Recently, Korea government decided to introduce RPS (Renewable Portfolio Standard) mechanism which requires electricity providers to gradually increase the amount of renewable energy sources such as wind, solar, bioenergy, and geothermal. As a consequence, it is expected that the long-term fuel mix would be changed to result in more expensive production and the increased production costs would be distributed to the rate payers via electricity tariffs. This paper presents the change in long-term fuel mix in year 2020 with the four RPS scenarios of 3%, 5%, 10% and 20%, and the methodologies for collecting the increased production costs through new tariff schedule. The studies on long-term fuel mix have been carried out with the GATE-PRO (Generation And Transmission Expansion Program) optimization package, a mixed-integer program developed by the Korea Energy Economics Institute and Hongik university. Three methodologies for distributing the production costs to the rate payers have also been demonstrated.
석탄가스화를 기반으로 한 발전(IGCC 발전) 및 화학원료 제조공정의 상업화 관건은 화석연료인 원유 또는 천연가스를 기반으로 생산되는 경우와 비교하여 경제성을 확보할 수 있는지 여부이다. 경제성 확보를 위한 가장 현실적인 방법으로는 석탄 가스화를 통해 얻어진 합성가스로부터 2개 이상의 생산물(예: 발전과 화학원료를 동시 생산)을 병산(coproduction 또는 poly-generation)하는 것이다. 본 연구에서는 석탄 가스화를 기반으로 하여 발전과 수송용, 발전용 및 가정용 연료로 사용이 가능한 DME(dimethyl ether)를 병산하는 공정에 대한 경제성 분석을 실시하였다. 경제성 분석을 위한 병산 공정에서는 250 MW 전력생산 연간 30만 톤의 DMZ 생산을 기준으로 하였다. 병산 공정에서 DME 판매가격이 50만원/ton인 경우, 전기 생산원가는 34.8~58.4원/kWh으로 SMP(계통한계가격) 가중평균인 150.69원/kwh(2013년 1월~12월까지의 평균값)의 33~58% 수준으로 산정되었다. 따라서, DME 판매가격이 적정하게 유지될 경우 석탄 IGCC+DME 병산공정은 IGCC 단독 발전과 비교하여 경제성을 확보할 수 있을 것으로 판단된다. 현재 중국에서 DME 판매가격이 900,000원/톤 내외이므로, 전력과 DME를 병산할 경우, IGCC 단독으로 전력을 생산할 경우와 비교하여 전력 생산 원가를 월등하게 낮출 수 있음을 알 수 있다. 이와 같이 석탄 가스화를 기반으로 한 병산 공정을 통해 전력과 DME를 병산하는 시스템에서, 시장 여건에 따라 전력과 DME 생산비율 제어가 가능하고, 석탄 가스화기 및 정제 시스템을 공통 설비로 활용함으로써, 개별적으로 생산하는 것보다 생산 원가를 낮출 수 있다는 결과를 얻었다.
Partho Sarothi Roy;Young Don Yoo;Suhyun Kim;Chan Seung Park
청정기술
/
제29권1호
/
pp.53-58
/
2023
This study shows the summary of the economic performance of excess electricity conversion to hydrogen as well as methane and returned conversion to electricity using a fuel cell. The methane production process has been examined in a previous study. Here, this study focuses on the conversion of methane to electricity. As a part of this study, capital expenditure (CAPEX) is estimated under various sized plants (0.3, 3, 9, and 30 MW). The study shows a method for economic optimization of electricity generation using a fuel cell. The CAPEX and operating expenditure (OPEX) as well as the feed cost are used to calculate the discounted cash flow. Then the levelized cost of returned electricity (LCORE) is estimated from the discounted cash flow. This study found the LCORE value was ¢10.2/kWh electricity when a 9 MW electricity generating fuel cell was used. A methane production plant size of 1,500 Nm3/hr, a methane production cost of $11.47/mcf, a storage cost of $1/mcf, and a fuel cell efficiency of 54% were used as a baseline. A sensitivity analysis was performed by varying the storage cost, fuel cell efficiency, and excess electricity cost by ±20%, and fuel cell efficiency was found as the most dominating parameter in terms of the LCORE sensitivity. Therefore, for the best cost-performance, fuel cell manufacturing and efficiency need to be carefully evaluated. This study provides a general guideline for cost performance comparison with LCORE.
Electricity sales are directly measured from individual consumers, which could minimize the time gap between data collection and public announcement. Furthermore, industrial electricity sales are highly linked with production and output. Therefore, industrial electricity consumption can be used to track production and output in real time. By using the high-frequency data of industrial electricity sales, this study develops the daily electricity business index (DEBI) to capture the daily economic status. The steps used to formulate DEBI are as follows: (1)selection of the explanatory variables and period, (2) amendment of the seasonal adjustment to eliminate daily temperature and effective day effects, (3) estimation of the weighted value via variables by using PCA, (4) calculation of DEBI and commencement of validation tests. Our empirical analysis and the Hodrick-Prescott filter analysis show that DEBI is highly related to existing economic indices.
