• Title/Summary/Keyword: Electrical load

Search Result 6,127, Processing Time 0.031 seconds

Dual Mode Phase-Shifted ZVS-PWM Series Load Resonant High-Frequency Inverter for Induction Heating Super Heated Steamer

  • Hisayuki Sugimura;Hidekazu Muraoka;Tarek Ahmed;Srawouth Chandhaket;Eiji Hiraki;Mutsuo Nakaoka;Lee, Hyun-Woo
    • Journal of Power Electronics
    • /
    • v.4 no.3
    • /
    • pp.138-151
    • /
    • 2004
  • In this paper, a constant frequency phase shifting PWM-controlled voltage source full bridge-type series load resonant high-frequency inverter using the $4^{th}$ generation IGBT power modules is presented for innovative consumer electromagnetic induction heating applications, such as a hot water producer, steamer and super heated steamer. The bridge arm side link passive capacitive snubbers in parallel with each power semiconductor device and AC load side linked active edge inductive snubber-assisted series load resonant tank soft switching inverter with a constant frequency phase shifted PWM control scheme is evaluated and discussed on the basis of the simulation and experimental results. It is proved from a practical point of view that the series load resonant and edge resonant hybrid high-frequency inverter topology, what is called, DE class type, including the variable-power variable-frequency regulation function can expand zero voltage soft switching commutation area even under low output power setting ranges, which is more suitable and acceptable for newly developed induction heated dual pack fluid heaters. Furthermore, even the lower output power regulation mode of this high-frequency load resonant tank inverter circuit is verified so that this inverter can achieve ZVS with the aid of the single auxiliary inductor snubber.

Development of Short-Term Load Forecasting Method by Analysis of Load Characteristics during Chuseok Holiday (추석 연휴 전력수요 특성 분석을 통한 단기전력 수요예측 기법 개발)

  • Kwon, Oh-Sung;Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.12
    • /
    • pp.2215-2220
    • /
    • 2011
  • The accurate short-term load forecasting is essential for the efficient power system operation and the system marginal price decision of the electricity market. So far, errors of load forecasting for Chuseok Holiday are very big compared with forecasting errors for the other special days. In order to improve the accuracy of load forecasting for Chuseok Holiday, selection of input data, the daily normalized load patterns and load forecasting model are investigated. The efficient data selection and daily normalized load pattern based on fuzzy linear regression model is proposed. The proposed load forecasting method for Chuseok Holiday is tested in recent 5 years from 2006 to 2010, and improved the accuracy of the load forecasting compared with the former research.

Short-term Electric Load Prediction Considering Temperature Effect (단파효과를 고려한 단기전력 부하예측)

  • 박영문;박준호
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.35 no.5
    • /
    • pp.193-198
    • /
    • 1986
  • In this paper, 1-168 hours ahead load prediction algorithm is developed for power system economic weekly operation. Total load is composed of three components, which are base load, week load and weather-sensitive load. Base load and week load are predicted by moving average and exponential smoothing method, respectively. The days of moving average and smoothing constant are optimally determined. Weather-sensitive load is modeled by linear form. The paramiters of weather load model are estimated by exponentially weighted recursive least square method. The load prediction of special day is very tedious, difficult and remains many problems which should be improved. Test results are given for the day of different types using the actual load data of KEPCO.

  • PDF

Grouping Method of Loads to Verify the Aggregation of Component Load Models (개별부하 축약을 검증하기 위한 집단부하 구성방법에 관한 연구)

  • Ji, Pyeong-Shik;Lee, Jong-Pil;Lim, Jae-Yoon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.4
    • /
    • pp.172-179
    • /
    • 2001
  • A component based method out of load modeling is to aggregate component load model according to the composition rate of each component load at load bus based on the circuit theory. But the most of component loads respond complex nonlinear characteristics respect to voltage and frequency variation due to the control techniques and semiconductor elements applied to component load. It needs to verify this approach through actual experiment of the aggregation of component load even if it can be down. To identify this aggregation method well known, this paper is proposed the classifying method of component load characteristics for component loads to group by quantitative analysis. The component load characteristics were divided into several types by KSOM (kohonen self organizing map), which can classify multi-dimension vector, component load pattern, into two-dimension vector. Some ambiguous cases happened from KSOM were classified by the proposed closing degree.

  • PDF

Development of ARIMA-based Forecasting Algorithms using Meteorological Indices for Seasonal Peak Load (ARIMA모델 기반 생활 기상지수를 이용한 동·하계 최대 전력 수요 예측 알고리즘 개발)

  • Jeong, Hyun Cheol;Jung, Jaesung;Kang, Byung O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.10
    • /
    • pp.1257-1264
    • /
    • 2018
  • This paper proposes Autoregressive Integrated Moving Average (ARIMA)-based forecasting algorithms using meteorological indices to predict seasonal peak load. First of all, this paper observes a seasonal pattern of the peak load that appears intensively in winter and summer, and generates ARIMA models to predict the peak load of summer and winter. In addition, this paper also proposes hybrid ARIMA-based models (ARIMA-Hybrid) using a discomfort index and a sensible temperature to enhance the conventional ARIMA model. To verify the proposed algorithm, both ARIMA and ARIMA-Hybrid models are developed based on peak load data obtained from 2006 to 2015 and their forecasting results are compared by using the peak load in 2016. The simulation result indicates that the proposed ARIMA-Hybrid models shows the relatively improved performance than the conventional ARIMA model.

