• 제목/요약/키워드: Electricity market

검색결과 612건 처리시간 0.035초

The Best Line Choice for Transmission System Expansion Planning on the Side of the Highest Reliability Level

  • Sungrok Kang;Trungtinh Tran;Park, Jaeseok;Junmin Cha;Park, Daeseok;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권2호
    • /
    • pp.84-90
    • /
    • 2004
  • This paper presents a new method for choosing the best line for transmission system expansion planning considering the highest reliability level of the transmission system. Conventional methodologies for transmission system expansion planning have been mainly focused on economics, which is the minimization of construction costs. However, quantitative evaluation of transmission system reliability is important because successful operation and planning of an electric power system under the deregulated electricity market depends on transmission system reliability management. Therefore, it is expected that the development of methodology for choosing the best lines considering the highest transmission system reliability level while taking into account uncertainties of transmission system equipment is useful for the future. The characteristics and effectiveness of the proposed methodology are illustrated by the case study using a MRBTS.

뉴스초점 - 한국 토종 원자로 'SMART"의 오늘과 내일 (News Focus - Today and Tomorrow of the Korea-made NPP, SMART)

  • 김학로
    • 기술사
    • /
    • 제44권6호
    • /
    • pp.40-44
    • /
    • 2011
  • Nuclear energy in Korea began in 1958, when the Korea's atomic energy act was formulated and the relevant organizations were founded. Since then, notwithstanding the two catastrophe like TMI and Chernobyl accident, Korea made a wise decision to expand the peaceful uses of the nuclear energy as well as to localize the essential nuclear design technology of fuel and nuclear steam supply system. This decision resulted in the success of export of nuclear power plants as well as research reactor in 2010s. The Korea's nuclear policy, which well utilized 'international crisis in nuclear business' as 'opportunity of Korea to get. nuclear technology', is believed nice policy as a role model of nuclear new-comer countries. Based upon the success story of localization of nuclear technology, Korea had an eye for a niche market, which was a basis of development of SMART, Korea-made integral PWR. The operation of a SMART plant can sufficiently provide not only electricity but also fresh water for 100,000 residents. Last two years, Korea's nuclear industry team led by the Korea Atomic Energy Research Institute completed the standard design of SMART and applied to the Korea's regulatory body for standard design approval. Now the Korea's licensing authority is reviewing the design with the relevant documents, and the design team is doing its best to realize its hope to get the approval by the end of this year. From next year, the SMART business including construction and export will be explored by the KEPCO consortium.

  • PDF

Developing a New Risk Assessment Methodology for Distribution System Operators Regulated by Quality Regulation Considering Reclosing Time

  • Saboorideilami, S.;Abdi, Hamdi
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권4호
    • /
    • pp.1154-1162
    • /
    • 2014
  • In the restructured electricity market, Performance-Based Regulation (PBR) regime has been introduced to the distribution network. To ensure the network stability, this regime is used along with quality regulations. Quality regulation impose new financial risks on distribution system operators (DSOs). The poor quality of the network will result in reduced revenues for DSOs. The mentioned financial risks depend on the quality indices of the system. Based on annual variation of these indices, the cost of quality regulation will also vary. In this paper with regard to reclosing fault in distribution network, we develop a risk-based method to assess the financial risks caused by quality regulation for DSOs. Furthermore, in order to take the stochastic behavior of the distribution network and quality indices variations into account, time-sequential Monte Carlo simulation method is used. Using the proposed risk method, the effect of taking reclosing time into account will be examined on system quality indicators and the cost of quality regulation in Swedish rural reliability test system (SRRTS). The results show that taking reclosing fault into consideration, affects the system quality indicators, particularly annual average interruption frequency index of the system (SAIFI). Moreover taking reclosing fault into consideration also affects the quality regulations cost. Therefore, considering reclosing time provides a more realistic viewpoint about the financial risks arising from quality regulation for DSOs.

A Study on Optimal Reliability Criterion Determination for Transmission System Expansion Planning

  • Tran Trungtinh;Choi Jae-Seok;Jeon Dong-Hoon;Chu Jin-Boo;Thomas Robert;Billinton Roy
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.62-69
    • /
    • 2005
  • The optimal design of transmission system expansion planning is an important part of the overall planning task of electric power system under competitive electricity market environments. One of main keys of the successful grid expansion planning comes from optimal reliability level/criteria decision, which should be given for constraint in the optimal expansion problem. However, it's very difficult to decide logically the optimal reliability criteria of a transmission system as well as generation system expansion planning in a society. This paper approaches a methodology for deciding the optimal reliability criteria for an optimal transmission system expansion planning. A deterministic reliability criteria, BRR (Bus Reserve Rate) is used in this study. The optimal reliability criteria, BRR/sup */, is decided at minimum cost point of total cost curve which is the sum of the utility cost associated with construction cost and the customer outage cost associated with supply interruptions for load considering bus reserve rate at load buses in long term forecasting. The characteristics and effectiveness of this methodology are illustrated by the case study using IEEE-RTS.

모선수송전달능력(母線輸送傳達能力) 신뢰도 기준에 의한 송전계통(送電系統)의 광역설계(擴充計劃) -II (Transmission System Expansion Planning by Nodal Delivery Marginal Rate Criterion -II)

  • 박정제;사박;정상헌;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.574-575
    • /
    • 2007
  • This paper proposes a method for choosing the best transmission system expansion plan using nodal/bus delivery marginal rate criterion ($BMR_k$) defined newly in this paper. The objective method minimizes a total cost which is an investment budget for constructing new transmission lines subject to the $BMR_k$ which means a nodal deterministic reliability level requirement at specified load point. The proposed method models the transmission system expansion problem as an integer programming problem. It solves for the optimal strategy using a branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the transmission system expansion planning problem in competitive electricity market environment.

