysis and incorporate the managerial control. The model provides a framework to examine how managerial decision making and uncertainty of disaster affect the economic value of IT investments. The current project in Emergency Agency in South Korea is introduced as a case to apply the cost-centric control model. Our work helps managers to better evaluate and justify IT-related investment alternatives in emergency management.

  • PDF

TETRA시스템의 국산화율 제고를 위한 정책적 접근방안 (Political consideration issues for the exclusive possession protection and localization of TETRA system in Korea)

  • 문헌일;홍완표
    • 한국전자통신학회논문지
    • /
    • 제3권4호
    • /
    • pp.221-227
    • /
    • 2008
  • 소방 방재청에서 실시하여 온 시범사업 및 확장 1차 사업을 통하여 구축된 시스템은 국산화율이 매우 낮은 상황으로서 시스템제조업자의 제조 중단 등이 발생할 경우 통합망의 유지관리에 상당한 지장을 초래하게 된다. 이 문제를 방지하기 위해서는 단말기는 물론이고 중앙시스템에 대한 주요 부품의 국산화가 요구된다. 즉 통합네트워크 시스템의 기술종속 방지 및 국산화 대책 마련이 필요한 상태이다. 본고는 기술종속 및 독점 요소 분석을 통한 국산화방안에 대한 정책방향을 제시한다.

  • PDF

두 개의 지로터로 구성된 전유압 파워스티어링 장치의 1차원 해석 (One Dimensional Analysis of Hydrostatic Power Steering Unit Composed of Two Gerotors)

  • 김갑태;유범상;김경식;정황훈
    • 드라이브 ㆍ 컨트롤
    • /
    • 제17권4호
    • /
    • pp.113-124
    • /
    • 2020
  • Most of the work of construction equipment and agricultural machinery is done in off-road conditions. Autonomous driving required in these conditions uses GPS sensors, and PID controllers to control their speed and position. The hydrostatic steering, which is composed of a PSU, hydraulic hoses, and cylinders, rather than a mechanical coupling is used in these equipments. The PSU plays a key role in hydrostatic steering. Precise control of the position under various conditions requires detailed behavioral analysis of the basic components and operation. Two Gerotor PSU is now a commonly used safer option. The components of the PSU can be divided into mechanical and hydraulic actuating elements by its behavior. Since the system is combined by mechanical and hydraulic elements, the modelings are performed using Amesim, which is one of the most effective for the multi-domain dynamic system analysis. To confirm the validity of the model, input torque and pressures are checked with varying steering speed. The opening and the steering speed of normal and newly designed control valve set is investigated with the effect of centering spring force and friction. Finally, simulation results with fully detailed model with two gerotors are analyzed and compared with simple model.

운영중인 철도비탈면 보호를 위한 초속경 복합매트의 강도 및 내구성 실험 (Strength and Durability Test of Rapid Hardening Composite Mat for Protect Railway Slope in Operation)

  • 유현상;강태희;정혁상;백인철
    • 한국지반신소재학회논문집
    • /
    • 제21권4호
    • /
    • pp.79-91
    • /
    • 2022
  • 최근 폭우, 폭설 등과 같은 이상기후로 인해 도로, 철도 및 단지에 적용된 비탈면의 국부적 파괴 또는 손상 빈도가 점차 증가하고 있다. 초속경 복합매트(Rapid Hardening Composite Mat, RHCM)은 대규모 토공이 불필요하고 수해복구시간을 최소화할 수 있는 장점이 있어 대안으로 고려될 수 있다. RHCM은 대표적인 비탈면 보호공법인 숏크리트 공법 및 식생공 공법에 비해 중장비 설비가 불필요하고 유지관리가 용이하며, 기존 Geosynthetic Concrete Composite Mat(GCCM)에 비해 경화시간이 짧아 긴급복구가 가능하다는 장점이 있다. 따라서, 본 연구에서는 실내시험을 통해 RHCM의 강도 및 내구성을 측정하고 GCCM과 비교·분석하였다. 실내시험 결과 RHCM의 강도는 기존 GCCM에 비해 약 51% 높은 것으로 나타났으며, 내구성 또한 69% 높은 것으로 나타났다.