Three-Phase Reference Current Generator Employing with Kalman Filter for Shunt Active Power Filter

  • Hasim, Ahmad Shukri Abu;Ibrahim, Zulkifilie;Talib, Md. Hairul Nizam;Dardin, Syed Mohd. Fairuz Syed Mohd.
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.151-160
    • /
    • 2017
  • This paper presents a new technique of reference current generator based on Kalman filter (KF) estimator for three-phase shunt active power filter (APF). The stationary reference frame (d-q algorithm) is used to transform the load currents into DC component. The harmonics of load currents are extracted and the three-phase reference currents are generated using KF estimator. The work is simulated using Matlab/Simulink platform. To validate the simulation results, an experimental test-rig have been perform using real-time control dSPACE DS1104. In addition, hysteresis current control was used to generate the switching signal for the correction of the harmonics in the system. The non-linear load were constructed with three-phase rectifier which connected in series with inductor and parallel with resistor and capacitor. The results shows that the new technique of shunt APF embedded with KF is proven to eliminate the harmonics created by the non-linear load with some improvement on the total harmonics distortion (THD).

Analysis of Gas Turbine Competitiveness and Adequacy of Electricity Market Signal in Korea (한국 전력시장에서의 가스터빈(GT) 발전기 경쟁력 및 시장 미진입 적정성 분석)

  • Kim, Eun Hwan;Park, Yong-Gi;Park, Jong-Bae;Roh, Jae Hyung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.8
    • /
    • pp.1172-1180
    • /
    • 2017
  • This study analyzed competition in peak load plants between CCGT and GT instead of competition between base and peak load plants like in previous studies. In common overseas power markets, CCGT and GT claim certain market shares as peak load plants with the latter boasting a high utilization rate as reserve plants. In South Korea, however, there has been no introduction of GT in the market that opened in 2001 with no analysis cases of GT's economy as a peak load plant. The current power market of South Korea is run on the cost-based pool, which allows for no price spikes. Since the capacity payment criteria for compensations for missing money are set based on GT generators, the power market uses GT generators as marginal plants. The purposes of this study were to analyze the competitive edge of GT generators as peak load plants in the domestic power market of South Korea and identify the causes of GT's failure in market entry, thus assessing the adequacy of market signals in the domestic power market.

Centralized Adaptive Under Frequency Load Shedding Schemes for Smart Grid Using Synchronous Phase Measurement Unit

  • Yang, D.Y.;Cai, G.W.;Jiang, Y.T.;Liu, C.
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.3
    • /
    • pp.446-452
    • /
    • 2013
  • Under frequency load shedding (UFLS) is an effective way to prevent system blackout after a serious disturbance occurs in a power system. A novel centralized adaptive under frequency load shedding (AUFLS) scheme using the synchronous phase measurement unit (PMU) is proposed in this paper. Two main stages are consisted of in the developed technique. In the first stage, the active power deficit is estimated by using the simplest expression of the generator swing equation and static load model since the frequency, voltages and their rate of change can be obtained by means of measurements in real-time from various devices such as phase measurement units. In the second stage, the UFLS schemes are adapted to the estimated magnitude based on the presented model. The effectiveness of the proposed AUFLS scheme is investigated simulating different disturbance in IEEE 10-generator 39-bus New England test system.

Short-term Electric Load Forecasting for Summer Season using Temperature Data (기온 데이터를 이용한 하계 단기전력수요예측)

  • Koo, Bon-gil;Kim, Hyoung-su;Lee, Heung-seok;Park, Juneho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.8
    • /
    • pp.1137-1144
    • /
    • 2015
  • Accurate and robust load forecasting model is very important in power system operation. In case of short-term electric load forecasting, its result is offered as an standard to decide a price of electricity and also can be used shaving peak. For this reason, various models have been developed to improve forecasting accuracy. In order to achieve accurate forecasting result for summer season, this paper proposes a forecasting model using corrected effective temperature based on Heat Index and CDH data as inputs. To do so, we establish polynomial that expressing relationship among CDH, load, temperature. After that, we estimate parameters that is multiplied to each of the terms using PSO algorithm. The forecasting results are compared to Holt-Winters and Artificial Neural Network. Proposing method shows more accurate by 1.018%, 0.269%, 0.132% than comparison groups, respectively.

Implementation of Under Voltage Load Shedding for Fault Induced Delayed Voltage Recovery Phenomenon Alleviation

  • Lee, Yun-Hwan;Park, Bo-Hyun;Oh, Seung-Chan;Lee, Byong-Jun;Shin, Jeong-Hoon;Kim, Tae-Kyun
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.406-414
    • /
    • 2014
  • Significant penetration of induction motor loads into residential neighborhood and commercial regions of local transmission systems at least partially determine a vulnerability to a fault induced delayed voltage recovery (FIDVR) event. Highly concentrated induction motor loads with constant torque could stall in response to low voltages associated with system faults. FIDVR is caused by wide spread stalling of small HVAC units (residential air conditioner) during transmission level faults. An under voltage load shedding scheme (UVLS) can be an effective component in a strategy to manage FIDVR risk and limit the any potential disturbance. Under Voltage Load Shedding take advantage of the plan to recovery the voltage of the system by shedding the load ways to alleviation FIDVR.