Kim, Dong-Woo;Lim, Young-Bea;Lee, Sang-Ick;Kim, Jae-Hyun;Kang, Dae-Chul
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.6
/
pp.82-87
/
2013
Electrical leakage happens when faults in electrical apparatus or power lines occur. It causes electrical fires and electric shocks. In order to reduce accidents caused by electrical leakage current, it is important to detect faults effectively and shut off the power. In this paper, firstly we analyzed statistics of electrical fires and electric shocks caused by electrical leakage current. Secondly, standards of allowable leakage current and body impedance models were analyzed. Lastly, effective application methods for breaking electrical leakage current were suggested. The results will provide useful preventive measures of electrical fires and electric shocks caused by electrical leakage.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.58
no.2
/
pp.221-226
/
2009
In this paper, we analyzed form of flowing leakage current in electrical installation. Leakage current ($I_g$) is consisted of resistive leakage current($I_{gr}$), capacitive leakage current($I_{gc}$), and inductive leakage current($I_{gl}$). Resistive leakage current($I_{gr}$) is big occasion than capacitive leakage current($I_{gc}$) in system, Residual Current Protective Device(RCD) detects correctly leakage current. But,$I_{gc}$ is big occasion than $I_{gr}$, RCD is malfunctioned It is resistance to lead to electric fire in electrical device. We manufactured outlet that resistive leakage current detecting circuit is had. Manufactured outlet displayed performance exactly in leakage current of 5 mA Therefore, this product estimates that contribute on electric fire courtesy call.
Kim, Jae-Hyun;Lim, Young-Bea;Lee, Sang-Ick;Kim, Dong-Woo
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.9
/
pp.90-99
/
2013
To analyze the effectiveness of the resistive leakage current monitoring as a technology preventing electrical accidents, in this paper, we have estimated the phase of the body impedance by using the body impedance model and the body impedance data from IEC. We also have analyzed the phase of the electric body current in the case of 60Hz/220V. From these results, we concluded that deliberate researches about the phase of the electrical body current and related regulations must be carried out before the resistive leakage current monitoring unit is used to protect electric shock. And we concluded that the resistive leakage current monitoring unit can be utilized to prevent electrical fires caused by electric leakage current without unwanted circuit break due to capacitive leakage current flowing from line filter capacitors to the earth.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.4
/
pp.885-891
/
2011
In this paper, we studied dc leakage current properties analysis of LED lamps of road and landscape lighting when leakage current appeared in dc power line. Generally, converter of LED lighting is divides to insulated type and non-insulated type according to components. When electric leakage happened in AC power line, earth leakage breaker(ELB) senses leakage current and interrupts electric circuit. In dc power source, We need experimental verification about dc electric leakage for electricity safety. In normal wiring conditions and in the water, in case of using insulated type of converter, dc leakage current did not occur. However, in case of using non-insulated type of converter, dc leakage current occurred and passed through into the ground. We found that there is a hazard of electric shock by dc leakage current. We expect that the results of these studies would be helpful for electrical safety of LED lamps for road and landscape lighting.
This paper is purposed to analyze electric leakage component which can prevent electrical fires on breaker capacity expansion and power failure by operation of ELB(Earth leakage breaker) for stable sizes. In order to analysis for electric leakage component for stable sizes, this paper studied field state investigation which are at stable companies( 10 companies) in cheong-won location to deduce the problems of electric leakage component is analyzed. The field state experiment method is measured with electric leakage component which load part of ELB detected by electric loads(electrical fan, lighting, auto waterer, feeder and halogen lighting) and stable sizes. Results show that electric leakage component suggested in this paper are valuable and usable to electrical fire in leakage current based on environment factor, which will prevent severe damage to human beings and properties and reduce the electrical fires in stable.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
1999.11a
/
pp.501-504
/
1999
The polymer insulators which are installed on outdoor have a great advantage than porcelain and 71ass, due to suppression of leakage current, light weight, low cost, etc. It needs variable evaluation methods for application of these insulators on service. The analysis of measuring leakage current is useful for ageing diagnosis because of monitoring in real-time. In this paper, we look over the recovery of hydrophobicity of silicone rubber in mini salt-fog chamber with leakage current monitoring. also, we understand the relation of between hydrophobicity and leakage current and discuss on method of leakage current monitoring.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2004.05b
/
pp.73-75
/
2004
Resistive leakage current following arresters is an important indicator of ageing, but total leakage current and its harmonic analysis are widely used in diagnosing arrester soundness because of difficulties in measuring resistive leakage current. In this paper, we proposed a new method for measuring resistive leakage current, which is quite different from the conventional methods such as a self-cancel method and a synchronous rectification method. The proposed method is based on that the magnitudes of resistive leakage currents are equal at the same voltage level. To confirm the possibility of the proposed method. we fabricated a leakage current measurement device and designed an analysis program that can analyze resistive leakage current. Comparing with other methods. this technique does not need a complex circuitry and is very simple to complete.
In this paper, we study from of flowing leakage current in electrical installation. Leakage current is expressed by a resistivity leakage current($I_{gr}$), a capacitive leakage current($I_{gc}$), an inductivity leakage current($I_{gl}$). General Zero Phase Current Transformer (ZCT) detect a leakage current($I_{g}$) that are conjoined resistivity leakage current and capacitive leakage current. In case $I_{gr}$ is big than $I_{gc}$, there is no singular problem in leakage current detection of system. But, in case $I_{gc}$ is big than $I_{gr}$, earth leakage breaker can not prevent accident effectively. Can lower electric leakage perception current to 5 mA if apply resistivity leakage current detecting circuit. We can achieve prevention of electricity disaster spontaneously.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.12
/
pp.2113-2118
/
2016
The precise detection of electric leakage point of underground power cable is very important to reduce cost and time of maintenance and prevent electric shock accident through expedite repair of electric leakage point. This paper proposes a electric leakage point detection system underground power cable using of half-period modulated transmission waveform and earth electric potential measurement. The developed system is composed of transmitter to generate the wanted pulse waveform, receiver to measure and display earth electric potential by the transmitted pulse in electric leakage point and PC Software program to display of GPS coordinate on detection cable line. The performance of the electric leakage point detection system was tested in the constructed underground cable leakage detection test bed. The test results on signal generation voltage precision of signal transmitter, mean detection earth voltage, mean detection leakage current and electric leakage point detection error showed the developed system can be used in electric leakage point detection underground power cable.
In this paper, the polymer insulators which had been used for electrical insulation were investigated surface leakage current and deterioration pattern. Because the electrical fault took place at the dust occurrence area due to environmental pollution. In particular, the dust accumulates easily on insulation material which is exposed an external long time. The leakage current brings out electrical fault after all. Also, it is need to variation of material and shape to repress a leakage current on electrical material. In this paper, we measured a leakage current on electrical material of facilities by dust, and in experiments the prevention to electrical fault was studied.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.