SaaS기반의 건설공정전송 및 안전관리 시스템 (SaaS-based construction process transfer and Safety Management System)

  • 김의룡;정수성;김영곤
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2015년도 춘계학술대회
    • /
    • pp.735-737
    • /
    • 2015
  • 본 논문은 SaaS(Software as a Service) 기반의 건설공정전송 및 안전관리 시스템을 건설작업에 활용하여 공정관리와 안전관리에 적용함으로써 초고속 무선인터넷을 통해 이루어지는 다양한 유형의 건설 공정에 대한 일정 및 결과와 안전관리에 대한 체계적인 수단을 확보할 수 있고 공정 내에서 이루어지는 모든 관리 체계를 신속하고 정확하게 관리할 수 있다.작업자는 스마트폰을 활용하여 감독관으로 작업을 지시받고 작업의 현황과 결과를 보고한다. 또한 비상상황 시 감독관에게 보고를 즉시 할수 있으며 일정시간 이상 스마트 폰 진동 발생이 없는 경우 작업자에게 위험 상황을 체크하게 된다. 감독관의 경우 수립된 공정별 업무를 지시하고 결과를 확인하며 현장 작업자 위험 상황의 조치명령을 내리고 미흡한 부분을 제시함으로써 만족되는 결과를 얻게 된다. 또한 소프트웨어(서버)의 경우 작업에 관련된 모든 자료를 저장하고 회원관리 및 보안을 담당하였다.

  • PDF

작업현장 사고예방을 위한 위험인지 점검체크리스트 개발 (The Development of Inspection Checklist for Risk Recognition to Prevent Accidents at Worksites)

  • 임형덕;라지타 가우설야;김상훈;오영찬;이호용;남기훈
    • 한국산업융합학회 논문집
    • /
    • 제25권5호
    • /
    • pp.811-816
    • /
    • 2022
  • Even though continuous management and supervision of reinforcement of policies to safeguard accidents at workplace and work sites were implemented. Accident prevention activities such as inspection and diagnosis are urgently required to induce a preliminary investigation to identify the risk factors for each type of work, before the work task to eliminate risks at the worksites. Since safety inspections at work sites were generally conducted through visual inspections, the results of safety inspections may vary depending on the findings and proficiency of the safety officers. The results of those inspections may have loopholes to prevent potential accidents at work. Therefore, the purpose of this study was to develop a risk identification checklist that can effectively perform safety inspections to prevent accidents at work sites. This study initially analyzed the previously developed accident checklist to identify current complications and issues in safety checklists. Based on the findings of major industrial accidents over the past three years, the relationship between accident, workplace, and work type were analyzed refereeing the safety inspection standards. A risk recognition-checklist was developed to provide basic data on identifying risk factors, and inspection guidance at work sites. To prepare for potential accidents by identifying and taking countermeasures to mitigate the high risk and serious accidents at sites by the guidelines of the checklist. The developed inspection checklist has been practically used by experts at work sites to perform safety inspections, and it has been verified its suitability, and feasibility, to prevent or mitigate workplace accidents, including securing the safety and health of field workers. The role of the developed safety checklist has been considered effective at worksites.

Optimum design of steel frame structures considering construction cost and seismic damage

  • Kaveh, A.;Fahimi-Farzam, M.;Kalateh-Ahani, M.
    • Smart Structures and Systems
    • /
    • 제16권1호
    • /
    • pp.1-26
    • /
    • 2015
  • Minimizing construction cost and reducing seismic damage are two conflicting objectives in the design of any new structure. In the present work, we try to develop a framework in order to solve the optimum performance-based design problem considering the construction cost and the seismic damage of steel moment-frame structures. The Park-Ang damage index is selected as the seismic damage measure because it is one of the most realistic measures of structural damage. The non-dominated sorting genetic algorithm (NSGA-II) is employed as the optimization algorithm to search the Pareto optimal solutions. To improve the time efficiency of the proposed framework, three simplifying strategies are adopted: first, simplified nonlinear modeling investigating minimum level of structural modeling sophistication; second, fitness approximation decreasing the number of fitness function evaluations; third, wavelet decomposition of earthquake record decreasing the number of acceleration points involved in time-history loading. The constraints of the optimization problem are considered in accordance with Federal Emergency Management Agency's (FEMA) recommended seismic design specifications. The results from numerical application of the proposed framework demonstrate the efficiency of the framework in solving the present multi-objective optimization problem.