  • PDF

TRELSS를 이용한 KEPCO 계통의 공급지장비 추정연구 (Area Annual Outage Cost Assessment of KEPCO System by TRELSS)

  • 사박;정상헌;박정제;최재석;전동훈;윤용범;장병훈;문승필;한경남
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.578-579
    • /
    • 2007
  • The importance and necessity of conducting studies on area outage cost assessment have been increasingly important in recent years due to the competitive electricity market environment. The objective of operational issues would be to minimize the total area cost while satisfying all associated system constrains of each area[2]. This paper presents a methodology of the Area annual outage cost assessment by probabilistic reliability evaluation using TRELSS program for KEPCO system. The interrupted energy assessment rate (IEAR) is evaluated by macro approach that is using relations between GRDP and the electrical energy demand. The Expected Energy Not Supplied (EENS) of each area was evaluated using the Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Version 6_2, a program developed by EPRI are introduced in this paper.

  • PDF

송전제약과 등가운전시간을 고려한 장기 예방정비계획 최적화에 관한 연구 (Optimization of Long-term Generator Maintenance Scheduling considering Network Congestion and Equivalent Operating Hours)

  • 신한솔;김형태;이성우;김욱
    • 전기학회논문지
    • /
    • 제66권2호
    • /
    • pp.305-314
    • /
    • 2017
  • Most of the existing researches on systemwide optimization of generator maintenance scheduling do not consider the equivalent operating hours(EOHs) mainly due to the difficulties of calculating the EOHs of the CCGTs in the large scale system. In order to estimate the EOHs not only the operating hours but also the number of start-up/shutdown during the planning period should be estimated, which requires the mathematical model to incorporate the economic dispatch model and unit commitment model. The model is inherently modelled as a large scale mixed-integer nonlinear programming problem and the computation time increases exponentially and intractable as the system size grows. To make the problem tractable, this paper proposes an EOH calculation based on demand grouping by K-means clustering algorithm. Network congestion is also considered in order to improve the accuracy of EOH calculation. This proposed method is applied to the actual Korean electricity market and compared to other existing methods.

스마트 모빌리티 상태 알림 시스템 설계 (Design of Smart Mobility Status Notification System)

  • 박세일;장종욱
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2017년도 추계학술대회
    • /
    • pp.258-260
    • /
    • 2017
  • 스마트 모빌리티는 차세대 친환경 이동수단으로 각광 받고 있어 시장이 매해 급성장 하고 있다. 그러나 전기를 동력으로 사용하는 기기 특성상 이용자의 몸무게나 주행 환경에 따라 모터 및 배터리는 제조사에서 표기하는 성능과 실제 성능과는 큰 차이를 보여 이용자에 따라 기기 이용 시 권장되는 주행 기준점이 없어 본래의 동작에 과부하 발생 빈도가 높아져 기기의 고장 및 파손이 늘어나고 있다. 본 논문에서는 이용자의 주행 상태를 측정 후 제조사 측에서 제공하는 권장 주행과는 별도로 실제 주행 시의 맞춤 권장 주행 안내 및 과부하 주행 상황 알림을 제공하는 어플리케이션을 설계하여 스마트 모빌리티 기기의 고장 및 파손은 물론 이용자의 안전까지 확보하고자 한다.

  • PDF

미국 에너지 시장에 공급되는 바이오에너지에 관한 연구(II) - 환경친화적 녹색전기의 마케팅 및 정부지원책에 대하여 - (Biomass Energy in the USA: A Literature Review (II) - Marketing and Policies for Green Power Production with Environmental Attributes -)

  • 김영숙
    • Journal of the Korean Wood Science and Technology
    • /
    • 제33권1호통권129호
    • /
    • pp.97-110
    • /
    • 2005
  • 본 연구는 최근 미국 에너지 시장에서 바이에너지가 차지하는 위치와 공급상황에 대하여 조사 연구되었다. 특히 제 1보에서는 미국에서 실용화되고 있는 목질 바이오매스를 이용한 바이오매스 전기제조기술(직접 연소 발전, 산업체의 폐열발전, 가스터빈과 스팀터빈 연합 발전 및 모듈화된 발전시스템등), 전기생산 시설 및 공급가의 경제성등에 대하여 검토하였고, 제 2보에서는 바이오매스 전기에 대한 미국의 정책 및 마케팅전략, 그리고 바이오매스 전기 사용이 가져오는 환경적 경제적 이익 및 발전 장벽(Benefit and Barriers)등에 대하여 조사 연구되었다.

재생에너지 출력제한에 따른 출력량 배분 방안 연구 (The Study on the Method of Distribution of output according to Power Limit of Renewable Energy)

  • 명호산;김세호
    • 전기전자학회논문지
    • /
    • 제23권1호
    • /
    • pp.173-180
    • /
    • 2019
  • 재생에너지의 점유율 증가에 의하여 출력이 제한되는 사례가 발생하고 있다. 전형적으로 풍력발전의 발전량이 높고 부하가 낮은 새벽시간에 출력제한이 주로 발생하였으나, 태양광발전의 점유율이 증가하면서 낮 시간에 풍력발전의 출력이 제한되는 사례가 발생하고 있다. 현재의 전력계통 운영 상황에서는 태양광발전의 점유율이 증가할수록 풍력발전의 출력 제한이 더욱 증가시킬 것이며, 이는 풍력발전 운영자의 어려움을 가중시킬 것이다. 본 논문에서는 발전원 그리고 발전소별 출력 제한을 위하여 전력계통의 운영 어려움 유발하는 에너지원의 우선 제약을 기준으로 설정하여 기준에 따라 재생에너지의 출력 제한량을 분배하는 방안을 제시하였다.