In real-time electricity price environment, the energy management system can provide the significant advantage to the residential, commercial and industrial customers since it can reduce the electricity charge by controlling the load operation effectively in response to time-varying price. However, the earlier studies for load management mainly focus on the residential and commercial customers except for the industrial customers because most of load operations in industrial sector are intimately related with production schedule. So, it is possible that the inappropriate control of loads in industrial sector causes huge economic loss. In this paper, therefore, we propose load control algorithm for factory energy management system(F-EMS) to achieve not only minimizing the electricity charges but also maintaining production efficiency by considering characteristics of load operation and production schedule. Considering characteristics of load operation and production schedule, the proposed load control algorithm can reflect the various characteristics of specific industrial customer and control their loads within the range that the production efficiency is maintained. Simulation results show that the proposed load control algorithm for F-EMS leads to significant reduction in the electricity charges and peak power in industrial sector.
Dust in the fabric production sites is increased by the static electricity in air which is generated in the manufacturing process. The static electricity is shown in inverse proportion to humidity of the production sites. The optimum humidity rate for the filament in the production process has been established as 65~75%. Where as, average humidity rate of production site is estimated as 40%. Therefore, it is necessary to raise the humidity rate by 30% to maintain appropriate humidity to control generation of static electricity and dust in the production sites. In this study, a new air-jet water sprayer was developed and it can produce $10{\mu}m$ sprayed particles. When the air-jet water sprayer was operated on the production site dust generation rate was shown far below the environmental standard. It is assumed that when the air jet sprayers was applied to 1,000 fabric machines of 5 gloves making plants, its productivity and rates of operation will be improved by value of about 2.5 billion Won a year.
Global warming has pressured companies to put a greater emphasis on environment management which allows them to reduce environmental impact and costs of their operations. In Korea, the coal-fired power plants take a large account of electricity generation at 31.7% of the total electricity usage in 2014. Thus, environmental impact of coal-fired power plants is significant. This paper illustrated how to compute environmental impact and costs in electricity generation at a coal-fired power plant using MFCA methodology. Compared to the traditional accounting, an advantage of MFCA is to provide information on electricity generation costs and environmental wastes incurring throughout the production process of electricity. Based on MFCA, the coal-fired power plant was able to reduce production cost of electricity by 52.3%, and environmental wastes by 47.7%. As a result, MFCA seemed to be an effective tool in environmental management for power plants.
최근 지역별 차등 전기요금제 도입과 전력 자급률에 관한 논의가 활발하게 진행되고 있다. 우리나라는 발전 시설의 편재성이 상당히 높고 전기 생산과 소비지역 간 불균형이 존재하기에 현행 전국 동일 전기요금제를 대신해서 지역별로 다른 요금을 부과하자는 것이며, 전기 생산과 소비지역을 구분·식별하는 기준으로서 지역별 전력 자급률이 제시되고 있다. 그런데 상당수 논의에서 전력 자급률을 측정하는 공간 단위를 17개 시·도 지역으로 설정하고 있는데, 그 적절성에 대한 분석이 필요하다. 이 연구에서는 전력 자급률을 17개 시·도 그리고 229개 시·군·구를 공간 단위로 설정하여 분석하였다. 분석 결과, 시·도 단위에서는 전기 생산량이 소비량보다 많은 지역이 7곳, 그 반대가 10곳이지만 시·군·구 단위에서는 각각 38곳과 191곳이었다. 아울러 전력 자급률 측정은 간단하고 직관적으로 전기 생산과 소비지역을 파악할 수 있다는 장점이 있지만, 전기요금의 지역 차등의 기준으로는 몇몇 문제가 있음을 지적한다.
In India, continuous production of electricity and sweet/potable water from Solar power and desalination plant plays a major role in the industries. Particularly in Copper industry, Solar power adopts Solar field collector combined with thermal storage system and steam Boiler, Turbine & Generator (BTG) for electricity production and desalination plant adopts Reverse osmosis (RO) for sweet/potable water production which cannot be used for long hours of power generation and consistency of energy supply for industrial processes and power generation cannot be ensured. This paper presents an overview of enhanced technology for Solar power and Desalination plant for Copper industry making it continuous production of electricity and sweet/potable water. The conventional technology can be replaced with this proposed technique in the existing and upcoming industries.
Purpose - The paper analyzes basic indicators characterizing the volume of energy sector activity in the Russian Federation, Privolzhsky Federal district, Republic of Tatarstan. Research design, data, and methodology - The study analyzed data from the Privolzhsky Federal district, specifically, industrial production volume, electricity production, energy consumption, energy-balance data, capital investments, and capital investment structure. An array of data has been investigated in recent years. The dataset's dynamics were analyzed in 1998. Fixed capital investment dynamics were studied in 1946 the figures were converted to a comparable form using the index method. Trends were analyzed using multivariate statistics methods and the Statgraphics software package. Results - Hypothesis 1. There are sectoral disproportions in energy flows,taking into account the volume of electricity production and consumption. Trends in electricity production in general coincide with industrial production volume trends. Energy flows have disparities in individual territorial units, and in general. Hypothesis 2. The degree of sectoral economic stability decreases with insufficient levels of investment in fixed capital energy organizations. Conclusions - Because totalelectricity production is largely determined by fixed capital investments, the study of their trends and patterns will coordinate efforts on investment operations in this area.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.