1 |
Kim, J. H., Park, J. B., Park, J. K., & Chun, Y. H. "Generating unit maintenance scheduling under competitive market environments" International Journal of Electrical Power & Energy Systems, Vol. 27, No. 3, pp. 189-194, Mar., 2005.
DOI
|
2 |
Han, S. M., Shin, Y. G., & Kim, B. H., "An Algorithm for Generator Maintenance Scheduling Considering Transmission System", The Transaction of The Korean Institute of Electrical Engineers A, Vol. 54A, No. 7, pp. 352-357, Jul., 2005.
|
3 |
Kim, M. S., "Application of TEOH for the determination of maintenance period in gas turbine engineers", Thesis for the degree of master of science, Yonsei University Graduate School of Engineering, Dec., 1999.
|
4 |
Lobato, E., Sanchez-Martin, P., & Saiz-Marin, E., "Long Term Maintenance Optimization of CCGT Plants", In 2012 Asia-Pacific Power and Energy Engineering Conference, pp. 1-4, Mar., 2012.
|
5 |
Han, S., Kim, H., Lee, S., & Kim, W., "Optimization of Generator Maintenance Scheduling with Consideration on the Equivalent Operation Hours", Journal of Electrical Engineering and Technology, Vol.11, No. 2, pp. 338-346, Mar., 2016.
DOI
|
6 |
MacQueen, J., "Some methods for classification and analysis of multivariate observations", In Proceedings of the fifth Berkeley symposium on mathematical statistics and probability, Vol. 1, No. 14, pp. 281-297, Jun., 1967.
|
7 |
Krishnan, V., Ho, J., Hobbs, B. F., Liu, A. L., McCalley, J. D., Shahidehpour, M., & Zheng, Q. P., "Co-optimization of electricity transmission and generation resources for planning and policy analysis: review of concepts and modeling approaches". Energy Systems, Vol. 7, No.2, pp. 297-332, May, 2016.
DOI
|
8 |
Jang, J. S. R., Sun, C. T., & Mizutani, E., Neuro-fuzzy and soft computing; a computational approach to learning and machine intelligence, Prentice Hall, Upper Saddle River, pp. 423-425, 1997.
|
9 |
R. E. Rosenthal, GAMS - A User's Guide, GAMS Development Corporation, 2014.
|
10 |
Korea Power Exchange, Cost-Based Pool Market Rules, Dec., 2016.
|
11 |
Korea Electric Power CO., A Study on the Optimization of Generator Maintenance Scheduling during the High Reserve Rate Periods, Sep., 2015.
|
12 |
Shahidehpour, M., & Marwali, M, Maintenance scheduling in restructured power systems, Springer Science & Business Media, pp. 53-54, 2012.
|
13 |
Park, Y. S., Kim, J. H., & Park, J. H., "Generating Unit Maintenance Scheduling Considering Regional Reserve Constraints and Transfer Capability Using Hybrid PSO Algorithm", The Transaction of The Korean Institute of Electrical Engineers, Vol. 56, No. 11, pp. 1892-1902, Nov., 2007.
|
14 |
Bisanovic, S., Hajro, M., & Dlakic, M, "A profit-based maintenance scheduling of thermal power units in electricity market", International Journal of Electrical and Electronics Engineering, Vol. 5, No. 3, pp. 156-164, 2011.
|